Page: 1 2 3 4 5 6 Regular Operating District Grant Projects | | | | | | | | | | |
0010-050-02-0870 | Absecon City | Emma C. Attales E.S. | Replace classroom doors in the 1958 section and two pairs of egress doors in the gym | School Facility Project | Rehab of Existing Facility | Completed | $17,450.00 | $17,450.00 | $6,980.00 | $10,470.00 |
0010-050-02-1166 | Absecon City | Emma C. Attales E.S. | Rehab including: upgrades to access drive, curbs and sidewalks, new lockers, bleachers & divider curtain in gym, replace roof, new HVAC system, toilet room upgrades, new security, data-ports, telephone & fire alarm systems | School Facility Project | Rehab of Existing Facility | Completed | $2,050,766.46 | $1,852,559.00 | $741,024.00 | $1,309,742.46 |
0010-060-02-0869 | Absecon City | H. Ashton Marsh E.S. | Replace toilet partitions with phenolic compartments | School Facility Project | Rehab of Existing Facility | Completed | $12,600.00 | $12,600.00 | $5,040.00 | $7,560.00 |
0010-060-02-1167 | Absecon City | H. Ashton Marsh E.S. | Rehab including: Playground upgrades, new wood floor in gym, replace roof, new floor finishes in classrooms & corridor, new HVAC system, electrical upgrades, new security, data-ports, telephone & fire systems. | School Facility Project | Rehab of Existing Facility | Completed | $1,766,739.81 | $1,766,739.81 | $706,695.92 | $1,060,043.89 |
0020-005-01-0532 | Alexandria Township | Alexandria M.S. | Addition of Classrooms, SGI, Tech lab, science lab; Renovation of office space and storage space into core spaces | School Facility Project | Addition and Rehab of Existing Facility | Completed | $6,541,000.00 | $3,964,971.00 | $1,585,988.00 | $4,955,012.00 |
0020-010-03-0825 | Alexandria Township | Lester D. Wilson E.S. | Asbestos abatement, ceiling replacement, and asbestos flooring replacement. | School Facility Project | Rehab of Existing Facility | Completed | $80,579.25 | $80,579.25 | $32,231.70 | $48,347.55 |
0020-010-03-0826 | Alexandria Township | Lester D. Wilson E.S. | Replacement of fire alarm for the entire building. | School Facility Project | Rehab of Existing Facility | Completed | $74,511.72 | $74,511.72 | $29,804.69 | $44,707.03 |
0030-010-03-0780 | Allamuchy Township | Allamuchy Township E.S. | 1. 5120 SF Roof Replacement | School Facility Project | Rehab of Existing Facility | Completed | $59,247.00 | $59,247.00 | $23,698.80 | $35,548.20 |
0030-010-05-0AEE | Allamuchy Township | Allamuchy Township E.S. | Roof Replacement | School Facility Project | Rehab of Existing Facility | Completed | $196,700.00 | $196,700.00 | $78,680.00 | $118,020.00 |
0040-010-00-0014 | Allendale | Brookside E.S. | Addition(s) to Brookside School and conversion of media center, music/art/home ec room | Retro | Addition To Existing Facility | Completed | $4,541,056.64 | $4,215,048.00 | $1,686,019.20 | $2,855,037.44 |
0040-020-00-0013 | Allendale | Hillside E.S. | New 14,400-s.f. Construction - multipurpose room & music room. Rehab/Convert - 2 classrooms & 2 kindergartens. | Retro | Addition and Rehab of Existing Facility | Completed | $5,163,041.36 | $2,339,700.00 | $935,880.00 | $4,227,161.36 |
0060-020-04-0AEW | Alloway Township | Alloway Twp. E.S. | State Share Grant Request for a new addition and rehabilitation. | School Facility Project | Rehab of Existing Facility | Executed | $6,084,047.48 | $5,235,679.00 | $2,667,720.00 | $3,416,327.48 |
0070-010-02-0707 | Alpha | Alpha E.S. | Re-roofing - 1917 building section | School Facility Project | Rehab of Existing Facility | Executed | $37,950.00 | $37,950.00 | $18,175.36 | $19,774.64 |
0070-010-03-0817 | Alpha | Alpha E.S. | Exterior door replacement | School Facility Project | Rehab of Existing Facility | Completed | $45,106.00 | $45,106.00 | $23,076.00 | $22,030.00 |
0080-010-02-1052 | Alpine | Alpine Public E.S. | HVAC System Upgrade | School Facility Project | Rehab of Existing Facility | Completed | $524,701.00 | $432,210.00 | $172,884.00 | $351,817.00 |
0080-010-02-1098 | Alpine | Alpine Public E.S. | Classroom floor tile abatement and replacement | School Facility Project | Rehab of Existing Facility | Completed | $50,760.00 | $50,760.00 | $20,304.00 | $30,456.00 |
0080-010-03-1092 | Alpine | Alpine Public E.S. | Classroom Floor Tile Abatement. Classroom Floor Tile Replacement. | School Facility Project | Rehab of Existing Facility | Executed | $64,500.00 | $64,500.00 | $25,800.00 | $38,700.00 |
0090-010-04-0AKR | Andover Regional | Florence M. Burd E.S. | Addition and Rehabilitation | School Facility Project | Addition and Rehab of Existing Facility | Executed | $7,575,082.28 | $6,405,663.00 | $2,562,265.00 | $5,012,817.28 |
0090-040-04-0AEX | Andover Regional | Long Pond M.S. | Rehabilitation | School Facility Project | Rehab of Existing Facility | Executed | $346,074.49 | $346,074.49 | $138,429.79 | $207,644.70 |
