Abbott Managed Projects
0100-010-00-0504
Asbury Park
Asbury Park H.S.
Repairs include window replacements, door hardware upgrades, main wing roof replacement, repairs to masonry façade, and fire alarm system upgrades.
Health & Safety
Rehab of Existing Facility
Completed
0100-020-00-0505
Asbury Park
Bangs Avenue E.S.
Rehab of the facility-skylight repairs, repair & repainting of stucco façade. Replace lintel, roof at various wings, new exterior unit ventilator grills, sprinklers in boiler room, upgrades to fire alarm sys.
Health & Safety
Rehab of Existing Facility
Completed
0100-020-04-00US
Asbury Park
Bangs Avenue E.S.
Build new Bangs ES rather than rehab
School Facility Project
New Construction
Design
0100-040-00-0391
Asbury Park
Bradley Primary
Addition of classrooms, gym, art and music rooms; various classroom conversions.
School Facility Project
Addition and Rehab of Existing Facility
Completed
0100-040-00-0433
Asbury Park
Bradley Primary
New heating and air conditioning system and a new sprinkler system.
Health & Safety
Rehab of Existing Facility
Completed
0100-070-00-0482
Asbury Park
Asbury Middle School
Replacement of Window, Door hardware, Repair of steps, skylights, structural cracking, spalling and deteriorating walls on building exterior, fire alarm system upgrade, sprinkler heads replacement, unit ventilator grills replacement
Health & Safety
Rehab of Existing Facility
Completed
0100-070-01-0633
Asbury Park
Asbury Middle School
New Addition - 29,875 s.f. includes 45 classrms, 6 SGIs, new cafetorium, music/vocal rm, community rm & media ctr. Renov & upgrades to existing 87,480 s.f. bldg containing 760 students.
School Facility Project
Addition and Rehab of Existing Facility
Construction Bid
0100-100-01-0631
Asbury Park
T. Marshall Primary
Addition - 13,278 s.f., 3-story with 50 classrms for 814 students with new gym/office & locker rooms, stage area, music rm, resource center, conference rms, new kitchen/cafeteria and Renovations to the existing 75,000-s.f. bldg.
School Facility Project
Addition and Rehab of Existing Facility
Completed
0540-020-00-0430
Bridgeton
Bridgeton Senior H.S.
replacement of the curtain wall and doors
Health & Safety
Rehab of Existing Facility
Completed
0540-020-02-0236
Bridgeton
Bridgeton Senior H.S.
Media center & elevator additions
School Facility Project
Addition and Rehab of Existing Facility
Construction
0540-020-04-00ES
Bridgeton
Bridgeton Senior H.S.
HVAC and ceiling replacement.
School Facility Project
Rehab of Existing Facility
Completed
0540-030-00-0681
Bridgeton
Broad Street Elementary School
Remove/install roof, stone coping, new ladders, mechl/elect modifications, skylights removal. Replace curtainwall, masonry repairs, doors and windows.
Health & Safety
Rehab of Existing Facility
Completed
0540-030-02-0868
Bridgeton
Broad Street Elementary School
Pre-Development request of a feasibility study for a building replacement versus rehabilitation.
School Facility Project
Rehab of Existing Facility
PreDevelopment
0540-050-00-0575
Bridgeton
Buckshutem Road E.S. - G. Foster ECC
Roof removal/installation, mechanical/electrical modifications
Health & Safety
Rehab of Existing Facility
Completed
0540-050-01-0524
Bridgeton
Buckshutem Road E.S. - G. Foster ECC
61,000 SF New Bldg Addition provides 24 new classrooms for 360 Pre-K & Kindergarten students and includes a gym, cafetorium w/stage, kitchen, SGI and Admin Offices.
School Facility Project
Addition and Rehab of Existing Facility
Completed
0540-055-00-0478
Bridgeton
Cherry Street E.S.
the replacement of windows and repair/replacement of doors.
Health & Safety
Rehab of Existing Facility
Completed
0540-055-02-0867
Bridgeton
Cherry Street E.S.
Request of a feasibility study for building replacement versus rehab.
School Facility Project
New Construction
PreDevelopment
0540-060-00-0498
Bridgeton
Indian Avenue E.S.
the replacement of windows and repair/replacement of doors.
Health & Safety
Rehab of Existing Facility
Completed
0540-100-00-0653
Bridgeton
Quarter Mile Lane E.S.
replacing the roof
Health & Safety
Rehab of Existing Facility
Completed
0540-130-00-0574
Bridgeton
West Avenue E.S.
roof replacement
Health & Safety
Rehab of Existing Facility
Completed
0600-020-00-0427
Burlington City
Burlington City H.S.
Remove existing fire alarm system and control panel, provide new fire alarm system and control panel, furnish and install new exterior egress lighting.
Health & Safety
Rehab of Existing Facility
Completed
0600-020-01-0957
Burlington City
Burlington City H.S.
Pre-development request for A/E to do Ed Specs/Schematic design. Renovations & additons. Prior SOW for H&S.
School Facility Project
Addition and Rehab of Existing Facility
Construction
0600-020-08-0EAH
Burlington City
Burlington City H.S.
Auxiliary Gym Roof. Investigate condition of existing roof over auxiliary gym and copings. Confirm extent of water infiltration.
School Facility Project
Rehab of Existing Facility
Pending
0600-040-00-0615
Burlington City
Captain James Lawrence E.S.
Upgrades to emergency and exit lighting, PA and sprinkler system, fire resistant upgrades to doors, frames and stair enclosures, heating, electric, and ventilation systems, new exhaust fans and asbestos abatement.
Health & Safety
Rehab of Existing Facility
Completed
0600-050-01-1023
Burlington City
Elias Boudinot E.S.
Upgrades to emergency and exit lighting, PA system, fire resistant upgrades to doors, frames and electric panels, new exhaust fans, fire alarm and asbestos abatement.
Health & Safety
Rehab of Existing Facility
Completed
0600-080-00-0652
Burlington City
Samuel Smith E.S.
Upgrades to emergency and exit lighting, PA system, fire resistant upgrades to doors, frames and electric panels, new exhaust fans, fire alarm and asbestos abatement.
Health & Safety
Rehab of Existing Facility
Completed
0600-080-01-0488
Burlington City
Samuel Smith E.S.
12 pre-K classroom addition, 15K SF
School Facility Project
Addition To Existing Facility
Completed
0600-085-01-0958
Burlington City
Wilbur Watts Intermediate School
Pre-development request for A/E to do Ed Specs/Schematic design for a replacement middle school to Wilbur Watts Intermediate School.
