|| <<Schools Home
  
    
   
Page: 1 2 
Abbott Managed Projects
0100-010-00-0504
Asbury Park
Asbury Park H.S.
Repairs include window replacements, door hardware upgrades, main wing roof replacement, repairs to masonry façade, and fire alarm system upgrades.
Health & Safety
Rehab of Existing Facility
Completed
0100-020-00-0505
Asbury Park
Bangs Avenue E.S.
Rehab of the facility-skylight repairs, repair & repainting of stucco façade. Replace lintel, roof at various wings, new exterior unit ventilator grills, sprinklers in boiler room, upgrades to fire alarm sys.
Health & Safety
Rehab of Existing Facility
Completed
0100-040-00-0391
Asbury Park
Bradley Primary
Addition of classrooms, gym, art and music rooms; various classroom conversions.
School Facility Project
Addition and Rehab of Existing Facility
Completed
0100-040-00-0433
Asbury Park
Bradley Primary
New heating and air conditioning system and a new sprinkler system.
Health & Safety
Rehab of Existing Facility
Completed
0100-070-00-0482
Asbury Park
Asbury Middle School
Replacement of Window, Door hardware, Repair of steps, skylights, structural cracking, spalling and deteriorating walls on building exterior, fire alarm system upgrade, sprinkler heads replacement, unit ventilator grills replacement
Health & Safety
Rehab of Existing Facility
Completed
0100-070-01-0633
Asbury Park
Asbury Middle School
New Addition - 29,875 s.f. includes 45 classrms, 6 SGIs, new cafetorium, music/vocal rm, community rm & media ctr. Renov & upgrades to existing 87,480 s.f. bldg containing 760 students.
School Facility Project
Addition and Rehab of Existing Facility
Construction Bid
0100-100-01-0631
Asbury Park
T. Marshall Primary
Addition - 13,278 s.f., 3-story with 50 classrms for 814 students with new gym/office & locker rooms, stage area, music rm, resource center, conference rms, new kitchen/cafeteria and Renovations to the existing 75,000-s.f. bldg.
School Facility Project
Addition and Rehab of Existing Facility
Completed
0540-020-00-0430
Bridgeton
Bridgeton Senior H.S.
replacement of the curtain wall and doors
Health & Safety
Rehab of Existing Facility
Completed
0540-020-02-0236
Bridgeton
Bridgeton Senior H.S.
Media center & elevator additions
School Facility Project
Addition and Rehab of Existing Facility
Construction
0540-020-04-00ES
Bridgeton
Bridgeton Senior H.S.
HVAC and ceiling replacement.
School Facility Project
Rehab of Existing Facility
Completed
0540-030-00-0681
Bridgeton
Broad Street Elementary School
Remove/install roof, stone coping, new ladders, mechl/elect modifications, skylights removal. Replace curtainwall, masonry repairs, doors and windows.
Health & Safety
Rehab of Existing Facility
Completed
0540-050-00-0575
Bridgeton
Buckshutem Road E.S. - G. Foster ECC
Roof removal/installation, mechanical/electrical modifications
Health & Safety
Rehab of Existing Facility
Completed
0540-050-01-0524
Bridgeton
Buckshutem Road E.S. - G. Foster ECC
61,000 SF New Bldg Addition provides 24 new classrooms for 360 Pre-K & Kindergarten students and includes a gym, cafetorium w/stage, kitchen, SGI and Admin Offices.
School Facility Project
Addition and Rehab of Existing Facility
Completed
0540-055-00-0478
Bridgeton
Cherry Street E.S.
the replacement of windows and repair/replacement of doors.
Health & Safety
Rehab of Existing Facility
Completed
0540-060-00-0498
Bridgeton
Indian Avenue E.S.
the replacement of windows and repair/replacement of doors.
Health & Safety
Rehab of Existing Facility
Completed
0540-100-00-0653
Bridgeton
Quarter Mile Lane E.S.
replacing the roof
Health & Safety
Rehab of Existing Facility
Completed
0540-130-00-0574
Bridgeton
West Avenue E.S.
roof replacement
Health & Safety
Rehab of Existing Facility
Completed
0600-020-00-0427
Burlington City
Burlington City H.S.
Remove existing fire alarm system and control panel, provide new fire alarm system and control panel, furnish and install new exterior egress lighting.
Health & Safety
Rehab of Existing Facility
Completed
0600-020-01-0957
Burlington City
Burlington City H.S.
Pre-development request for A/E to do Ed Specs/Schematic design. Renovations & additons. Prior SOW for H&S.
School Facility Project
Addition and Rehab of Existing Facility
Construction
0600-040-00-0615
Burlington City
Captain James Lawrence E.S.
Upgrades to emergency and exit lighting, PA and sprinkler system, fire resistant upgrades to doors, frames and stair enclosures, heating, electric, and ventilation systems, new exhaust fans and asbestos abatement.
Health & Safety
Rehab of Existing Facility
Completed
0600-050-01-1023
Burlington City
Elias Boudinot E.S.
Upgrades to emergency and exit lighting, PA system, fire resistant upgrades to doors, frames and electric panels, new exhaust fans, fire alarm and asbestos abatement.
Health & Safety
Rehab of Existing Facility
Completed
0600-080-00-0652
Burlington City
Samuel Smith E.S.
Upgrades to emergency and exit lighting, PA system, fire resistant upgrades to doors, frames and electric panels, new exhaust fans, fire alarm and asbestos abatement.
Health & Safety
Rehab of Existing Facility
Completed
0600-080-01-0488
Burlington City
Samuel Smith E.S.
