The project scope calls for the construction of an approximately 69,500 SF addition to the existing Bridgeton High School and program driven renovations of approximately 7,100 square-feet. The addition will consist of spaces to support an Early College High School education program, new classrooms and lab spaces, a new student services suite, and a gymnasium and related support spaces. Renovations include construction of a new larger Nurse’s Suite in the existing Student Services area and construction of new Life Skills Labs in place of a group of existing undersized classrooms. The project will provide additional capacity of 326 student seats in grades 9-12.

CURRENT STATUS - As of January 1, 2025: The preliminary project charter was approved by the SDA Board at the November 2022 meeting. A design-build procurement is anticipated in Q1/Q2 2025.

PROJECT INFORMATION

Key Parties:
Design-Build Contractor TBD
Design-Build Architect TBD
Construction Manager TBD

Schedule*:
Design Design NTP TBD
Start of Building Construction TBD
Anticipated School Opening TBD

Costs:
Total Estimated Project Costs $49.2 Million






*Please note that the anticipated milestone dates listed above are dependent on a number of variables and subject to change.


(PREVIOUS PROJECT) The school's media center addition project includes a new 6,000 square foot Media Center addition and renovation of the existing 4,000 square foot library. The project also includes an elevator addition for access to the second floor of the school that will make the school compliant with ADA regulations.

The school serves approximately 1,200 students in grades 9 through 12.

Martell Construction Company Inc. was awarded the construction contract July 30, 2008. A Certificate of Occupancy was issued November 12, 2009 following the completion of the work on the project. The project was managed by URS Corporate Group.

Bridgeton High School was constructed in 1952. Health and Safety projects have been completed at the high school and consisted of replacement of all windows and doors. Another project, completed in October 2005, consisted of new heating, ventilating and air conditioning equipment for the auditorium and replacement of the ceiling. The contractor was Bernal Mechanical.