School Facility Project
New Construction
Construction
0600-085-01-1160
Burlington City
Wilbur Watts Intermediate School
New unit ventilators and R.T.U’s, new general & classroom lighting and power, new public address and security systems, masonry repairs and cleaning; new int. and ext. doors and hardware; new windows, boiler repairs and other.
Health & Safety
Rehab of Existing Facility
Completed
0600-N02-09-0JAk
Burlington City
Elias Boudinot Early Childhood Center
Construct new early childhood center
School Facility Project
New Construction
PreDevelopment
0680-010-01-1278
Camden City
Jerrothia Riggs Adult Education Cnt
Electrical lighting and fire alarm system upgrades, and general construction, carpentry, masonry repairs and roofing upgrades.
Health & Safety
Rehab of Existing Facility
Completed
0680-010-03-0214
Camden City
Jerrothia Riggs Adult Education Cnt
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-025-01-0929
Camden City
Early Childhood Development Center #25
Replacement construction in lieu of renovation and addition of the ECDC on existing site.
School Facility Project
New Construction
Construction
0680-025-01-1314
Camden City
Early Childhood Development Center #25
Repairs/replacements include roof, electrical system, window replacements, asbestos abatement, fire alarm upgrades, structural repairs and boiler replacement.
Health & Safety
Rehab of Existing Facility
Completed
0680-025-03-0207
Camden City
Early Childhood Development Center #25
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-027-01-1279
Camden City
South Camden Alternative School
Repair/replace roof, repoint brick, skylight, stair, electrical system, fire alarm detection/escapes/doors, concrete sidewalks, copper water /cast iron pipe, rainwater conductors/scuppers, ceilings, floor drains
Health & Safety
Rehab of Existing Facility
Completed
0680-027-03-0225
Camden City
South Camden Alternative School
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-029-01-1312
Camden City
Brimm Medical Arts H.S.
Repair/replace, roof, exterior masonry, trim, interior and exterior lighting fixture, exterior doors, fire alarm/detection system
Health & Safety
Rehab of Existing Facility
Completed
0680-029-03-0217
Camden City
Brimm Medical Arts H.S.
Install automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-030-01-1015
Camden City
Camden H.S.
evaluation of design exterior masonry/re-pointing as conditions warrant, roof replacement, fire alarm systems/design of fire alarm upgrades, electrical system, lighting and control panel upgrades.
Health & Safety
Rehab of Existing Facility
Completed
0680-030-03-0199
Camden City
Camden H.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-030-03-0823
Camden City
Camden H.S.
Additions and renovations to the existing Camden High School
School Facility Project
Addition and Rehab of Existing Facility
Construction
0680-030-03-0IAG
Camden City
Camden H.S.
Investigate condition of expansion joint at bridge.
School Facility Project
Rehab of Existing Facility
Pending
0680-030-03-0IAH
Camden City
Camden H.S.
Evaluate condition and operation of existing windows.
School Facility Project
Rehab of Existing Facility
Construction Bid
0680-040-00-0429
Camden City
Woodrow Wilson H.S.
Asbestos Abatement, door/hardware replacement, electrical upgrades, electrical lighting, exit signs, exterior wall repair, fire alarm system, interior finishes, window replacement and emergency generator.
Health & Safety
Rehab of Existing Facility
Completed
0680-040-03-0229
Camden City
Woodrow Wilson H.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-045-01-1032
Camden City
East Camden M.S.
install new windows, roof, exterior doors, repair existing fire alarm, replace exit & egress lighting, repair/replace masonry, windows and install new windows.
Health & Safety
Rehab of Existing Facility
Completed
0680-045-03-0206
Camden City
East Camden M.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-045-08-0EAK
Camden City
East Camden M.S.
HVAC
School Facility Project
Rehab of Existing Facility
PreDevelopment
0680-070-01-0933
Camden City
Pyne Poynt Family M.S.
Addition and renovation to existing facility.
School Facility Project
Addition and Rehab of Existing Facility
Construction
0680-070-01-1010
Camden City
Pyne Poynt Family M.S.
Investigation and evaluation for upgrading the building, exterior masonry wall, roof replacement, investigation and design of safety issues, building electrical system/design of lighting control panel upgrades.
Health & Safety
Rehab of Existing Facility
Completed
0680-070-03-0222
Camden City
Pyne Poynt Family M.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-080-01-1319
Camden City
Veterans Memorial M.S.
door/hardware replacement, electrical upgrades, electrical lighting, exit signs, exterior wall repair, fire alarm system, interior finishes, window replacement, emergency generator, fire suppression/standpipe, roofing
Health & Safety
Rehab of Existing Facility
Completed
0680-080-03-0249
Camden City
Veterans Memorial M.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-100-01-1322
Camden City
Bonsall E.S.
Electrical lighting and fire alarm system upgrades, and general construction, carpentry, masonry repairs and roofing upgrades.
Health & Safety
Rehab of Existing Facility
Completed
0680-100-03-0196
Camden City
Bonsall E.S.
Install Automatic ROL Flushing System on Bonsall E.S. Water Lines
School Facility Project
Rehab of Existing Facility
Completed
0680-110-01-1296
Camden City
Broadway E.S.
Repair/replace roof, repoint brick, skylight, stair, electrical system, fire alarm detection/escapes/doors, concrete sidewalks, copper water/cast iron pipe, rainwater conductors/ scuppers, ceilings, floor drains
Health & Safety
Rehab of Existing Facility
Completed
0680-110-03-0250
Camden City
Broadway E.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-110-08-0EAJ
Camden City
Broadway E.S.
Cracking in Exterior Masonry.
School Facility Project
Rehab of Existing Facility
PreDevelopment
0680-140-01-1280
Camden City
Octavius V. Catto Community School
Repair/replace roof, rainwater conductors, exterior CMU walls, cornice, terra cotta, repoint exterior brick, stone windowsills, plaster ceilings, sidewalk, fire alarm /detection system, existing standpipe, lighting, electrical system.
Health & Safety
Rehab of Existing Facility
Completed
0680-140-03-0201
Camden City
Octavius V. Catto Community School
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-165-01-1011
Camden City
Cooper's Poynt E.S.
Electrical lighting and fire system upgrade, and general construction, carpentry, masonry repairs, doors finishes and roofing upgrades.
Health & Safety
Rehab of Existing Facility
Completed
0680-165-03-0202
Camden City
Cooper's Poynt E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-170-01-1016
Camden City
Cramer E.S.
Repair/replace roof, rainwater conductors, exterior CMU walls, cornice, terra cotta, repoint exterior brick, stone windowsills, plaster ceilings, sidewalk, fire alarm /detection system, existing standpipe, lighting, electrical system.
Health & Safety
Rehab of Existing Facility
Completed
0680-170-03-0251
Camden City
Cramer E.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-175-01-0745
Camden City
Riletta T. Cream E.S.