0110-010-04-0AAY | Atlantic City | Atlantic City H.S. | Pre-Development request for Chiller replacement, Boiler replacement and air conditioning projects for the existing High School. | School Facility Project | Rehab of Existing Facility | Completed | $0.00 | $0.00 | $0.00 | $0.00 |
0110-050-04-0AAZ | Atlantic City | Chelsea Heights E.S. | Pre-Development request for a Fire Alarm and Detection System. | School Facility Project | Rehab of Existing Facility | Completed | $103,978.00 | $103,978.00 | $41,591.20 | $62,386.80 |
0110-N01-00-0067 | Atlantic City | Sovereign Avenue School | New Sovereign Avenue School | School Facility Project | New Construction | Completed | $21,644,820.00 | $13,705,332.00 | $5,482,133.00 | $16,162,687.00 |
0125-N01-99-0489 | Atlantic Cty Spec Serv Sch Dist | New Special Services School | The 177,000 sf facility will replace existing special services facility and will include multi-purpose room, a gymnasium, time-out rooms, and changing rooms. It will also provide job-training opportunities in the restaurant. | Retro | Addition and Rehab of Existing Facility | Completed | $24,426,000.00 | $24,426,000.00 | $9,770,400.00 | $14,655,600.00 |
0130-020-02-1112 | Atlantic Highlands | Atlantic Highlands E.S. | Addition of computer and science classrooms, cafeteria/multi-purpose room, etc. Renovations to kindergarten classroom, pre-K classroom, Music/band classroom, OT/PT classroom, small group rooms and admin spaces | School Facility Project | Addition and Rehab of Existing Facility | Completed | $6,291,102.02 | $5,207,826.00 | $2,083,130.00 | $4,207,972.02 |
0150-010-02-1042 | Audubon | Audubon H.S. | Boiler and partial roof replacement | School Facility Project | Rehab of Existing Facility | Completed | $135,816.50 | $135,816.50 | $64,664.95 | $71,151.55 |
0150-010-04-00BS | Audubon | Audubon H.S. | Additions and renovations to existing facility | School Facility Project | Addition and Rehab of Existing Facility | Executed | $13,834,664.50 | $12,067,657.00 | $5,681,740.00 | $8,152,924.50 |
0150-010-04-00LD | Audubon | Audubon H.S. | The district is removing and replacing asbestos containing ceiling tiles in 25000sf of space in the jr./sr. high school. | School Facility Project | Rehab of Existing Facility | Completed | $278,987.50 | $278,987.50 | $131,354.01 | $147,633.49 |
0150-040-04-00BR | Audubon | Haviland Avenue E.S. | Additions and renovations to existing facility | School Facility Project | Addition and Rehab of Existing Facility | Executed | $1,765,530.00 | $1,575,132.00 | $741,610.00 | $1,023,920.00 |
0150-050-04-00BQ | Audubon | Mansion Avenue E.S. | Additions and renovations to existing facility | School Facility Project | Addition and Rehab of Existing Facility | Executed | $2,091,164.03 | $2,091,164.03 | $984,570.21 | $1,106,593.82 |
0170-010-02-0735 | Avalon | Avalon E.S. | Addition including art and music rooms, library media center, health suite, admin suite, science greenhouse, kitchen receiving/storage and gymnasium | School Facility Project | Addition and Rehab of Existing Facility | Completed | $7,308,796.73 | $4,030,178.00 | $1,612,071.00 | $5,696,725.73 |
0180-010-02-0473 | Avon Borough | Avon E.S. | fire alarm system upgrade | School Facility Project | Rehab of Existing Facility | Completed | $15,638.00 | $15,638.00 | $6,255.00 | $9,383.00 |
0185-010-02-0660 | Barnegat Township | Lillian M. Dunfee E.S. | Renovation of Field #1 | School Facility Project | Rehab of Existing Facility | Executed | $88,143.48 | $88,143.48 | $60,955.98 | $27,187.50 |
0185-010-02-0661 | Barnegat Township | Lillian M. Dunfee E.S. | Rehabilitation of Field #2 | School Facility Project | Rehab of Existing Facility | Executed | $68,128.62 | $68,128.62 | $47,114.62 | $21,014.00 |
0185-010-02-0662 | Barnegat Township | Lillian M. Dunfee E.S. | Heating and ventilation project | School Facility Project | Rehab of Existing Facility | Executed | $494,107.75 | $494,107.75 | $341,702.19 | $152,405.56 |
0185-010-02-0663 | Barnegat Township | Lillian M. Dunfee E.S. | Carpet replacement | School Facility Project | Rehab of Existing Facility | Executed | $27,852.99 | $27,852.99 | $19,261.85 | $8,591.14 |
0185-010-02-1092 | Barnegat Township | Lillian M. Dunfee E.S. | Replacement of existing exterior doors and frames | School Facility Project | Rehab of Existing Facility | Executed | $57,980.00 | $57,980.00 | $40,096.30 | $17,883.70 |
0185-015-02-0640 | Barnegat Township | Cecil S. Collins E.S. | Improvement tp Physical Education Facilities Field #2 | School Facility Project | Rehab of Existing Facility | Executed | $166,801.00 | $166,801.00 | $115,351.90 | $51,449.10 |
0185-015-02-0657 | Barnegat Township | Cecil S. Collins E.S. | Renovation of Phys Ed Field #1 | School Facility Project | Rehab of Existing Facility | Executed | $96,252.00 | $96,252.00 | $66,563.46 | $29,688.54 |
