The new High School will be built on the District-owned site of the existing Eastside High School. The school will be designed to educate a maximum of approximately 941 students in a 164,000 square-foot facility. |
CURRENT STATUS - As of August 1, 2026: The project is in bridging design. The former facility was vacated and students are now educated at the former Cramer Elementary School. An advertisement for design-build services was issued on July 17, 2026. Proposals are due September 29, 2026.
|
PROJECT INFORMATION
|
Key Parties:
|
Bridging Design Consultant |
DIGroup Architecture |
|
Design-Build Contractor |
TBD |
|
Design-Build Architect |
TBD |
|
Construction Manager |
TBD |
Schedule*:
|
Design |
Design NTP TBD |
|
Start of Building Construction |
TBD |
|
Anticipated School Opening |
TBD |
Costs:
|
Total Estimated Project Costs |
$115 Million |
|