TCU site approval (2)
Other
Temporary Classroom Unit
Completed
0680-175-01-1310
Camden City
Riletta T. Cream E.S.
Electrical lighting and fire system upgrade and general construction, carpentry, masonry repairs, doors and finishes.
Health & Safety
Rehab of Existing Facility
Completed
0680-175-03-0223
Camden City
Riletta T. Cream E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-180-01-1008
Camden City
Davis E.S.
Asbestos Abatement, door/hardware replacement, electrical upgrades, electrical lighting, exit signs, exterior wall repair, fire alarm system, interior finishes, window replacement and emergency generator
Health & Safety
Rehab of Existing Facility
Completed
0680-180-03-0204
Camden City
Davis E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-190-01-0927
Camden City
Dudley E.S.
Replacement of existing Dudley ES on new site
School Facility Project
New Construction
Construction
0680-190-01-1293
Camden City
Dudley E.S.
Repair/replace roof, rainwater conductors, exterior CMU walls, cornice, terra cotta, repoint exterior brick, stone windowsills, plaster ceilings, sidewalk, fire alarm /detection system, existing standpipe, lighting, electrical system.
Health & Safety
Rehab of Existing Facility
Completed
0680-190-03-0205
Camden City
Dudley E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-205-01-1318
Camden City
Forest Hill E.S.
Repairs/replacements include roof, electrical system, window replacements, asbestos abatement, fire alarm upgrades, structural repairs and boiler replacement
Health & Safety
Rehab of Existing Facility
Completed
0680-205-03-0210
Camden City
Forest Hill E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-210-01-1358
Camden City
Hatch M.S.
Remove existing roof, install new multi-ply roof & equipment. Repair existing fire alarm detection system, supplemental lighting fixtures & switching, relamp & reballast existing fixtures, masonry/stone. Remove/replace glass block window.
Health & Safety
Rehab of Existing Facility
Completed
0680-210-03-0211
Camden City
Hatch M.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-215-03-0215
Camden City
Lanning Square E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-215-03-0509
Camden City
Lanning Square E.S.
Build replacement school.
School Facility Project
New Construction
Design
0680-230-01-1009
Camden City
McGraw E.S.
Repair/replace roof, rainwater conductors, exterior CMU walls, cornice, terra cotta, repoint exterior brick, stone windowsills, plaster ceilings, sidewalk, fire alarm /detection system, existing standpipe, lighting, electrical system.
Health & Safety
Rehab of Existing Facility
Completed
0680-230-03-0216
Camden City
McGraw E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-240-01-1311
Camden City
Creative and Performing Arts H.S.
Electrical lighting and fire alarm system upgrades, and general construction, carpentry, masonry repairs and roofing upgrades.
Health & Safety
Rehab of Existing Facility
Completed
0680-240-03-0203
Camden City
Creative and Performing Arts H.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-245-01-0930
Camden City
Morgan Village M.S.
Addition and renovations to Morgan Village. Land acquisition may be required for replacement of parking area. Addition footprint on existing parking lot.
School Facility Project
Addition and Rehab of Existing Facility
Construction
0680-245-01-1012
Camden City
Morgan Village M.S.
install new windows, roof, exterior doors, repair existing fire alarm, replace exit & egress lighting, repair/replace masonry, windows and install new windows.
Health & Safety
Rehab of Existing Facility
Completed
0680-245-03-0219
Camden City
Morgan Village M.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-250-01-1034
Camden City
Raphael Cordero Molina E.S.
Repairs/replacements include roof, electrical system, window replacements, asbestos abatement, fire alarm upgrades, structural repairs and boiler replacement
Health & Safety
Rehab of Existing Facility
Completed
0680-250-03-0248
Camden City
Raphael Cordero Molina E.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-250-08-0EAL
Camden City
Raphael Cordero Molina E.S.
Roofing and HVAC System
School Facility Project
Rehab of Existing Facility
PreDevelopment
0680-260-01-1292
Camden City
Parkside E.S.
Repairs/replacements include roof, electrical system, window replacements, asbestos abatement, fire alarm upgrades, structural repairs and boiler replacement
Health & Safety
Rehab of Existing Facility
Completed
0680-260-03-0220
Camden City
Parkside E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-270-01-1317
Camden City
Powell E.S.
Electrical lighting and fire system upgrade, and general construction, carpentry, masonry repairs, doors finishes and roofing upgrades.
Health & Safety
Rehab of Existing Facility
Completed
0680-270-03-0221
Camden City
Powell E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-300-01-1316
Camden City
Sharp E.S.
Repair/replace roof, rainwater conductors, exterior CMU walls, cornice, terra cotta, repoint exterior brick, stone windowsills, plaster ceilings, sidewalk, fire alarm /detection system, existing standpipe, lighting, electrical system.
Health & Safety
Rehab of Existing Facility
Completed
0680-300-03-0224
Camden City
Sharp E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-300-08-0EAM
Camden City
Sharp E.S.
Evaluate condition of existing roof systems, including gutters.
School Facility Project
Rehab of Existing Facility
PreDevelopment
0680-305-01-1295
Camden City
Challenge Square Academy
Replacement of unsafe playground equipment and subsurface material to bring in compliance with CPSC Playground safety guidelines
Health & Safety
Rehab of Existing Facility
Completed
0680-305-03-0233
Camden City
Challenge Square Academy
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-310-01-1007
Camden City
Sumner E.S.
Repair/replace roof, repoint brick, skylight, stair, electrical system, fire alarm detection/escapes/doors, concrete sidewalks, copper water /cast iron pipe, rainwater conductors/scuppers, ceilings, floor drains
Health & Safety
Rehab of Existing Facility
Completed
0680-310-03-0252
Camden City
Sumner E.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-320-01-0744
Camden City
U.S. Wiggins E.S.
TCU site approval (1)
Other
Temporary Classroom Unit
Completed
0680-320-01-1033
Camden City
U.S. Wiggins E.S.
Repair/replace roof, repoint brick, skylight, stair, electrical system, fire alarm detection/escapes/doors, concrete sidewalks, copper water /cast iron pipe, rainwater conductors/scuppers, ceilings, floor drains
Health & Safety
Rehab of Existing Facility
Completed
0680-320-03-0228
Camden City
U.S. Wiggins E.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-330-01-1294
Camden City
Washington E.S.
Electrical lighting and fire system upgrade and general construction, carpentry, masonry repairs, doors and finishes.
Health & Safety
Rehab of Existing Facility
Completed
0680-330-03-0226
Camden City
Washington E.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-330-08-0EAN
Camden City
Washington E.S.
Investigate reports of mold growth and moisture related issues. Structural.