0185-015-02-0658 | Barnegat Township | Cecil S. Collins E.S. | Heating and ventilation | School Facility Project | Rehab of Existing Facility | Executed | $634,541.33 | $634,541.33 | $438,819.59 | $195,721.74 |
0185-015-02-0659 | Barnegat Township | Cecil S. Collins E.S. | Carpet replacment | School Facility Project | Rehab of Existing Facility | Executed | $38,100.94 | $38,100.94 | $26,348.86 | $11,752.08 |
0185-015-02-0956 | Barnegat Township | Cecil S. Collins E.S. | addition of new district board office to the Collins ES | School Facility Project | Rehab of Existing Facility | Executed | $568,244.99 | $568,244.99 | $392,972.10 | $175,272.89 |
0185-020-02-0664 | Barnegat Township | Elizabeth V. Edwards E.S. | Carpet replacement | School Facility Project | Rehab of Existing Facility | Executed | $8,080.25 | $8,080.25 | $5,587.93 | $2,492.32 |
0185-050-02-0641 | Barnegat Township | Russell O. Brackman M.S. | Improvments to Phys Ed facilities filed #1 | School Facility Project | Rehab of Existing Facility | Executed | $114,229.20 | $114,229.20 | $78,995.66 | $35,233.54 |
0185-050-02-0642 | Barnegat Township | Russell O. Brackman M.S. | Improvement to Phs Ed facilities Field #2 | School Facility Project | Rehab of Existing Facility | Executed | $135,644.58 | $135,644.58 | $93,805.55 | $41,839.03 |
0185-050-02-0652 | Barnegat Township | Russell O. Brackman M.S. | H&V core area heat pump replacment | School Facility Project | Rehab of Existing Facility | Executed | $526,857.90 | $526,857.90 | $364,350.70 | $162,507.21 |
0185-050-02-0653 | Barnegat Township | Russell O. Brackman M.S. | Fresh air system | School Facility Project | Rehab of Existing Facility | Executed | $548,606.00 | $548,606.00 | $379,390.67 | $169,215.33 |
0185-050-02-0654 | Barnegat Township | Russell O. Brackman M.S. | heat and vent pump replacement | School Facility Project | Rehab of Existing Facility | Executed | $543,780.00 | $543,780.00 | $376,053.24 | $167,726.76 |
0185-050-02-0655 | Barnegat Township | Russell O. Brackman M.S. | Partial roof replacement | School Facility Project | Rehab of Existing Facility | Executed | $140,300.01 | $140,300.01 | $97,025.03 | $43,274.98 |
0185-050-02-0656 | Barnegat Township | Russell O. Brackman M.S. | Carpet replacement | School Facility Project | Rehab of Existing Facility | Executed | $53,437.81 | $53,437.81 | $36,955.13 | $16,482.68 |
0185-050-02-1066 | Barnegat Township | Russell O. Brackman M.S. | conversion of woodshop to special education classrooms | School Facility Project | Rehab of Existing Facility | Executed | $376,215.84 | $376,215.84 | $260,173.57 | $116,042.27 |
0190-010-04-00AP | Barrington Borough | Avon E.S. | Addition of classrooms | School Facility Project | Addition and Rehab of Existing Facility | Executed | $6,357,339.00 | $4,983,894.00 | $1,993,558.00 | $4,363,781.00 |
0190-030-04-00AQ | Barrington Borough | Woodland E.S. | A 3,448 gsf Addition of 2 new classrooms and new Teacher's Workroom. Project includes renovation as well. | School Facility Project | Addition and Rehab of Existing Facility | Executed | $2,865,947.66 | $2,597,408.36 | $1,038,963.35 | $1,826,984.31 |
0210-020-02-0549 | Bay Head | Bay Head E.S. | Renovation of Boys/Girls toilet rooms; New electric service throughout the school; New branch circuits throughout the school | School Facility Project | Rehab of Existing Facility | Executed | $226,237.00 | $226,237.00 | $90,495.00 | $135,742.00 |
0220-020-04-00IJ | Bayonne | Bayonne H.S. | General capital improvements including : electrical, architectural, mechanical, plumbing, building energy. | School Facility Project | Rehab of Existing Facility | Executed | $11,707,986.00 | $11,707,986.00 | $4,683,194.00 | $7,024,792.00 |
0220-030-04-0AEY | Bayonne | Number 3, Walter F. Robinson E.S. | Addition and capital improvements to the existing facility including architectural, site, mechanical, electrical, plumbing, life safety, and building systems. | School Facility Project | Rehab of Existing Facility | Executed | $12,743,046.00 | $8,785,245.00 | $3,514,098.00 | $9,228,948.00 |
0220-040-04-00IK | Bayonne | Number 12, John M. Bailey E.S. | General capital improvements including : electrical, mechanical,plumbing, building energy. | School Facility Project | Rehab of Existing Facility | Executed | $920,474.00 | $920,474.00 | $368,190.00 | $552,284.00 |
0220-040-97-0328 | Bayonne | Number 12, John M. Bailey E.S. | | Retro | Addition and Rehab of Existing Facility | Executed | $2,239,471.00 | $1,595,556.00 | $638,222.40 | $1,601,248.60 |