12 pre-K classroom addition, 15K SF
School Facility Project
Addition To Existing Facility
Completed
0600-085-01-0958
Burlington City
Wilbur Watts Intermediate School
Pre-development request for A/E to do Ed Specs/Schematic design for a replacement middle school to Wilbur Watts Intermediate School.
School Facility Project
New Construction
Construction
0600-085-01-1160
Burlington City
Wilbur Watts Intermediate School
New unit ventilators and R.T.U’s, new general & classroom lighting and power, new public address and security systems, masonry repairs and cleaning; new int. and ext. doors and hardware; new windows, boiler repairs and other.
Health & Safety
Rehab of Existing Facility
Completed
0680-010-01-1278
Camden City
Jerrothia Riggs Adult Education Cnt
Electrical lighting and fire alarm system upgrades, and general construction, carpentry, masonry repairs and roofing upgrades.
Health & Safety
Rehab of Existing Facility
Completed
0680-010-03-0214
Camden City
Jerrothia Riggs Adult Education Cnt
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-025-01-0929
Camden City
Early Childhood Development Center #25
Replacement construction in lieu of renovation and addition of the ECDC on existing site.
School Facility Project
New Construction
Construction
0680-025-01-1314
Camden City
Early Childhood Development Center #25
Repairs/replacements include roof, electrical system, window replacements, asbestos abatement, fire alarm upgrades, structural repairs and boiler replacement.
Health & Safety
Rehab of Existing Facility
Completed
0680-025-03-0207
Camden City
Early Childhood Development Center #25
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-027-01-1279
Camden City
South Camden Alternative School
Repair/replace roof, repoint brick, skylight, stair, electrical system, fire alarm detection/escapes/doors, concrete sidewalks, copper water /cast iron pipe, rainwater conductors/scuppers, ceilings, floor drains
Health & Safety
Rehab of Existing Facility
Completed
0680-027-03-0225
Camden City
South Camden Alternative School
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-029-01-1312
Camden City
Brimm Medical Arts H.S.
Repair/replace, roof, exterior masonry, trim, interior and exterior lighting fixture, exterior doors, fire alarm/detection system
Health & Safety
Rehab of Existing Facility
Completed
0680-029-03-0217
Camden City
Brimm Medical Arts H.S.
Install automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-030-01-1015
Camden City
Camden H.S.
evaluation of design exterior masonry/re-pointing as conditions warrant, roof replacement, fire alarm systems/design of fire alarm upgrades, electrical system, lighting and control panel upgrades.
Health & Safety
Rehab of Existing Facility
Completed
0680-030-03-0199
Camden City
Camden H.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-040-00-0429
Camden City
Woodrow Wilson H.S.
Asbestos Abatement, door/hardware replacement, electrical upgrades, electrical lighting, exit signs, exterior wall repair, fire alarm system, interior finishes, window replacement and emergency generator.
Health & Safety
Rehab of Existing Facility
Completed
0680-040-03-0229
Camden City
Woodrow Wilson H.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-045-01-1032
Camden City
East Camden M.S.
install new windows, roof, exterior doors, repair existing fire alarm, replace exit & egress lighting, repair/replace masonry, windows and install new windows.
Health & Safety
Rehab of Existing Facility
Completed
0680-045-03-0206
Camden City
East Camden M.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-070-01-0933
Camden City
Pyne Poynt Family M.S.
Addition and renovation to existing facility.
School Facility Project
Addition and Rehab of Existing Facility
Construction
0680-070-01-1010
Camden City
Pyne Poynt Family M.S.
Investigation and evaluation for upgrading the building, exterior masonry wall, roof replacement, investigation and design of safety issues, building electrical system/design of lighting control panel upgrades.
Health & Safety
Rehab of Existing Facility
Completed
0680-070-03-0222
Camden City
Pyne Poynt Family M.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-080-01-1319
Camden City
Veterans Memorial M.S.
door/hardware replacement, electrical upgrades, electrical lighting, exit signs, exterior wall repair, fire alarm system, interior finishes, window replacement, emergency generator, fire suppression/standpipe, roofing
Health & Safety
Rehab of Existing Facility
Completed
0680-080-03-0249
Camden City
Veterans Memorial M.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-100-01-1322
Camden City
Bonsall E.S.
Electrical lighting and fire alarm system upgrades, and general construction, carpentry, masonry repairs and roofing upgrades.
Health & Safety
Rehab of Existing Facility
Completed
0680-100-03-0196
Camden City
Bonsall E.S.
Install Automatic ROL Flushing System on Bonsall E.S. Water Lines
School Facility Project
Rehab of Existing Facility
Completed
0680-110-01-1296
Camden City
Broadway E.S.
Repair/replace roof, repoint brick, skylight, stair, electrical system, fire alarm detection/escapes/doors, concrete sidewalks, copper water/cast iron pipe, rainwater conductors/ scuppers, ceilings, floor drains
Health & Safety
Rehab of Existing Facility
Completed
0680-110-03-0250
Camden City
Broadway E.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-140-01-1280
Camden City
Octavius V. Catto Community School
Repair/replace roof, rainwater conductors, exterior CMU walls, cornice, terra cotta, repoint exterior brick, stone windowsills, plaster ceilings, sidewalk, fire alarm /detection system, existing standpipe, lighting, electrical system.
Health & Safety
Rehab of Existing Facility
Completed
0680-140-03-0201
Camden City
Octavius V. Catto Community School
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-165-01-1011
Camden City
Cooper's Poynt E.S.
Electrical lighting and fire system upgrade, and general construction, carpentry, masonry repairs, doors finishes and roofing upgrades.
Health & Safety
Rehab of Existing Facility
Completed
0680-165-03-0202
Camden City
Cooper's Poynt E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-170-01-1016
Camden City
Cramer E.S.