School Facility Project
Rehab of Existing Facility
PreDevelopment
0680-340-01-1315
Camden City
Whittier E.S.
Repair/replace existing masonry and stone. Remove/replace glass block window, roofing. Electrical lighting and fire alarm system upgraded, and general construction, carpentry, masonry repairs, doors and finishes.
Health & Safety
Rehab of Existing Facility
Completed
0680-340-03-0227
Camden City
Whittier E.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-350-01-0938
Camden City
H. B. Wilson E.S.
Replacement of existing HB Wilson ES on new site.
School Facility Project
New Construction
Construction
0680-350-01-1006
Camden City
H. B. Wilson E.S.
Electrical lighting and fire alarm system upgrades, general construction, carpentry, masonry repairs and roofing upgrades.
Health & Safety
Rehab of Existing Facility
Completed
0680-350-03-0212
Camden City
H. B. Wilson E.S.
Install Automatic ROL Flushing Systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-360-01-1320
Camden City
Yorkship E.S.
door/hardware replacement, electrical upgrades, electrical lighting, exit signs, exterior wall repair, fire alarm system, interior finishes, window replacement, emergency generator, fire suppression/standpipe, roofing
Health & Safety
Rehab of Existing Facility
Completed
0680-360-03-0230
Camden City
Yorkship E.S.
Install Automatic ROL flushing systems on water lines
School Facility Project
Rehab of Existing Facility
Completed
0680-909-01-1313
Camden City
Environmental Center
Repair/replace, roof, exterior masonry, trim, interior and exterior lighting fixture, exterior doors, fire alarm/detection system.
Health & Safety
Rehab of Existing Facility
Completed
0680-917-01-1031
Camden City
Fetters Alternative Sch
Repair/replace roof, repoint brick, skylight, stair, electrical system, fire alarm detection/escapes/doors, concrete sidewalks, copper water /cast iron pipe, rainwater conductors/scuppers, ceilings, floor drains
Health & Safety
Rehab of Existing Facility
Completed
0680-X01-03-0209
Camden City
Fetters Alternative HS
Install automatic ROL Flushing Systems on water lines.
School Facility Project
Rehab of Existing Facility
Completed
0680-X04-03-0200
Camden City
Camden Vocational School
Install automatic ROL Flushing Systems on water lines.
School Facility Project
Rehab of Existing Facility
Completed
1210-010-00-0661
East Orange
B.L. Edmonson Ctr. Adult H.S.
Exterior masonry repair, window replacement, door & hardware upgrade, electric light and wiring upgrades, fire alarm work and emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1210-030-00-0667
East Orange
East Orange Campus 9 (aka Clifford J. Scott HS)
Asbestos abatement disposal; life safety improvements and building envelope restoration.
Health & Safety
Rehab of Existing Facility
Completed
1210-030-01-0722
East Orange
East Orange Campus 9 (aka Clifford J. Scott HS)
Extensive rehabilitation of building
School Facility Project
Rehab of Existing Facility
Completed
1210-040-01-1181
East Orange
East Orange H.S.
Life safety and building envelope restoration.
Health & Safety
Rehab of Existing Facility
Completed
1210-040-02-0295
East Orange
East Orange H.S.
Construction of an auditorium for the East Orange Campus High School
School Facility Project
Addition To Existing Facility
Completed
1210-060-01-1182
East Orange
G.W.Carver Institute
Window replacement, door & hardware upgrade, roof repairs, electric light and wiring upgrades, emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1210-060-02-0296
East Orange
G.W.Carver Institute
Demolition of existing school and replacement of the school on the existing site.
School Facility Project
New Construction
Design
1210-070-08-0EAO
East Orange
John L. Costley, Sr. M.S.
Building Envelope
School Facility Project
Rehab of Existing Facility
Pending
1210-080-01-1184
East Orange
Langston Hughes School
Window replacement, door & hardware upgrade, roof repairs, electric light and wiring upgrades, emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1210-080-08-0EAS
East Orange
Langston Hughes School
Ceilings
School Facility Project
Rehab of Existing Facility
PreDevelopment
1210-090-00-0577
East Orange
Whitney E. Houston Academy E.S.
Life safety improvements and building envelope restoration.
Health & Safety
Rehab of Existing Facility
Completed
1210-090-08-0EAR
East Orange
Whitney E. Houston Academy E.S.
Ceilings
School Facility Project
Rehab of Existing Facility
PreDevelopment
1210-093-01-1183
East Orange
Fourth Avenue E.S.
Window replacement, door & hardware upgrade, roof repairs, electric light and wiring upgrades, emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1210-093-05-0IAO
East Orange
Fourth Avenue E.S.
Ceilings
School Facility Project
Rehab of Existing Facility
PreDevelopment
1210-100-00-0662
East Orange
Mildred B. Garvin MicroSociety Sch
Life safety improvements and building envelope restoration.
Health & Safety
Rehab of Existing Facility
Completed
1210-100-02-0613
East Orange
Mildred B. Garvin MicroSociety Sch
Two additions equaling 50,000 sf and rehabilition of existing facility.
School Facility Project
Addition and Rehab of Existing Facility
Construction
1210-110-01-1180
East Orange
Dionne Warwick Institute
Window replacement, door & hardware upgrade, electric light and wiring upgrades and emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1210-110-08-0EAP
East Orange
Dionne Warwick Institute
Ceilings
School Facility Project
Rehab of Existing Facility
PreDevelopment
1210-120-01-1179
East Orange
Ecole T.Louverture E.S.
Window replacement, door & hardware upgrade, roof repairs, electric light and wiring upgrades, emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1210-120-06-0EAU
East Orange
Ecole T.Louverture E.S.
Ceilings
School Facility Project
Rehab of Existing Facility
PreDevelopment
1210-130-01-1185
East Orange
Gordon Parks Academy E.S.
Electrical light and wiring upgrades and roofing repair.
Health & Safety
Rehab of Existing Facility
Completed
1210-140-01-1176
East Orange
Washington Academy E.S.
Window replacement, door & hardware upgrade, roof repairs, electric light and wiring upgrades, emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1210-140-08-0EAW
East Orange
Washington Academy E.S.
Ceilings
School Facility Project
Rehab of Existing Facility
PreDevelopment
1210-150-01-1178
East Orange
Cicely Tyson School
Window replacement, door & hardware upgrade, electric light and wiring upgrades and emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1210-150-04-0IAP
East Orange
Cicely Tyson School
Ceilings
School Facility Project
Rehab of Existing Facility
PreDevelopment
1210-170-01-1177
East Orange
J. Garfield Jackson, Sr. Academy ES
Exterior masonry repair, window replacement, door & hardware upgrade, electric light and wiring upgrades, fire alarm work and emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1210-170-08-0EAT
East Orange
J. Garfield Jackson, Sr. Academy ES
Ceilings
School Facility Project
Rehab of Existing Facility
PreDevelopment
1210-190-08-0EAQ
East Orange
Johnnie L. Cochran Jr. Academy E.S.