0220-050-04-00IL | Bayonne | Henry E. Harris No. 1 E.S. | General capital improvement to school # 1 including masonry, site, finishes, architectural, mechanical, electrical, plumbing, building performance and energy. | School Facility Project | Rehab of Existing Facility | Executed | $1,775,702.00 | $1,775,702.00 | $710,281.00 | $1,065,421.00 |
0220-050-97-0375 | Bayonne | Henry E. Harris No. 1 E.S. | | Retro | Addition and Rehab of Existing Facility | Executed | $1,934,088.00 | $1,780,200.00 | $712,080.00 | $1,222,008.00 |
0220-060-04-00IM | Bayonne | Horace Mann No. 6 E.S. | General capital improvements including: architectural, mechanical,electrical, plumbing, site work, building energy. | School Facility Project | Rehab of Existing Facility | Executed | $531,855.00 | $531,855.00 | $212,742.00 | $319,113.00 |
0220-070-04-00IN | Bayonne | Lincoln No. 5 E.S. | General capital improvements including: architectural, mechanical, electrical, plumbing, site work, building enrgy | School Facility Project | Rehab of Existing Facility | Executed | $686,718.00 | $686,718.00 | $274,687.00 | $412,031.00 |
0220-080-04-00IO | Bayonne | Mary J. Donohoe No. 4 E.S. | General capital improvements including: architectural, mechanical, electrical, plumbing, site work, building enrgy | School Facility Project | Rehab of Existing Facility | Executed | $626,700.00 | $626,700.00 | $250,680.00 | $376,020.00 |
0220-080-97-0327 | Bayonne | Mary J. Donohoe No. 4 E.S. | | Retro | Addition and Rehab of Existing Facility | Executed | $2,544,853.00 | $2,102,430.00 | $840,972.00 | $1,703,881.00 |
0220-085-04-00IP | Bayonne | Midtown Community E.S. | General capital improvements including: architectural, mechanical, electrical, plumbing, site work, building enrgy | School Facility Project | Rehab of Existing Facility | Executed | $2,205,104.00 | $2,205,104.00 | $882,042.00 | $1,323,062.00 |
0220-090-04-00IQ | Bayonne | Phillip G. Vroom No. 2 E.S. | General capital improvements including: Architectural and building systems energy efficiency. | School Facility Project | Rehab of Existing Facility | Executed | $266,250.00 | $266,250.00 | $106,500.00 | $159,750.00 |
0220-120-04-00IR | Bayonne | Washington No. 9 E.S. | General capital improvements including: architectural, electrical, building enrgy | School Facility Project | Rehab of Existing Facility | Executed | $2,316,984.00 | $2,316,984.00 | $926,794.00 | $1,390,190.00 |
0220-120-97-0373 | Bayonne | Washington No. 9 E.S. | | Retro | Addition and Rehab of Existing Facility | Executed | $3,461,000.00 | $3,091,200.00 | $1,236,480.00 | $2,224,520.00 |
0220-130-04-0AEZ | Bayonne | Woodrow Wilson No. 10 E.S. | Addition and capital improvements to the existing facility including architectural, mechanical,site, electrical, plumbing, life safety, and building systems. | School Facility Project | Rehab of Existing Facility | Executed | $10,843,544.00 | $7,550,803.00 | $3,020,321.00 | $7,823,223.00 |
0220-x02-04-0AFA | Bayonne | New School No.14 | Demolition of the existing school No. 14 and replacement with a new facility | School Facility Project | Rehab of Existing Facility | Completed | $17,998,205.00 | $10,010,000.00 | $4,004,000.00 | $13,994,205.00 |
0230-020-02-0977 | Beach Haven Borough | Beach Haven E.S. | Closure of underground oil tank | School Facility Project | Rehab of Existing Facility | Executed | $5,660.00 | $5,660.00 | $2,264.00 | $3,396.00 |
0230-020-02-1038 | Beach Haven Borough | Beach Haven E.S. | Conversion of oil burner to gas | School Facility Project | Rehab of Existing Facility | Executed | $8,500.00 | $8,500.00 | $3,400.00 | $5,100.00 |
0250-020-03-1123 | Belleville | Belleville Senior H.S. | Doors & hardware replacement | School Facility Project | Rehab of Existing Facility | Completed | $78,378.68 | $78,378.68 | $31,743.21 | $46,635.47 |
0250-020-04-0ASU | Belleville | Belleville Senior H.S. | Installation of Fiber Optic Communications System | School Facility Project | Rehab of Existing Facility | Executed | $177,502.00 | $177,502.00 | $71,888.00 | $105,614.00 |
0250-020-05-0AIL | Belleville | Belleville Senior H.S. | This project consists of the replacement of the existing roof. | School Facility Project | Rehab of Existing Facility | Completed | $734,077.39 | $734,077.39 | $297,299.87 | $436,777.52 |
0250-025-01-0805 | Belleville | Belleville M.S. | installation of an elevator | School Facility Project | Rehab of Existing Facility | Executed | $329,777.30 | $329,777.30 | $132,417.13 | $197,360.17 |
0250-025-03-1124 | Belleville | Belleville M.S. | doors & hardware replacement | School Facility Project | Rehab of Existing Facility | Completed | $53,490.38 | $53,490.38 | $21,663.50 | $31,826.88 |
0250-025-04-0ASV | Belleville | Belleville M.S. | Installation of Fiber Optic Communication System | School Facility Project | Rehab of Existing Facility | Executed | $75,908.00 | $75,908.00 | $30,743.00 | $45,165.00 |