Repair/replace roof, rainwater conductors, exterior CMU walls, cornice, terra cotta, repoint exterior brick, stone windowsills, plaster ceilings, sidewalk, fire alarm /detection system, existing standpipe, lighting, electrical system.
Health & Safety
Rehab of Existing Facility
Completed
0680-170-03-0251
Camden City
Cramer E.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-175-01-0745
Camden City
Riletta T. Cream E.S.
TCU site approval (2)
Other
Temporary Classroom Unit
Completed
0680-175-01-1310
Camden City
Riletta T. Cream E.S.
Electrical lighting and fire system upgrade and general construction, carpentry, masonry repairs, doors and finishes.
Health & Safety
Rehab of Existing Facility
Completed
0680-175-03-0223
Camden City
Riletta T. Cream E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-180-01-1008
Camden City
Davis E.S.
Asbestos Abatement, door/hardware replacement, electrical upgrades, electrical lighting, exit signs, exterior wall repair, fire alarm system, interior finishes, window replacement and emergency generator
Health & Safety
Rehab of Existing Facility
Completed
0680-180-03-0204
Camden City
Davis E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-190-01-0927
Camden City
Dudley E.S.
Replacement of existing Dudley ES on new site
School Facility Project
New Construction
Construction
0680-190-01-1293
Camden City
Dudley E.S.
Repair/replace roof, rainwater conductors, exterior CMU walls, cornice, terra cotta, repoint exterior brick, stone windowsills, plaster ceilings, sidewalk, fire alarm /detection system, existing standpipe, lighting, electrical system.
Health & Safety
Rehab of Existing Facility
Completed
0680-190-03-0205
Camden City
Dudley E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-205-01-1318
Camden City
Forest Hill E.S.
Repairs/replacements include roof, electrical system, window replacements, asbestos abatement, fire alarm upgrades, structural repairs and boiler replacement
Health & Safety
Rehab of Existing Facility
Completed
0680-205-03-0210
Camden City
Forest Hill E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-210-01-1358
Camden City
Hatch M.S.
Remove existing roof, install new multi-ply roof & equipment. Repair existing fire alarm detection system, supplemental lighting fixtures & switching, relamp & reballast existing fixtures, masonry/stone. Remove/replace glass block window.
Health & Safety
Rehab of Existing Facility
Completed
0680-210-03-0211
Camden City
Hatch M.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-215-03-0215
Camden City
Lanning Square E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-230-01-1009
Camden City
McGraw E.S.
Repair/replace roof, rainwater conductors, exterior CMU walls, cornice, terra cotta, repoint exterior brick, stone windowsills, plaster ceilings, sidewalk, fire alarm /detection system, existing standpipe, lighting, electrical system.
Health & Safety
Rehab of Existing Facility
Completed
0680-230-03-0216
Camden City
McGraw E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-240-01-1311
Camden City
Creative and Performing Arts H.S.
Electrical lighting and fire alarm system upgrades, and general construction, carpentry, masonry repairs and roofing upgrades.
Health & Safety
Rehab of Existing Facility
Completed
0680-240-03-0203
Camden City
Creative and Performing Arts H.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-245-01-0930
Camden City
Morgan Village M.S.
Addition and renovations to Morgan Village. Land acquisition may be required for replacement of parking area. Addition footprint on existing parking lot.
School Facility Project
Addition and Rehab of Existing Facility
Design
0680-245-01-1012
Camden City
Morgan Village M.S.
install new windows, roof, exterior doors, repair existing fire alarm, replace exit & egress lighting, repair/replace masonry, windows and install new windows.
Health & Safety
Rehab of Existing Facility
Completed
0680-245-03-0219
Camden City
Morgan Village M.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-250-01-1034
Camden City
Raphael Cordero Molina E.S.
Repairs/replacements include roof, electrical system, window replacements, asbestos abatement, fire alarm upgrades, structural repairs and boiler replacement
Health & Safety
Rehab of Existing Facility
Completed
0680-250-03-0248
Camden City
Raphael Cordero Molina E.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-260-01-1292
Camden City
Parkside E.S.
Repairs/replacements include roof, electrical system, window replacements, asbestos abatement, fire alarm upgrades, structural repairs and boiler replacement
Health & Safety
Rehab of Existing Facility
Completed
0680-260-03-0220
Camden City
Parkside E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-270-01-1317
Camden City
Powell E.S.
Electrical lighting and fire system upgrade, and general construction, carpentry, masonry repairs, doors finishes and roofing upgrades.
Health & Safety
Rehab of Existing Facility
Completed
0680-270-03-0221
Camden City
Powell E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-300-01-1316
Camden City
Sharp E.S.
Repair/replace roof, rainwater conductors, exterior CMU walls, cornice, terra cotta, repoint exterior brick, stone windowsills, plaster ceilings, sidewalk, fire alarm /detection system, existing standpipe, lighting, electrical system.
Health & Safety
Rehab of Existing Facility
Completed
0680-300-03-0224
Camden City
Sharp E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-305-01-1295
Camden City
Challenge Square Academy
Replacement of unsafe playground equipment and subsurface material to bring in compliance with CPSC Playground safety guidelines
Health & Safety
Rehab of Existing Facility
Completed
0680-305-03-0233
Camden City
Challenge Square Academy
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-310-01-1007
Camden City
Sumner E.S.
Repair/replace roof, repoint brick, skylight, stair, electrical system, fire alarm detection/escapes/doors, concrete sidewalks, copper water /cast iron pipe, rainwater conductors/scuppers, ceilings, floor drains
Health & Safety
Rehab of Existing Facility
Completed
0680-310-03-0252
Camden City
Sumner E.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-320-01-0744
Camden City
U.S. Wiggins E.S.