Ceilings
School Facility Project
Rehab of Existing Facility
PreDevelopment
1210-906-00-0668
East Orange
Hart Middle School
Life safety and building envelope restoration.
Health & Safety
Rehab of Existing Facility
Completed
1210-E01-01-0873
East Orange
Wahlstrom Early Childhood Center
Roof replacement, boiler installation, Handicap modifications for ADA, cafetorium plumbing, Insulation of floors and piping, exterior fascia repair
School Facility Project
Rehab of Existing Facility
Completed
1210-x05-01-0808
East Orange
New ES #5 (-x05)
Site for new 90,000-s.f. ES to house pre-k thru 8th grade students.
School Facility Project
New Construction
Construction
1210-x07-01-0792
East Orange
New - Langston Hughes Replacement (-x07)
The 92,146-s.f. replacement school will be built next to the existing facility & house 516 pre-k thru 5th grade students.
School Facility Project
New Construction
Completed
1320-025-00-0611
Elizabeth
Elizabeth H.S.
New complete fire alarm. Replace exterior doors and hardware. Roofing repairs.
School Facility Project
Rehab of Existing Facility
Completed
1320-025-03-0833
Elizabeth
Elizabeth H.S.
Remodel of 17 classrooms/spaces in the Five House to create additional classroom space
School Facility Project
Rehab of Existing Facility
Completed
1320-030-00-0639
Elizabeth
Number 76, Reilly M.S.
Electrical modifications, general construction and roofing work, window replacement.
Health & Safety
Rehab of Existing Facility
Completed
1320-035-00-0515
Elizabeth
Number 75, Battin M.S.
New Roof, masonry, gym pads, radiator covers and exit signs.
Health & Safety
Rehab of Existing Facility
Completed
1320-050-00-0606
Elizabeth
Number 70, Cleveland M.S.
New roof, masonry, doors, stairs and auditorium lighting.
Health & Safety
Rehab of Existing Facility
Completed
1320-060-00-0512
Elizabeth
Number 72, Hamilton M.S.
New roof, masonry, exit signs and windows
Health & Safety
Rehab of Existing Facility
Completed
1320-090-00-0463
Elizabeth
Number 1, George Washington E.S.
New roof, masonry, windows, exit signs and hallway walls
Health & Safety
Rehab of Existing Facility
Completed
1320-100-00-0607
Elizabeth
Number 2, Winfield Scott E.S.
New roof, masonry, windows, exit signs, handrails, toilet exhaust fans
Health & Safety
Rehab of Existing Facility
Completed
1320-110-00-0604
Elizabeth
Number 3, Peterstown E.S. aka Nicholas Lacorte
Roof repairs, door hardware, fire alarm.
School Facility Project
Rehab of Existing Facility
Completed
1320-120-00-0609
Elizabeth
Number 6, Marquis deLafayette E.S.
Electrical modifications, general construction and roofing work, window replacement.
Health & Safety
Rehab of Existing Facility
Completed
1320-160-00-0464
Elizabeth
Number 13, Benjamin Franklin E.S.
Emergency lighting, doors and hardware, gymnasium wall pads, exterior brick restoration, lead paint removal.
Health & Safety
Rehab of Existing Facility
Completed
1320-170-00-0545
Elizabeth
Number 14, Abraham Lincoln E.S.
Roofing, masonry work, general construction work, mechanical and electrical work.
Health & Safety
Rehab of Existing Facility
Completed
1320-180-00-0603
Elizabeth
Number 15, Christopher Columbus ES
New roof, masonry, doors and hardware, rubber stair tread, gym pads, exit signs, windows, radiator covers
Health & Safety
Rehab of Existing Facility
Completed
1320-190-00-0608
Elizabeth
Number 16, Madison-Monroe E.S.
New roof, masonry, doors and hardware, window, boilers, piping and unit ventilators.
Health & Safety
Rehab of Existing Facility
Completed
1320-200-00-0640
Elizabeth
Number 17, Theodore Roosevelt E.S.
New roof, masonry, transoms, gym wall pads and radiator covers.
Health & Safety
Rehab of Existing Facility
Completed
1320-220-00-0677
Elizabeth
Number 19, Woodrow Wilson E.S.
New doors and hardware, exhaust fans, unit ventilators, control wiring, exit and emergency lights.
Health & Safety
Rehab of Existing Facility
Completed
1320-230-00-0610
Elizabeth
Number 20, John Marshall E.S.
Door repairs, light installation, generator repairs.
School Facility Project
Rehab of Existing Facility
Completed
1320-240-00-0678
Elizabeth
Number 21, Victor Mravlag E.S.
New roof, door hardware, masonry and hand rails.
Health & Safety
Rehab of Existing Facility
Completed
1320-240-03-0339
Elizabeth
Number 21, Victor Mravlag E.S.
Rehab and addition to accommodate unhoused students and program needs
School Facility Project
Addition and Rehab of Existing Facility
Construction
1320-250-00-0605
Elizabeth
Number 22, William F. Halloran E.S.
New roof, door hardware, masonry improvements and hand rails.
Health & Safety
Rehab of Existing Facility
Completed
1320-260-00-0513
Elizabeth
Number 23, N.M. Butler E.S.
New masonry, doors and hardware and windows
Health & Safety
Rehab of Existing Facility
Completed
1320-901-00-0461
Elizabeth
Edison House School
Roofing, masonry, general construction, mechanical/electrical work; and window replacement.
Health & Safety
Rehab of Existing Facility
Completed
1320-902-00-0462
Elizabeth
Jefferson House
Replace windows, roofing and masonry. Repair Drywall partition, doors & hardware, misc. electrical work.
Health & Safety
Rehab of Existing Facility
Completed
1320-903-00-0629
Elizabeth
No 23 Annex - JP Mitchell Bldg
New door hardware and emergency lighting.
Health & Safety
Rehab of Existing Facility
Completed
1320-904-00-0628
Elizabeth
Sam Aboff House H.S.
Roofing, masonry, general construction, mechanical/electrical work.