0250-050-03-0738 | Belleville | Number 3 E.S. | Window Replacement. | School Facility Project | Rehab of Existing Facility | Completed | $128,808.00 | $128,808.00 | $52,167.00 | $76,641.00 |
0250-050-03-1125 | Belleville | Number 3 E.S. | Doors and Hardware Replacement. | School Facility Project | Rehab of Existing Facility | Completed | $43,456.37 | $43,456.37 | $17,599.82 | $25,856.55 |
0250-050-04-0ASW | Belleville | Number 3 E.S. | Installation of Fiber Optic Communication System | School Facility Project | Rehab of Existing Facility | Executed | $75,908.00 | $75,908.00 | $30,743.00 | $45,165.00 |
0250-055-04-0ASX | Belleville | Number 4 E.S. | Installation of Fiber Optic Communication System | School Facility Project | Rehab of Existing Facility | Executed | $75,908.00 | $75,908.00 | $30,743.00 | $45,165.00 |
0250-060-03-0739 | Belleville | Number 5 E.S. | Replacement of Windows and Lintels. | School Facility Project | Rehab of Existing Facility | Executed | $516,709.45 | $516,709.45 | $209,266.00 | $307,443.45 |
0250-060-03-1126 | Belleville | Number 5 E.S. | Replacement of Exterior Doors & Hardware. | School Facility Project | Rehab of Existing Facility | Completed | $48,445.86 | $48,445.86 | $19,620.48 | $28,825.38 |
0250-060-04-0ASY | Belleville | Number 5 E.S. | Installation of Fiber Optic Communications System | School Facility Project | Rehab of Existing Facility | Executed | $75,908.00 | $75,908.00 | $30,743.00 | $45,165.00 |
0250-060-05-0AUX | Belleville | Number 5 E.S. | Asbestos Removal | School Facility Project | Rehab of Existing Facility | Completed | $75,670.00 | $75,670.00 | $30,646.20 | $45,023.80 |
0250-070-03-1134 | Belleville | Number 7 E.S. | Window Replacement. | School Facility Project | Rehab of Existing Facility | Completed | $42,638.97 | $42,638.97 | $17,268.70 | $25,370.27 |
0250-070-04-0ASZ | Belleville | Number 7 E.S. | Installation of Fiber Optic Communications System | School Facility Project | Rehab of Existing Facility | Executed | $78,831.00 | $78,831.00 | $31,926.00 | $46,905.00 |
0250-080-03-0748 | Belleville | Number 8 E.S. | Roof Replacement. | School Facility Project | Rehab of Existing Facility | Completed | $171,349.65 | $171,349.65 | $69,396.27 | $101,953.38 |
0250-080-03-1135 | Belleville | Number 8 E.S. | Window, Doors and Hardware Replacement. | School Facility Project | Rehab of Existing Facility | Completed | $47,237.94 | $47,237.94 | $19,131.27 | $28,106.67 |
0250-080-04-0ATA | Belleville | Number 8 E.S. | Installation of Fiber Optic Communications System | School Facility Project | Rehab of Existing Facility | Executed | $75,908.00 | $75,908.00 | $30,743.00 | $45,165.00 |
0250-090-03-1200 | Belleville | Number 9 E.S. | Parapet Wall Repair | School Facility Project | Rehab of Existing Facility | Completed | $226,472.64 | $226,472.64 | $91,720.97 | $134,751.67 |
0250-090-04-0ATB | Belleville | Number 9 E.S. | Installation of Fiber Optic Communications System | School Facility Project | Rehab of Existing Facility | Executed | $75,908.00 | $75,908.00 | $30,743.00 | $45,165.00 |
0250-100-03-1127 | Belleville | Number 10 E.S. | Doors and Hardware Replacement. | School Facility Project | Rehab of Existing Facility | Completed | $6,288.42 | $6,288.42 | $2,546.80 | $3,741.62 |
0250-100-04-00LW | Belleville | Number 10 E.S. | Boiler replacement | School Facility Project | Rehab of Existing Facility | Completed | $441,874.59 | $441,874.59 | $178,958.33 | $262,916.26 |
0260-015-02-0871 | Bellmawr Borough | Bell Oaks E.S. | Emergent replacement of boilers | School Facility Project | Rehab of Existing Facility | Completed | $189,577.43 | $189,577.43 | $75,830.97 | $113,746.45 |
0260-015-04-0APD | Bellmawr Borough | Bell Oaks E.S. | Renovations of storm drainage and walkway. | School Facility Project | Rehab of Existing Facility | Executed | $29,083.81 | $29,083.81 | $11,633.52 | $17,450.29 |
0260-020-05-0APE | Bellmawr Borough | Bellmawr Park E.S. | Renovations of storm drainage and walkway | School Facility Project | Rehab of Existing Facility | Completed | $131,504.30 | $131,504.30 | $52,601.72 | $78,902.58 |
0260-030-04-0APF | Bellmawr Borough | Ethel M. Burke E.S. | Renovations of classrooms and nurses area | School Facility Project | Rehab of Existing Facility | Completed | $204,237.45 | $204,237.45 | $81,694.98 | $122,542.47 |
0260-030-05-0APG | Bellmawr Borough | Ethel M. Burke E.S. | Renovations of storm drainage and walkway | School Facility Project | Rehab of Existing Facility | Completed | $338,189.41 | $338,189.41 | $135,275.76 | $202,913.65 |
0270-020-03-0419 | Belmar | Belmar E.S. | Roof replacement, emergency egress & exit lighting repairs, floor and ceiling replacement at classrooms & corridors, and asbestos abatement (roof) | School Facility Project | Rehab of Existing Facility | Completed | $2,465,636.00 | $2,465,636.00 | $986,254.40 | $1,479,381.60 |
