Sheila Y. Oliver Academy |
|
The new 77,000 square-foot Sheila Y. Oliver Academy provides the East Orange School District with space to educate a maximum of approximately 500 students in Pre-Kindergarten to 5th grade. The school includes 24 general classrooms, two self-contained special education classrooms, a science lab, a cafeteria, multi-purpose room with stage, a media center, a music room, an art room, a technology lab and necessary support spaces. |
CURRENT STATUS - The project is substantially complete and occupied.
|
PROJECT INFORMATION
|
Key Parties:
|
Site Preparation/Demolition Construction Contractor |
Site Enterprises, Inc. |
|
Design-Build Contractor |
Dobco |
|
Design-Build Architect |
NK Architects |
|
Construction Manager |
STV Construction |
Schedule*:
|
Site Preparation Construction Activities |
Completed Q1 2017 |
|
Design |
Design NTP TBD |
|
Start of Building Construction |
5/25/18 |
|
Anticipated School Opening |
September 2020 |
Costs:
|
Total Estimated Project Costs |
$41.2 Million |
|
*Please note that the anticipated milestone dates listed above are dependent on a number of variables and subject to change.
|
|