Health & Safety
Rehab of Existing Facility
Completed
1320-999-01-EA17
Elizabeth
Elizabeth Multi-Facility/TCU
TCU AE Services - Temp
Multi-Facility/TCU
Temporary Classroom Unit
Completed
1320-999-01-EA18
Elizabeth
Elizabeth Multi-Facility/TCU
TCU AE Services - Temp
Multi-Facility/TCU
Temporary Classroom Unit
Completed
1320-999-01-EA19
Elizabeth
Elizabeth Multi-Facility/TCU
TCU AE Services - Temp
Multi-Facility/TCU
Temporary Classroom Unit
Completed
1320-999-01-EA20
Elizabeth
Elizabeth Multi-Facility/TCU
TCU AE Services - Temp
Multi-Facility/TCU
Temporary Classroom Unit
Completed
1320-999-01-EA21
Elizabeth
Elizabeth Multi-Facility/TCU
TCU AE Services - Temp
Multi-Facility/TCU
Temporary Classroom Unit
Completed
1320-E02-01-0089
Elizabeth
New pre K-8 #27
Build replacement school PS 17, gsf, 650 Pre-K thru 8th grade students.
School Facility Project
New Construction
Construction
1320-N14-03-0797
Elizabeth
Dr. MLK Jr Center for ECC School # 52
Construction of 55,000 s.f. single-story bldg - includes 20 classrms, courtyard play and reading areas, etc. for approx. 300 Pre-K students.
School Facility Project
New Construction
Completed
1320-NS1-01-0906
Elizabeth
Monsignor Joao S. Antao School No. 31
acquisition of site and construciton of a pre-K-8 facility adjacent to an existing pre-K facility
School Facility Project
New Construction
Completed
1320-x01-01-0087
Elizabeth
Donald Stewart ECC #51 (aka ECC#44)
Construction of a 56,000 s.f. single-story bldg with 20 classrooms, outdoor courtyard play and reading areas, etc. for approx. 300 Pre-K students.
School Facility Project
New Construction
Completed
1320-x04-01-0090
Elizabeth
New pre K-8 #28
Construction of new 119,000 s.f. facility includes classrooms, SGI rms, media ctr (library), art & music rms, science labs, cafetorium, gyms, computer labs, softball field, etc. for 750 Pre-K thru 8th grade students.
School Facility Project
New Construction
Construction
1320-x05-01-0091
Elizabeth
Dr. Albert Einstein School (aka #29)
Construction of new 118,452 s.f. facility will include classrooms, SGI rms, media ctr (library), art & music rms, science labs, cafetorium, gyms, computer labs, playgrounds for approx 750 Pre-K thru 8th grade students.
School Facility Project
New Construction
Completed
1320-x06-01-0866
Elizabeth
Ronald Reagan Academy School # 30 (pre K-8 #30)
Construction of new 119,860 s.f. facility will include classrooms, SGI rms, media ctr (library), art & music rms, science labs, cafetorium, gyms, computer labs, playgrounds for approx 750 Pre-K thru 8th grade students.
School Facility Project
New Construction
Completed
1320-x07-01-0867
Elizabeth
New Academic HS
New Facility
School Facility Project
New Construction
Design
1700-050-00-0453
Garfield
Garfield H.S.
upgrade fire alarm systems, exit and emergency lighting systems, upgrade communication system, restoration of brickwork, and replacement of doors.
Health & Safety
Rehab of Existing Facility
Completed
1700-060-00-0499
Garfield
Columbus E.S.
upgrade fire alarm systems, exit and emergency lighting systems, upgrade communication system, restoration of brickwork, and replacement of doors.
Health & Safety
Rehab of Existing Facility
Completed
1700-070-00-0563
Garfield
Thomas Jefferson M.S.
upgrade fire alarm systems, exit and emergency lighting systems, upgrade communication system, restoration of brickwork, and replacement of doors.
Health & Safety
Rehab of Existing Facility
Completed
1700-080-01-1110
Garfield
Lincoln E.S.
upgrade fire alarm systems, exit and emergency lighting systems, upgrade communication system, restoration of brickwork, and replacement of doors.
Health & Safety
Rehab of Existing Facility
Completed
1700-100-00-0562
Garfield
Roosevelt E.S.
upgrade fire alarm systems, exit and emergency lighting systems, upgrade communication system, restoration of brickwork, and replacement of doors.
Health & Safety
Rehab of Existing Facility
Completed
1700-100-02-0430
Garfield
Roosevelt E.S.
Roof replacement, exterior moisture protection, renovation work consisting of a masonry re-pointing, EIFS work and caulking sealant work. Main entrance door assembly replacement work and interior restoration due to moisture damage.
Health & Safety
Rehab of Existing Facility
Completed
1700-120-01-1070
Garfield
Washington Irving E.S.
upgrade fire alarm systems, exit and emergency lighting systems, upgrade communication system, restoration of brickwork, and replacement of doors.
Health & Safety
Rehab of Existing Facility
Completed
1700-130-00-0497
Garfield
Woodrow Wilson E.S.
upgrade fire alarm systems, exit and emergency lighting systems, upgrade communication system, restoration of brickwork, and replacement of doors.
Health & Safety
Rehab of Existing Facility
Completed
1700-205-03-0315
Garfield
James Madison School #10 (Most Holy Name)
Purchase & rehab a facility leased by school district. Facility to be demolished & replaced with new construction.
School Facility Project
New Construction
Construction Bid
1700-e01-01-0973
Garfield
Garfield Early Childhood Center (aka New ECC)
Site analysis, land acquisition for new ECC. Swing space required (TCU) to be housed at site for MS see project #1700-N01-02-0114
School Facility Project
New Construction
Completed
1700-n01-02-0114
Garfield
New Middle School
Site analysis, land acquisition for new MS.
School Facility Project
New Construction
Construction
1770-050-00-0566
Gloucester City
Gloucester City Jr. Sr. H.S.
Communication system, electric upgrades, emergency generator, lighting, exit lighting, exterior/interior doors/frames, wall repairs, fire alarm, fire suppression, hardware, HVAC, windows, plumbing, security and sitework.
Health & Safety
Rehab of Existing Facility
Completed
1770-050-01-0078
Gloucester City
Gloucester City Jr. Sr. H.S.
Replace existing boiler and related items, replace existing roofing system, roof drains and rain leaders
Health & Safety
Rehab of Existing Facility
Completed
1770-050-03-0187
Gloucester City
Gloucester City Jr. Sr. H.S.
Additions: Gymnasium & Library/Media Center. Complete upgrade of HVAC & electrical sys, & plumbing. Interior renovation to all Science and Elective Classrms.
School Facility Project
Addition and Rehab of Existing Facility
Completed
1770-100-00-0565
Gloucester City
Mary E. Costello E.S.
Communication system, electric upgrades, emergency generator, lighting, exit lighting, exterior/interior doors/frames, wall repairs, fire alarm, fire suppression, hardware, HVAC, windows, plumbing, security and sitework.