0270-020-03-0480 | Belmar | Belmar E.S. | Upgrades to HVAC system | School Facility Project | Rehab of Existing Facility | Completed | $3,151,336.20 | $3,151,336.00 | $1,260,534.00 | $1,890,802.20 |
0280-020-02-0863 | Belvidere | Belvidere H.S. | Re-roofing | School Facility Project | Rehab of Existing Facility | Completed | $88,515.00 | $88,515.00 | $47,016.00 | $41,499.00 |
0280-030-03-0023 | Belvidere | Oxford Street E.S. | Rehabilitation - Capital Maintenance Replacement of approximately 14,500 sq ft. of roofing. Project affects health and safety by maintaining building envelope. | School Facility Project | Rehab of Existing Facility | Executed | $163,050.00 | $163,050.00 | $89,241.99 | $73,808.01 |
0280-050-05-0DAH | Belvidere | Third Street E.S. | Reroof existing shingle roof. | School Facility Project | Rehab of Existing Facility | Completed | $68,700.00 | $68,700.00 | $37,601.00 | $31,099.00 |
0285-030-03-0258 | Bergen County Special Services District | Program 1-Hearing Impaired | Total HVAC Mechanical System Replacement | School Facility Project | Rehab of Existing Facility | Completed | $219,933.90 | $194,247.00 | $77,699.00 | $142,234.90 |
0285-050-03-0259 | Bergen County Special Services District | Program 3-Emotionally Disturb. | Renovations to the HVAC equipment | School Facility Project | Rehab of Existing Facility | Completed | $1,254,724.48 | $1,254,724.48 | $501,889.79 | $752,834.69 |
0285-070-03-0375 | Bergen County Special Services District | Program 5-Life Skills | Alteration/renovation of 2-story masonry bldg, upgrade existing outdated MEP & fire protection systems & replace roofing sys. | School Facility Project | Rehab of Existing Facility | Completed | $2,996,967.89 | $2,994,359.00 | $1,197,744.00 | $1,925,824.02 |
0290-020-02-0220 | Bergen County Vocational School District | Academies Voc. & Tech. High, Hackensack | Academies Auto Trades - Rehab roof. | School Facility Project | Rehab of Existing Facility | Completed | $231,754.36 | $231,754.36 | $92,701.74 | $139,052.62 |
0290-020-02-0447 | Bergen County Vocational School District | Academies Voc. & Tech. High, Hackensack | Academies H.S. - Physics lab renovations. | School Facility Project | Rehab of Existing Facility | Completed | $1,792,000.00 | $1,792,000.00 | $716,800.00 | $1,075,200.00 |
0290-020-03-0633 | Bergen County Vocational School District | Academies Voc. & Tech. High, Hackensack | Renovations to existing facility | School Facility Project | Rehab of Existing Facility | Executed | $536,586.28 | $380,159.00 | $152,064.00 | $384,522.28 |
0290-020-03-0715 | Bergen County Vocational School District | Academies Voc. & Tech. High, Hackensack | Renovations to existing facility | School Facility Project | Rehab of Existing Facility | Completed | $956,285.74 | $956,285.74 | $382,514.30 | $573,771.44 |
0290-030-04-0AEF | Bergen County Vocational School District | Vocational, Paramus (Spec. Need) | One story addition to existing building linking two buildings that include 4 classrooms, one computer lab, and one Physics Lab. | School Facility Project | Addition and Rehab of Existing Facility | Executed | $2,678,673.00 | $2,678,673.00 | $1,067,198.79 | $1,600,798.19 |
0290-070-01-0823 | Bergen County Vocational School District | Vocational, Teterboro | Addition of gymnasium, general classrooms, locker room, etc. | School Facility Project | Addition To Existing Facility | Completed | $5,307,159.00 | $5,307,159.00 | $2,122,864.00 | $3,184,295.00 |
0290-070-02-0095 | Bergen County Vocational School District | Vocational, Teterboro | Technical H.S - interior renovations/change of use of auditorium to SGI classrooms | School Facility Project | Rehab of Existing Facility | Completed | $85,000.00 | $85,000.00 | $34,000.00 | $51,000.00 |
0290-070-02-0445 | Bergen County Vocational School District | Vocational, Teterboro | Technical H.S. - Renovations to 3 Classrooms and a lab | School Facility Project | Rehab of Existing Facility | Completed | $305,000.00 | $305,000.00 | $122,000.00 | $183,000.00 |
0290-070-03-0543 | Bergen County Vocational School District | Vocational, Teterboro | Renovation to 3,300-gsf: 3 Academic classrooms & electronics lab (formerly masonry shop/storage). Related furniture & equipment. | School Facility Project | Rehab of Existing Facility | Completed | $1,099,491.07 | $912,269.00 | $364,908.00 | $734,583.07 |
0290-070-04-0AEG | Bergen County Vocational School District | Vocational, Teterboro | Change-of-use: Covert obsolete gym to auditorium. | School Facility Project | Rehab of Existing Facility | Executed | $721,362.00 | $721,362.00 | $288,545.00 | $432,817.00 |
0290-070-04-0AEH | Bergen County Vocational School District | Vocational, Teterboro | Change-of-use: Convert obsolete locker rooms to music instruction room. | School Facility Project | Rehab of Existing Facility | Executed | $273,400.00 | $273,400.00 | $109,360.00 | $164,040.00 |