TCU site approval (1)
Other
Temporary Classroom Unit
Completed
0680-320-01-1033
Camden City
U.S. Wiggins E.S.
Repair/replace roof, repoint brick, skylight, stair, electrical system, fire alarm detection/escapes/doors, concrete sidewalks, copper water /cast iron pipe, rainwater conductors/scuppers, ceilings, floor drains
Health & Safety
Rehab of Existing Facility
Completed
0680-320-03-0228
Camden City
U.S. Wiggins E.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-330-01-1294
Camden City
Washington E.S.
Electrical lighting and fire system upgrade and general construction, carpentry, masonry repairs, doors and finishes.
Health & Safety
Rehab of Existing Facility
Completed
0680-330-03-0226
Camden City
Washington E.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-340-01-1315
Camden City
Whittier E.S.
Repair/replace existing masonry and stone. Remove/replace glass block window, roofing. Electrical lighting and fire alarm system upgraded, and general construction, carpentry, masonry repairs, doors and finishes.
Health & Safety
Rehab of Existing Facility
Completed
0680-340-03-0227
Camden City
Whittier E.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-350-01-0938
Camden City
H. B. Wilson E.S.
Replacement of existing HB Wilson ES on new site.
School Facility Project
New Construction
Construction
0680-350-01-1006
Camden City
H. B. Wilson E.S.
Electrical lighting and fire alarm system upgrades, general construction, carpentry, masonry repairs and roofing upgrades.
Health & Safety
Rehab of Existing Facility
Completed
0680-350-03-0212
Camden City
H. B. Wilson E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-360-01-1320
Camden City
Yorkship E.S.
door/hardware replacement, electrical upgrades, electrical lighting, exit signs, exterior wall repair, fire alarm system, interior finishes, window replacement, emergency generator, fire suppression/standpipe, roofing
Health & Safety
Rehab of Existing Facility
Completed
0680-360-03-0230
Camden City
Yorkship E.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-909-01-1313
Camden City
Environmental Center
Repair/replace, roof, exterior masonry, trim, interior and exterior lighting fixture, exterior doors, fire alarm/detection system.
Health & Safety
Rehab of Existing Facility
Completed
0680-917-01-1031
Camden City
Fetters Alternative Sch
Repair/replace roof, repoint brick, skylight, stair, electrical system, fire alarm detection/escapes/doors, concrete sidewalks, copper water /cast iron pipe, rainwater conductors/scuppers, ceilings, floor drains
Health & Safety
Rehab of Existing Facility
Completed
0680-X01-03-0209
Camden City
Fetters Alternative HS
Install automatic ROL Flushing Systems on water lines.
School Facility Project
Rehab of Existing Facility
Completed
0680-X04-03-0200
Camden City
Camden Vocational School
Install automatic ROL Flushing Systems on water lines.
School Facility Project
Rehab of Existing Facility
Completed
1210-010-00-0661
East Orange
B.L. Edmonson Ctr. Adult H.S.
Exterior masonry repair, window replacement, door & hardware upgrade, electric light and wiring upgrades, fire alarm work and emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1210-030-00-0667
East Orange
East Orange Campus 9 (aka Clifford J. Scott HS)
Asbestos abatement disposal; life safety improvements and building envelope restoration.
Health & Safety
Rehab of Existing Facility
Completed
1210-030-01-0722
East Orange
East Orange Campus 9 (aka Clifford J. Scott HS)
Extensive rehabilitation of building
School Facility Project
Rehab of Existing Facility
Completed
1210-040-01-1181
East Orange
East Orange H.S.
Life safety and building envelope restoration.
Health & Safety
Rehab of Existing Facility
Completed
1210-040-02-0295
East Orange
East Orange H.S.
Construction of an auditorium for the East Orange Campus High School
School Facility Project
Addition To Existing Facility
Completed
1210-060-01-1182
East Orange
G.W.Carver Institute
Window replacement, door & hardware upgrade, roof repairs, electric light and wiring upgrades, emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1210-080-01-1184
East Orange
Langston Hughes School
Window replacement, door & hardware upgrade, roof repairs, electric light and wiring upgrades, emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1210-090-00-0577
East Orange
Whitney E. Houston Academy E.S.
Life safety improvements and building envelope restoration.
Health & Safety
Rehab of Existing Facility
Completed
1210-093-01-1183
East Orange
Fourth Avenue E.S.
Window replacement, door & hardware upgrade, roof repairs, electric light and wiring upgrades, emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1210-100-00-0662
East Orange
Mildred B. Garvin MicroSociety Sch
Life safety improvements and building envelope restoration.
Health & Safety
Rehab of Existing Facility
Completed
1210-100-02-0613
East Orange
Mildred B. Garvin MicroSociety Sch
Two additions equaling 50,000 sf and rehabilition of existing facility.
School Facility Project
Addition and Rehab of Existing Facility
Construction
1210-110-01-1180
East Orange
Dionne Warwick Institute
Window replacement, door & hardware upgrade, electric light and wiring upgrades and emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1210-120-01-1179
East Orange
Ecole T.Louverture E.S.
Window replacement, door & hardware upgrade, roof repairs, electric light and wiring upgrades, emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1210-130-01-1185
East Orange
Gordon Parks Academy E.S.
Electrical light and wiring upgrades and roofing repair.
Health & Safety
Rehab of Existing Facility
Completed
1210-140-01-1176
East Orange
Washington Academy E.S.
Window replacement, door & hardware upgrade, roof repairs, electric light and wiring upgrades, emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1210-150-01-1178
East Orange
Cicely Tyson School
Window replacement, door & hardware upgrade, electric light and wiring upgrades and emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1210-170-01-1177
East Orange
J. Garfield Jackson, Sr. Academy ES
Exterior masonry repair, window replacement, door & hardware upgrade, electric light and wiring upgrades, fire alarm work and emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1210-906-00-0668
East Orange
Hart Middle School
Life safety and building envelope restoration.