Health & Safety
Rehab of Existing Facility
Completed
1770-160-01-0245
Gloucester City
Cold Springs E.S.
New ECC addition consisting of 20 pre-K classrms, multi-purpose rm, storage, support kitchen, etc. Rehab to include toilet rooms.
School Facility Project
Addition To Existing Facility
Completed
1770-160-01-0746
Gloucester City
Cold Springs E.S.
TCU site approval - Removal of TCUs (18). This project is related to: 1770-160-01-0245 (addition to Cold Springs Elementary).
Other
Temporary Classroom Unit
Completed
1770-N01-03-0188
Gloucester City
New Middle School
Pre-development request for land acquisition and construction of a new MS
School Facility Project
New Construction
Construction
2060-050-00-0460
Harrison
Harrison H.S.
Renovations to interior and exterior, including the basement, auditorium, gymnasium, and media center.
Health & Safety
Rehab of Existing Facility
Completed
2060-050-01-0833
Harrison
Harrison H.S.
Conversion of existing HS into MS
School Facility Project
Rehab of Existing Facility
Construction Bid
2060-060-00-0480
Harrison
Lincoln No. 3 E.S.
Window replacement, metal stairs, lintel roofing & related masonry.
Health & Safety
Rehab of Existing Facility
Completed
2060-070-00-0459
Harrison
Washington No. 1 M.S.
Renovation primary focus handicap accessible. Remodel bathrooms, door entrances, add ramps and new elevator. The cafeteria and building's façade will be remodeled.
Health & Safety
Rehab of Existing Facility
Completed
2060-x01-01-0832
Harrison
New Harrison High School (-x01)
New 167,000 s.f. includes 30 general classrms, 4 special ed classrms, 2 SGI classrms. gym, music rm, cafeteria, auditorium, media ctr, science labs, computer rm and athletic fields on the site. Student capacity of 850.
School Facility Project
New Construction
Construction
2210-005-00-0691
Hoboken
Hoboken H.S.
Replace roofing system & flashing, skylights, rooftop exhaust fans and exterior doors. Upgrade emergency lighting, fire alarm, fire separation assembly, egress corridor.
Health & Safety
Rehab of Existing Facility
Completed
2210-005-03-0786
Hoboken
Hoboken H.S.
Resurfacing of field and replacement of running track
Health & Safety
Rehab of Existing Facility
Completed
2210-010-00-0626
Hoboken
A.J. Demarest M.S.
Restore masonry surface & cracks, repair parapet, lintels, electrical & fire alarm upgrade. Replace roofing system, flashing, skylights, rooftop exhaust fans, roof top play area.
Health & Safety
Rehab of Existing Facility
Completed
2210-050-00-0624
Hoboken
Joseph F. Brandt No. 2 M.S.
Replace roof sys, flashing, skylights, rooftop exhaust fans, ext windows, restore masonry & cracks, repair parapet, lintels, elect fire alarm, emer sys, upgrade egress corridor, lobby, stairs, stairways, fire supp sys, replace elevator.
Health & Safety
Rehab of Existing Facility
Completed
2210-063-00-0625
Hoboken
Salvatore R. Calabro, No. 4 E.S.
Replace roofing sys & flashing, skylights, rooftop exhaust fans, rooftop play area, curtain wall, exterior doors & frames, fire alarm sys & elect upgrades, exterior masonry repair, power washing and misc. work.
Health & Safety
Rehab of Existing Facility
Completed
2210-063-01-0780
Hoboken
Salvatore R. Calabro, No. 4 E.S.
Convert MS to ES. Renovation work results: 9 classrooms, admin offices, cafetorium, computer rms, gym, media ctr, art/music rm and stage.
School Facility Project
Rehab of Existing Facility
Construction
2210-065-00-0627
Hoboken
Thomas G. Connors
Upgrade/reno egress corridor, lobby, exit stairs, handrails, fire suppr sys, rebld wall, replace elect fire alarm & emerg sys, ext windows, doors, frames, constr exterior fire stair, repair fire escape, parapet, masonry cracks, lintels.
Health & Safety
Rehab of Existing Facility
Completed
2210-065-01-0783
Hoboken
Thomas G. Connors
Renovations to Thomas G. Connors E.S. will result in 18 classrooms, administrative offices, cafetorium, computer room, gymnasium, media center, art/music room, stage, science rooms and renovated playground.
School Facility Project
Rehab of Existing Facility
Design
2210-070-00-0692
Hoboken
Wallace No. 6 E.S.
Replace roof sys, flashing, skylights, rooftop exhst fans, extr windows, doors, frames, parapet,masonry cracks, lintels,elect fire alarm & emerg sys, generator, fire suppr system, stair treads, upgrade egress corridors, lobby & exit stairs.
Health & Safety
Rehab of Existing Facility
Completed
2330-050-00-0684
Irvington Township
Irvington H.S.
Masonry repairs, door replacement, fire detection & intercom upgrades, and lighting protection system. Windows replacement, curtain wall rehabilitation and related masonry work.
Health & Safety
Rehab of Existing Facility
Completed
2330-070-00-0578
Irvington Township
Augusta Street Preschool
Replace roofing sys, rain conductors, doors, misc, flashing, infrared surveying, refurb canopy, chimney repair/replacement, windows. Masonry repairs and electrical upgrades.
Health & Safety
Rehab of Existing Facility
Completed
2330-070-03-0754
Irvington Township
Augusta Street Preschool
Demolition, rehabilitation, addition and correction of deficiencies to existing facility for conversion into a kindergarten facility
School Facility Project
Addition and Rehab of Existing Facility
Construction
2330-080-00-0570
Irvington Township
Berkeley Terrace E.S.
Replace roofing sys, infrared surveying, rain conductors, flashing, doors, chimney & pkgd air-cooled AC units . Masonry repairs, fire & smoke detection & electrical upgrades, replace pkgd air cooled AC units & refurbish canopy & windows.
Health & Safety
Rehab of Existing Facility
Completed
2330-090-00-0655
Irvington Township
Chancellor Avenue E.S.
Masonry repairs, door & window replacement, fire alarm, plumbing and electrical upgrades.
Health & Safety
Rehab of Existing Facility
Completed
2330-100-00-0669
Irvington Township
Florence Avenue E.S.
Replace roofing sys, doors, infrared surveying, rain conductors, misc. flashing, refurb canopy & windows, balances, shoes, chimney repair/replace. Masonry repairs, elect, fire & smoke detect upgrade, repair air cooled AC units.
Health & Safety
Rehab of Existing Facility
Completed
2330-110-00-0670
Irvington Township
Grove Street E.S.