0290-075-02-0446 | Bergen County Vocational School District | Vocational, Paramus | Technical Education Center - Renovations to science labs, vestibule, related furniture & equipment | School Facility Project | Rehab of Existing Facility | Completed | $205,328.00 | $205,328.00 | $82,131.20 | $123,196.80 |
0300-020-02-0901 | Bergenfield | Bergenfield H.S. | Refurbish 826 existing auditorium chairs | School Facility Project | Rehab of Existing Facility | Completed | $117,490.74 | $117,490.74 | $46,996.30 | $70,494.44 |
0300-020-02-1091 | Bergenfield | Bergenfield H.S. | ADA upgrades to Girl's and Boy's toilet rooms | School Facility Project | Rehab of Existing Facility | Completed | $159,469.55 | $159,469.55 | $63,787.82 | $95,681.73 |
0300-020-04-00LE | Bergenfield | Bergenfield H.S. | roof replacement | School Facility Project | Rehab of Existing Facility | Completed | $381,500.00 | $377,000.00 | $150,800.00 | $230,700.00 |
0300-040-04-00LF | Bergenfield | Franklin E.S. | Roof replacement | School Facility Project | Rehab of Existing Facility | Completed | $68,554.08 | $68,554.08 | $27,421.63 | $41,132.45 |
0300-050-00-0220 | Bergenfield | Hoover E.S. | Addition and renovations to school | Retro | Addition and Rehab of Existing Facility | Completed | $454,020.00 | $454,020.00 | $181,608.00 | $272,412.00 |
0300-050-02-0902 | Bergenfield | Hoover E.S. | Electrical upgrades including Technology wiring and associated split-system air conditioning unit | School Facility Project | Rehab of Existing Facility | Completed | $81,696.38 | $81,696.38 | $32,678.55 | $49,017.83 |
0300-050-04-00LG | Bergenfield | Hoover E.S. | Roof replacement | School Facility Project | Rehab of Existing Facility | Completed | $201,000.00 | $195,000.00 | $78,000.00 | $123,000.00 |
0300-060-02-0903 | Bergenfield | Jefferson E.S. | Electrical upgrades including technology and associated split-system air conditioning unit | School Facility Project | Rehab of Existing Facility | Completed | $101,027.83 | $101,027.83 | $40,411.13 | $60,616.70 |
0300-075-02-0904 | Bergenfield | Roy W. Brown M.S. | electrical upgrades including Technology wiring and associated split-sytem air conditioning unit | School Facility Project | Rehab of Existing Facility | Completed | $500,000.00 | $500,000.00 | $200,000.00 | $300,000.00 |
0300-075-04-00LH | Bergenfield | Roy W. Brown M.S. | Roof Replacement | School Facility Project | Rehab of Existing Facility | Completed | $62,250.00 | $58,500.00 | $23,400.00 | $38,850.00 |
0300-080-04-00LI | Bergenfield | Washington E.S. | Roof Replacement | School Facility Project | Rehab of Existing Facility | Completed | $102,250.00 | $97,500.00 | $39,000.00 | $63,250.00 |
0310-005-01-0236 | Berkeley Heights | Governor Livingston H.S. | Rehab - toilet rooms, repair roof, electrical system, upgrade science labs | Waiver | Addition and Rehab of Existing Facility | Completed | $1,489,732.16 | $1,489,732.16 | $595,892.86 | $893,839.30 |
0310-020-01-0233 | Berkeley Heights | Thomas P. Hughes E.S. | Rehab - toilet rooms/exhaust systems, ventilation system, electrical equipment, technology panels | Waiver | Addition and Rehab of Existing Facility | Completed | $328,091.95 | $325,255.65 | $130,102.26 | $197,989.69 |
0310-030-00-0355 | Berkeley Heights | Columbia M.S. | Rehab - Alt. to music area, install ramp/electrical equipment/intercom systems and replace doors/ent | Waiver | Addition and Rehab of Existing Facility | Completed | $5,365,025.00 | $3,786,892.00 | $1,514,756.80 | $3,850,268.20 |
0310-030-03-0838 | Berkeley Heights | Columbia M.S. | Removal mof existing wheelchair lifts and replacement. | School Facility Project | Addition and Rehab of Existing Facility | Executed | $63,941.00 | $63,941.00 | $25,576.00 | $38,365.00 |
0310-030-03-0938 | Berkeley Heights | Columbia M.S. | Removal and replacement of existing boilers. | School Facility Project | Rehab of Existing Facility | Completed | $625,301.16 | $625,301.16 | $250,120.46 | $375,180.70 |
0310-035-00-0356 | Berkeley Heights | Early Childhood Cnt.-Hamil Terr E.S | Rehab - elevator/restrooms, toilets, electrical equipment, replace exterior entrances, tech panels | Waiver | Addition and Rehab of Existing Facility | Completed | $715,993.47 | $715,993.47 | $286,397.39 | $429,596.08 |
0310-040-01-0234 | Berkeley Heights | Mountain Park E.S. | Rehab - toilet rooms/exhaust systems, electrical equipment, technology panels | Waiver | Addition and Rehab of Existing Facility | Completed | $339,427.68 | $339,427.68 | $135,771.07 | $203,656.61 |
0310-040-03-1323 | Berkeley Heights | Mountain Park E.S. | Remove and replace existing roof system and soffits. | School Facility Project | Rehab of Existing Facility | Completed | $661,127.00 | $661,127.00 | $264,451.00 | $396,676.00 |