Health & Safety
Rehab of Existing Facility
Completed
1210-E01-01-0873
East Orange
Wahlstrom Early Childhood Center
Roof replacement, boiler installation, Handicap modifications for ADA, cafetorium plumbing, Insulation of floors and piping, exterior fascia repair
School Facility Project
Rehab of Existing Facility
Completed
1210-x05-01-0808
East Orange
New ES #5 (-x05)
Site for new 90,000-s.f. ES to house pre-k thru 8th grade students.
School Facility Project
New Construction
Construction
1210-x07-01-0792
East Orange
New - Langston Hughes Replacement (-x07)
The 92,146-s.f. replacement school will be built next to the existing facility & house 516 pre-k thru 5th grade students.
School Facility Project
New Construction
Completed
1320-025-00-0611
Elizabeth
Elizabeth H.S.
New complete fire alarm. Replace exterior doors and hardware. Roofing repairs.
School Facility Project
Rehab of Existing Facility
Completed
1320-025-03-0833
Elizabeth
Elizabeth H.S.
Remodel of 17 classrooms/spaces in the Five House to create additional classroom space
School Facility Project
Rehab of Existing Facility
Completed
1320-030-00-0639
Elizabeth
Number 76, Reilly M.S.
Electrical modifications, general construction and roofing work, window replacement.
Health & Safety
Rehab of Existing Facility
Completed
1320-035-00-0515
Elizabeth
Number 75, Battin M.S.
New Roof, masonry, gym pads, radiator covers and exit signs.
Health & Safety
Rehab of Existing Facility
Completed
1320-050-00-0606
Elizabeth
Number 70, Cleveland M.S.
New roof, masonry, doors, stairs and auditorium lighting.
Health & Safety
Rehab of Existing Facility
Completed
1320-060-00-0512
Elizabeth
Number 72, Hamilton M.S.
New roof, masonry, exit signs and windows
Health & Safety
Rehab of Existing Facility
Completed
1320-090-00-0463
Elizabeth
Number 1, George Washington E.S.
New roof, masonry, windows, exit signs and hallway walls
Health & Safety
Rehab of Existing Facility
Completed
1320-100-00-0607
Elizabeth
Number 2, Winfield Scott E.S.
New roof, masonry, windows, exit signs, handrails, toilet exhaust fans
Health & Safety
Rehab of Existing Facility
Completed
1320-110-00-0604
Elizabeth
Number 3, Peterstown E.S.
Roof repairs, door hardware, fire alarm.
School Facility Project
Rehab of Existing Facility
Completed
1320-120-00-0609
Elizabeth
Number 6, Marquis deLafayette E.S.
Electrical modifications, general construction and roofing work, window replacement.
Health & Safety
Rehab of Existing Facility
Completed
1320-160-00-0464
Elizabeth
Number 13, Benjamin Franklin E.S.
Emergency lighting, doors and hardware, gymnasium wall pads, exterior brick restoration, lead paint removal.
Health & Safety
Rehab of Existing Facility
Completed
1320-170-00-0545
Elizabeth
Number 14, Abraham Lincoln E.S.
Roofing, masonry work, general construction work, mechanical and electrical work.
Health & Safety
Rehab of Existing Facility
Completed
1320-180-00-0603
Elizabeth
Number 15, Christopher Columbus ES
New roof, masonry, doors and hardware, rubber stair tread, gym pads, exit signs, windows, radiator covers
Health & Safety
Rehab of Existing Facility
Completed
1320-190-00-0608
Elizabeth
Number 16, Madison-Monroe E.S.
New roof, masonry, doors and hardware, window, boilers, piping and unit ventilators.
Health & Safety
Rehab of Existing Facility
Completed
1320-200-00-0640
Elizabeth
Number 17, Theodore Roosevelt E.S.
New roof, masonry, transoms, gym wall pads and radiator covers.
Health & Safety
Rehab of Existing Facility
Completed
1320-220-00-0677
Elizabeth
Number 19, Woodrow Wilson E.S.
New doors and hardware, exhaust fans, unit ventilators, control wiring, exit and emergency lights.
Health & Safety
Rehab of Existing Facility
Completed
1320-230-00-0610
Elizabeth
Number 20, John Marshall E.S.
Door repairs, light installation, generator repairs.
School Facility Project
Rehab of Existing Facility
Completed
1320-240-00-0678
Elizabeth
Number 21, Victor Mravlag E.S.
New roof, door hardware, masonry and hand rails.
Health & Safety
Rehab of Existing Facility
Completed
1320-240-03-0339
Elizabeth
Number 21, Victor Mravlag E.S.
Rehab and addition to accommodate unhoused students and program needs
School Facility Project
Addition and Rehab of Existing Facility
Construction
1320-250-00-0605
Elizabeth
Number 22, William F. Halloran E.S.
New roof, door hardware, masonry improvements and hand rails.
Health & Safety
Rehab of Existing Facility
Completed
1320-260-00-0513
Elizabeth
Number 23, N.M. Butler E.S.
New masonry, doors and hardware and windows
Health & Safety
Rehab of Existing Facility
Completed
1320-901-00-0461
Elizabeth
Edison House School
Roofing, masonry, general construction, mechanical/electrical work; and window replacement.
Health & Safety
Rehab of Existing Facility
Completed
1320-902-00-0462
Elizabeth
Jefferson House
Replace windows, roofing and masonry. Repair Drywall partition, doors & hardware, misc. electrical work.
Health & Safety
Rehab of Existing Facility
Completed
1320-903-00-0629
Elizabeth
No 23 Annex - JP Mitchell Bldg
New door hardware and emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1320-904-00-0628
Elizabeth
Sam Aboff House H.S.
Roofing, masonry, general construction, mechanical/electrical work.
Health & Safety
Rehab of Existing Facility
Completed
1320-999-01-EA17
Elizabeth
Elizabeth Multi-Facility/TCU
TCU AE Services - Temp
Multi-Facility/TCU
Temporary Classroom Unit
Completed
1320-999-01-EA18
Elizabeth
Elizabeth Multi-Facility/TCU
TCU AE Services - Temp
Multi-Facility/TCU
Temporary Classroom Unit
Completed
1320-999-01-EA19
Elizabeth
Elizabeth Multi-Facility/TCU
TCU AE Services - Temp
Multi-Facility/TCU
Temporary Classroom Unit
Completed
1320-999-01-EA20
Elizabeth
Elizabeth Multi-Facility/TCU
TCU AE Services - Temp
Multi-Facility/TCU
Temporary Classroom Unit
Completed
1320-999-01-EA21
Elizabeth
Elizabeth Multi-Facility/TCU
TCU AE Services - Temp
Multi-Facility/TCU
Temporary Classroom Unit
Completed
1320-E02-01-0089
Elizabeth
New pre K-8 #27
Build replacement school PS 17, gsf, 650 Pre-K thru 8th grade students.
School Facility Project
New Construction
Construction
1320-N14-03-0797
Elizabeth
Dr. MLK Jr Center for ECC School # 52
Construction of 55,000 s.f. single-story bldg - includes 20 classrms, courtyard play and reading areas, etc. for approx. 300 Pre-K students.
School Facility Project
New Construction
Completed
1320-NS1-01-0906
Elizabeth
Monsignor Joao S. Antao School No. 31
acquisition of site and construciton of a pre-K-8 facility adjacent to an existing pre-K facility
School Facility Project
New Construction
Completed
1320-x01-01-0087
Elizabeth
Donald Stewart ECC #51 (aka ECC#44)
Construction of a 56,000 s.f. single-story bldg with 20 classrooms, outdoor courtyard play and reading areas, etc. for approx. 300 Pre-K students.
School Facility Project
New Construction
Completed
1320-x04-01-0090
Elizabeth
New pre K-8 #28
Construction of new 119,000 s.f. facility includes classrooms, SGI rms, media ctr (library), art & music rms, science labs, cafetorium, gyms, computer labs, softball field, etc. for 750 Pre-K thru 8th grade students.
School Facility Project
New Construction
Construction
1320-x05-01-0091
Elizabeth
Dr. Albert Einstein School (aka #29)
Construction of new 118,452 s.f. facility will include classrooms, SGI rms, media ctr (library), art & music rms, science labs, cafetorium, gyms, computer labs, playgrounds for approx 750 Pre-K thru 8th grade students.
School Facility Project
New Construction
Completed
1320-x06-01-0866
Elizabeth
Ronald Reagan Academy School # 30 (pre K-8 #30)
Construction of new 119,860 s.f. facility will include classrooms, SGI rms, media ctr (library), art & music rms, science labs, cafetorium, gyms, computer labs, playgrounds for approx 750 Pre-K thru 8th grade students.
School Facility Project
New Construction
Completed
1700-050-00-0453
Garfield
Garfield H.S.
upgrade fire alarm systems, exit and emergency lighting systems, upgrade communication system, restoration of brickwork, and replacement of doors.
Health & Safety
Rehab of Existing Facility
Completed
1700-060-00-0499
Garfield
Columbus E.S.
upgrade fire alarm systems, exit and emergency lighting systems, upgrade communication system, restoration of brickwork, and replacement of doors.
Health & Safety
Rehab of Existing Facility
Completed
1700-070-00-0563
Garfield
Thomas Jefferson M.S.
upgrade fire alarm systems, exit and emergency lighting systems, upgrade communication system, restoration of brickwork, and replacement of doors.
Health & Safety
Rehab of Existing Facility
Completed
1700-080-01-1110
Garfield
Lincoln E.S.
upgrade fire alarm systems, exit and emergency lighting systems, upgrade communication system, restoration of brickwork, and replacement of doors.
Health & Safety
Rehab of Existing Facility
Completed
1700-100-00-0562
Garfield
Roosevelt E.S.
upgrade fire alarm systems, exit and emergency lighting systems, upgrade communication system, restoration of brickwork, and replacement of doors.
Health & Safety
Rehab of Existing Facility
Completed
1700-100-02-0430
Garfield
Roosevelt E.S.
Roof replacement, exterior moisture protection, renovation work consisting of a masonry re-pointing, EIFS work and caulking sealant work. Main entrance door assembly replacement work and interior restoration due to moisture damage.
Health & Safety
Rehab of Existing Facility
Completed
1700-120-01-1070
Garfield
Washington Irving E.S.
upgrade fire alarm systems, exit and emergency lighting systems, upgrade communication system, restoration of brickwork, and replacement of doors.
Health & Safety
Rehab of Existing Facility
Completed
1700-130-00-0497
Garfield
Woodrow Wilson E.S.
upgrade fire alarm systems, exit and emergency lighting systems, upgrade communication system, restoration of brickwork, and replacement of doors.
Health & Safety
Rehab of Existing Facility
Completed
1700-205-03-0315
Garfield
James Madison School #10 (Most Holy Name)
Purchase & rehab a facility leased by school district. Facility to be demolished & replaced with new construction.