0310-050-01-0235 | Berkeley Heights | William Woodruff E.S. | Rehab - Toilet rooms/exhaust systems, electrical equipment, technology panels | Waiver | Addition and Rehab of Existing Facility | Completed | $327,914.84 | $327,702.28 | $131,080.91 | $196,833.93 |
0320-020-02-0414 | Berkeley Township | Bayville E.S. | Addition of 5 classrooms, media center, 7 small group instruction spaces, 1 science lab, 2 vocal music/instrumental music romms, 2 speech rooms, 1 computer lab, 1 art room and a gym | School Facility Project | Addition and Rehab of Existing Facility | Executed | $5,491,372.73 | $4,294,522.00 | $1,717,809.00 | $3,773,563.73 |
0320-030-02-0415 | Berkeley Township | Clara B. Worth E.S. | Addition of 12 classrooms, 2 small group instruction spaces, science lab, media center, special education classroom and 2 vocal/instrumental music rooms. Various renovations. | School Facility Project | Addition and Rehab of Existing Facility | Completed | $5,626,000.00 | $3,826,815.00 | $1,530,726.00 | $4,095,274.00 |
0320-040-02-0416 | Berkeley Township | H & M Potter E.S. | Addition of new pre-K, K and general classrooms, science lab, vocal music, instrumental music, small group instruction, gymnasium and small kitchen. Various renovations. | School Facility Project | Addition and Rehab of Existing Facility | Completed | $5,296,300.00 | $3,784,599.00 | $1,513,840.00 | $3,782,460.00 |
0320-N01-02-0417 | Berkeley Township | New Elementary School | New Elementary School facility | School Facility Project | New Construction | Executed | $16,661,101.48 | $11,871,312.00 | $4,748,525.00 | $11,912,576.46 |
0330-020-02-0993 | Berlin Borough | Berlin Community E.S. | New addition including classrooms, offices, expansion of multipurpose room, etc. Rehab for computer lab and SGI pulus toilet renovations and site work. | School Facility Project | Addition and Rehab of Existing Facility | Executed | $7,592,995.00 | $6,596,349.00 | $2,681,050.00 | $4,911,945.00 |
0350-050-01-0527 | Bernards Township | Ridge H.S. | replace existing roof with a new roof - project includes a double tear off and a full replacement | School Facility Project | Rehab of Existing Facility | Completed | $1,120,262.00 | $1,120,262.00 | $448,104.80 | $672,157.20 |
0350-055-04-00CL | Bernards Township | William Annin M.S. | Replace boilers | School Facility Project | Rehab of Existing Facility | Executed | $397,000.00 | $397,000.00 | $158,800.00 | $238,200.00 |
0350-060-03-0947 | Bernards Township | Oak Street E.S. | Roof replacement and Exterior Brick re-pointing. | School Facility Project | Rehab of Existing Facility | Completed | $632,790.00 | $632,790.00 | $253,116.00 | $379,674.00 |
0350-060-05-0AQU | Bernards Township | Oak Street E.S. | Replace windows | School Facility Project | Rehab of Existing Facility | Executed | $174,930.00 | $174,930.00 | $69,972.00 | $104,958.00 |
0350-070-02-1005 | Bernards Township | Cedar Hill E.S. | replacement of heating pipes | School Facility Project | Rehab of Existing Facility | Completed | $191,248.47 | $191,248.47 | $76,499.38 | $114,749.09 |
0350-070-05-0AQV | Bernards Township | Cedar Hill E.S. | Replace windows | School Facility Project | Rehab of Existing Facility | Executed | $167,195.00 | $167,195.00 | $66,878.00 | $100,317.00 |
0350-080-02-0816 | Bernards Township | Liberty Corner E.S. | Roof Replacement | School Facility Project | Rehab of Existing Facility | Completed | $292,720.00 | $292,720.00 | $117,088.00 | $175,632.00 |
0350-080-04-00CK | Bernards Township | Liberty Corner E.S. | Replace hot water boilers. | School Facility Project | Rehab of Existing Facility | Executed | $364,044.60 | $364,044.60 | $145,618.00 | $218,426.60 |
0350-080-05-0AQW | Bernards Township | Liberty Corner E.S. | Replace windows | School Facility Project | Rehab of Existing Facility | Executed | $195,064.00 | $195,064.00 | $78,026.00 | $117,038.00 |
0350-080-05-0CAO | Bernards Township | Liberty Corner E.S. | Replace windows and new classroom ceiling fans. | School Facility Project | Rehab of Existing Facility | Executed | $409,940.00 | $364,847.00 | $145,939.00 | $264,001.00 |
0370-020-00-0242 | Bethlehem Township | Ethel Hoppock Elementary | Renovation of existing interior spaces and exisiting systems | Waiver | Addition and Rehab of Existing Facility | Completed | $2,328,474.00 | $2,328,474.00 | $931,389.60 | $1,397,084.40 |
0370-020-05-0CAZ | Bethlehem Township | Ethel Hoppock Elementary | Roof Replacement, Ramp Repair & Regrading. | School Facility Project | Rehab of Existing Facility | Executed | $1,114,051.00 | $1,114,051.00 | $445,620.00 | $668,431.00 |
0370-070-00-0243 | Bethlehem Township | Thomas B. Conley E.S. | Renovation of existing spaces and existing systems | |