School Facility Project
New Construction
Construction Bid
1700-e01-01-0973
Garfield
Garfield Early Childhood Center (aka New ECC)
Site analysis, land acquisition for new ECC. Swing space required (TCU) to be housed at site for MS see project #1700-N01-02-0114
School Facility Project
New Construction
Completed
1700-n01-02-0114
Garfield
New Middle School
Site analysis, land acquisition for new MS.
School Facility Project
New Construction
Construction
1770-050-00-0566
Gloucester City
Gloucester City Jr. Sr. H.S.
Communication system, electric upgrades, emergency generator, lighting, exit lighting, exterior/interior doors/frames, wall repairs, fire alarm, fire suppression, hardware, HVAC, windows, plumbing, security and sitework.
Health & Safety
Rehab of Existing Facility
Completed
1770-050-01-0078
Gloucester City
Gloucester City Jr. Sr. H.S.
Replace existing boiler and related items, replace existing roofing system, roof drains and rain leaders
Health & Safety
Rehab of Existing Facility
Completed
1770-050-03-0187
Gloucester City
Gloucester City Jr. Sr. H.S.
Additions: Gymnasium & Library/Media Center. Complete upgrade of HVAC & electrical sys, & plumbing. Interior renovation to all Science and Elective Classrms.
School Facility Project
Addition and Rehab of Existing Facility
Completed
1770-100-00-0565
Gloucester City
Mary E. Costello E.S.
Communication system, electric upgrades, emergency generator, lighting, exit lighting, exterior/interior doors/frames, wall repairs, fire alarm, fire suppression, hardware, HVAC, windows, plumbing, security and sitework.
Health & Safety
Rehab of Existing Facility
Completed
1770-160-01-0245
Gloucester City
Cold Springs E.S.
New ECC addition consisting of 20 pre-K classrms, multi-purpose rm, storage, support kitchen, etc. Rehab to include toilet rooms.
School Facility Project
Addition To Existing Facility
Completed
1770-160-01-0746
Gloucester City
Cold Springs E.S.
TCU site approval - Removal of TCUs (18). This project is related to: 1770-160-01-0245 (addition to Cold Springs Elementary).
Other
Temporary Classroom Unit
Completed
2060-050-00-0460
Harrison
Harrison H.S.
Renovations to interior and exterior, including the basement, auditorium, gymnasium, and media center.
Health & Safety
Rehab of Existing Facility
Completed
2060-060-00-0480
Harrison
Lincoln No. 3 E.S.
Window replacement, metal stairs, lintel roofing & related masonry.
Health & Safety
Rehab of Existing Facility
Completed
2060-070-00-0459
Harrison
Washington No. 1 M.S.
Renovation primary focus handicap accessible. Remodel bathrooms, door entrances, add ramps and new elevator. The cafeteria and building's façade will be remodeled.
Health & Safety
Rehab of Existing Facility
Completed
2060-x01-01-0832
Harrison
New Harrison High School (-x01)
New 167,000 s.f. includes 30 general classrms, 4 special ed classrms, 2 SGI classrms. gym, music rm, cafeteria, auditorium, media ctr, science labs, computer rm and athletic fields on the site. Student capacity of 850.
School Facility Project
New Construction
Construction
2210-005-00-0691
Hoboken
Hoboken H.S.
Replace roofing system & flashing, skylights, rooftop exhaust fans and exterior doors. Upgrade emergency lighting, fire alarm, fire separation assembly, egress corridor.
Health & Safety
Rehab of Existing Facility
Completed
2210-005-03-0786
Hoboken
Hoboken H.S.
Resurfacing of field and replacement of running track
Health & Safety
Rehab of Existing Facility
Completed
2210-010-00-0626
Hoboken
A.J. Demarest M.S.
Restore masonry surface & cracks, repair parapet, lintels, electrical & fire alarm upgrade. Replace roofing system, flashing, skylights, rooftop exhaust fans, roof top play area.
Health & Safety
Rehab of Existing Facility
Completed
2210-050-00-0624
Hoboken
Joseph F. Brandt No. 2 E.S.
Replace roof sys, flashing, skylights, rooftop exhaust fans, ext windows, restore masonry & cracks, repair parapet, lintels, elect fire alarm, emer sys, upgrade egress corridor, lobby, stairs, stairways, fire supp sys, replace elevator.
Health & Safety
Rehab of Existing Facility
Completed
2210-063-00-0625
Hoboken
Salvatore R. Calabro, No. 4 E.S.
Replace roofing sys & flashing, skylights, rooftop exhaust fans, rooftop play area, curtain wall, exterior doors & frames, fire alarm sys & elect upgrades, exterior masonry repair, power washing and misc. work.
Health & Safety
Rehab of Existing Facility
Completed
2210-063-01-0780
Hoboken
Salvatore R. Calabro, No. 4 E.S.
Convert MS to ES. Renovation work results: 9 classrooms, admin offices, cafetorium, computer rms, gym, media ctr, art/music rm and stage.
School Facility Project
Rehab of Existing Facility
Construction
2210-065-00-0627
Hoboken
Thomas G. Connors
Upgrade/reno egress corridor, lobby, exit stairs, handrails, fire suppr sys, rebld wall, replace elect fire alarm & emerg sys, ext windows, doors, frames, constr exterior fire stair, repair fire escape, parapet, masonry cracks, lintels.
Health & Safety
Rehab of Existing Facility
Completed
2210-065-01-0783
Hoboken
Thomas G. Connors
Renovations to Thomas G. Connors E.S. will result in 18 classrooms, administrative offices, cafetorium, computer room, gymnasium, media center, art/music room, stage, science rooms and renovated playground.
School Facility Project
Rehab of Existing Facility
Design
2210-070-00-0692
Hoboken
Wallace No. 6 E.S.
Replace roof sys, flashing, skylights, rooftop exhst fans, extr windows, doors, frames, parapet,masonry cracks, lintels,elect fire alarm & emerg sys, generator, fire suppr system, stair treads, upgrade egress corridors, lobby & exit stairs.
Health & Safety
Rehab of Existing Facility
Completed
2330-050-00-0684
Irvington Township
Irvington H.S.
Masonry repairs, door replacement, fire detection & intercom upgrades, and lighting protection system. Windows replacement, curtain wall rehabilitation and related masonry work.
Health & Safety
Rehab of Existing Facility
Completed
2330-070-00-0578
Irvington Township
Augusta Street Preschool
Replace roofing sys, rain conductors, doors, misc, flashing, infrared surveying, refurb canopy, chimney repair/replacement, windows. Masonry repairs and electrical upgrades.
Health & Safety
Rehab of Existing Facility
Completed
2330-070-03-0754
Irvington Township
Augusta Street Preschool
Demolition, rehabilitation, addition and correction of deficiencies to existing facility for conversion into a kindergarten facility
School Facility Project
Addition and Rehab of Existing Facility
Construction
2330-080-00-0570
Irvington Township
Berkeley Terrace E.S.
Replace roofing sys, infrared surveying, rain conductors, flashing, doors, chimney & pkgd air-cooled AC units . Masonry repairs, fire & smoke detection & electrical upgrades, replace pkgd air cooled AC units & refurbish canopy & windows.
Health & Safety
Rehab of Existing Facility
Completed
2330-090-00-0655
Irvington Township
Chancellor Avenue E.S.
Masonry repairs, door & window replacement, fire alarm, plumbing and electrical upgrades.
Health & Safety
Rehab of Existing Facility
Completed
2330-100-00-0669
Irvington Township
Florence Avenue E.S.
Replace roofing sys, doors, infrared surveying, rain conductors, misc. flashing, refurb canopy & windows, balances, shoes, chimney repair/replace. Masonry repairs, elect, fire & smoke detect upgrade, repair air cooled AC units.
Health & Safety
Rehab of Existing Facility
Completed
2330-110-00-0670
Irvington Township
Grove Street E.S.
Replace roofing sys, doors, infrared surveying, rain conductors, misc. flashing, refurb canopy & windows, balances, shoes, chimney repair/replace. Masonry repairs, elect, fire & smoke detect upgrade, repair air cooled AC units.
Health & Safety
Rehab of Existing Facility
Completed
2330-120-00-0685
Irvington Township
Madison Avenue E.S.
Masonry repairs, doors replacement, window repair/replacement. Replace existing roofing sys, infrared surveying, existing rain conductors, misc. flashing, refurbish existing canopy, chimney repair/replacement.
Health & Safety
Rehab of Existing Facility
Completed
2330-130-00-0683
Irvington Township
Mt. Vernon Avenue E.S.
Masonry repairs, window replacement, window repairs, electrical upgrades and environmental work.
Health & Safety
Rehab of Existing Facility
Completed
2330-130-02-0432
Irvington Township
Mt. Vernon Avenue E.S.
The new 93,821-sf replacement ES will be a multi-level facility with 31 classrms housing 582 Pre-K thru 5th grade students and include a media center, gymnasium, and auditorium.
School Facility Project
New Construction
Construction
2330-137-01-0720
Irvington Township
University Six School
Purchase and renovation of bldg currently leased
School Facility Project
Rehab of Existing Facility
Construction
2330-137-01-1038
Irvington Township
University Six School
Windows replacement, curtain wall rehabilitation and related masonry work.
Health & Safety
Rehab of Existing Facility
Completed
2330-137-04-000S
Irvington Township
University Six School
Replace existing roof
School Facility Project
Rehab of Existing Facility
Completed
2390-050-00-0696
Jersey City
Henry Snyder H.S.
Replace doors & hardware, interior finishes, exit signs, emergency egress lighting and new ductwork for boiler room. Masonry restoration & repairs, waterproofing, lintel repair or replacement, plaster repairs and asbestos abatement.
Health & Safety
Rehab of Existing Facility
Completed
2390-050-01-0877
Jersey City
Henry Snyder H.S.
Renovation of school - lockers and walks: Removal and replacement of existing wardrobe and athletic lockers, wall patching and painting at Basement, Sub-Basement, First Floor and Third Floor.
Health & Safety
Rehab of Existing Facility
Completed
2390-060-01-1041
Jersey City
James J. Ferris H.S.
Health & Safety Full-Scope and Electrical Work - Masonry restoration, concrete stair, doors & frames, boiler room roof. Ferris HS HVAC Upgrade
Health & Safety
Rehab of Existing Facility
Completed
2390-070-01-0582
Jersey City
Lincoln H.S. Dr. C. T. Epps Freshman Academy
Renovation of two buildings. Renovation of existing 17,300-s.f. of space and of a 24,500-s.f. addition. Replacement of boiler sys. The new facility will create 29 classrms for 480 students.
School Facility Project
Rehab of Existing Facility
Completed
2390-070-01-1121
Jersey City
Lincoln H.S. Dr. C. T. Epps Freshman Academy
Electrical & HVAC
Health & Safety
Rehab of Existing Facility
Completed
2390-080-01-1122
Jersey City
William L. Dickinson H.S.
Health and Safety improvements. Note: Terra Cotta Restoration scheduled for completion June 2006.
Health & Safety
Rehab of Existing Facility
Completed
2390-080-04-00DG
Jersey City
William L. Dickinson H.S.
Replacement of Boilers
School Facility Project
Rehab of Existing Facility
Construction
2390-095-01-1109
Jersey City
The Academy I M.S.
Door & Hardware Replacement, Window Replacement & Repairs, Structure Repairs and Electrical & Mechanical Work