Replace roofing sys, doors, infrared surveying, rain conductors, misc. flashing, refurb canopy & windows, balances, shoes, chimney repair/replace. Masonry repairs, elect, fire & smoke detect upgrade, repair air cooled AC units.
Health & Safety
Rehab of Existing Facility
Completed
2330-120-00-0685
Irvington Township
Madison Avenue E.S.
Masonry repairs, doors replacement, window repair/replacement. Replace existing roofing sys, infrared surveying, existing rain conductors, misc. flashing, refurbish existing canopy, chimney repair/replacement.
Health & Safety
Rehab of Existing Facility
Completed
2330-120-03-0755
Irvington Township
Madison Avenue E.S.
Land Acquisition and A/E selection processes for the demolition, addition and rehabilitation to the above facility.
School Facility Project
Addition and Rehab of Existing Facility
Design
2330-130-00-0683
Irvington Township
Mt. Vernon Avenue E.S.
Masonry repairs, window replacement, window repairs, electrical upgrades and environmental work.
Health & Safety
Rehab of Existing Facility
Completed
2330-130-02-0432
Irvington Township
Mt. Vernon Avenue E.S.
The new 93,821-sf replacement ES will be a multi-level facility with 31 classrms housing 582 Pre-K thru 5th grade students and include a media center, gymnasium, and auditorium.
School Facility Project
New Construction
Construction
2330-137-01-0720
Irvington Township
University Six School
Purchase and renovation of bldg currently leased
School Facility Project
Rehab of Existing Facility
Construction
2330-137-01-1038
Irvington Township
University Six School
Windows replacement, curtain wall rehabilitation and related masonry work.
Health & Safety
Rehab of Existing Facility
Completed
2330-137-04-000S
Irvington Township
University Six School
Replace existing roof
School Facility Project
Rehab of Existing Facility
Completed
2390-050-00-0696
Jersey City
Henry Snyder H.S.
Replace doors & hardware, interior finishes, exit signs, emergency egress lighting and new ductwork for boiler room. Masonry restoration & repairs, waterproofing, lintel repair or replacement, plaster repairs and asbestos abatement.
Health & Safety
Rehab of Existing Facility
Completed
2390-050-01-0877
Jersey City
Henry Snyder H.S.
Renovation of school - lockers and walks: Removal and replacement of existing wardrobe and athletic lockers, wall patching and painting at Basement, Sub-Basement, First Floor and Third Floor.
Health & Safety
Rehab of Existing Facility
Completed
2390-060-01-1041
Jersey City
James J. Ferris H.S.
Health & Safety Full-Scope and Electrical Work - Masonry restoration, concrete stair, doors & frames, boiler room roof. Ferris HS HVAC Upgrade
Health & Safety
Rehab of Existing Facility
Completed
2390-070-01-0582
Jersey City
Lincoln H.S. Dr. C. T. Epps Freshman Academy
Renovation of two buildings. Renovation of existing 17,300-s.f. of space and of a 24,500-s.f. addition. Replacement of boiler sys. The new facility will create 29 classrms for 480 students.
School Facility Project
Rehab of Existing Facility
Completed
2390-070-01-1121
Jersey City
Lincoln H.S. Dr. C. T. Epps Freshman Academy
Electrical & HVAC
Health & Safety
Rehab of Existing Facility
Completed
2390-080-01-1122
Jersey City
William L. Dickinson H.S.
Health and Safety improvements. Note: Terra Cotta Restoration scheduled for completion June 2006.
Health & Safety
Rehab of Existing Facility
Completed
2390-080-04-00DG
Jersey City
William L. Dickinson H.S.
Replacement of Boilers
School Facility Project
Rehab of Existing Facility
Construction
2390-095-01-1109
Jersey City
The Academy I M.S.
Door & Hardware Replacement, Window Replacement & Repairs, Structure Repairs and Electrical & Mechanical Work
Health & Safety
Rehab of Existing Facility
Completed
2390-110-01-1188
Jersey City
Number 5 E.S.
Health & Safety Full-Scope and Electrical Work - Masonry restoration, concrete stair, doors & frames, boiler room roof.
Health & Safety
Rehab of Existing Facility
Completed
2390-110-04-00DD
Jersey City
Number 5 E.S.
Immediate need to close existing underground storage tank and to provide natural gas fuel and new burners for existing boilers.
School Facility Project
Rehab of Existing Facility
Construction
2390-120-01-0806
Jersey City
Number 8 E.S.
Renovation of school
School Facility Project
Rehab of Existing Facility
Completed
2390-120-01-1060
Jersey City
Number 8 E.S.
Door & Hardware Replacement, Window Replacement & Repairs, Structure Repairs and Electrical & Mechanical Work
Health & Safety
Rehab of Existing Facility
Completed
2390-130-01-1108
Jersey City
Kennedy, No. 9 E.S.
Doors & Hardware Replacement, Window Repairs & Security Screens, Masonry Repair & Exterior Rehabilitation, Electrical upgrades and Masonry Repairs & Exterior Rehab.
Health & Safety
Rehab of Existing Facility
Completed
2390-150-00-0697
Jersey City
Julia A. Barnes No. 12 E.S.
Replacement of doors and hardware w/associated electrical work and masonry repairs, new water heater, fire protection and fire escape bracing, including finishes.
Health & Safety
Rehab of Existing Facility
Completed
2390-160-00-0699
Jersey City
Number 14 E.S.
Replacement of doors and hardware w/associated electrical work and masonry repairs, new water heater, fire protection and fire escape bracing, including finishes.
Health & Safety
Rehab of Existing Facility
Completed
2390-170-01-1017
Jersey City
Whitney M. Young, Jr. No. 15 E.S.
Roof Replacement & Repairs, Replace doors & hardware, interior finishes, new exit signs, emergency egress lighting and new ductwork for boiler room. Exterior Wall Repairs Package
Health & Safety
Rehab of Existing Facility
Completed
2390-190-01-0581
Jersey City
Number 20 E.S.
PS 20 located on Danforth Ave to be replaced with new facility that will front Ocean Avenue. The new 111,587-s.f. facility will house 731 K-5 students.
School Facility Project
New Construction
Design
2390-200-00-0700
Jersey City
Number 22 E.S.
Doors & Hardware Replacement, Window Repairs & Security Screens, Masonry repairs, concrete repairs and exterior rehabilitation, terra cotta replacement and lintel replacement.
Health & Safety
Rehab of Existing Facility
Completed
2390-200-04-00DB
Jersey City
Number 22 E.S.
Replacement of Boilers
School Facility Project
Rehab of Existing Facility
Completed
2390-210-00-0698
Jersey City
Number 23 E.S.
Doors & Hardware Replacement, Window Repairs & Security Screens, Masonry repairs, concrete repairs and exterior rehabilitation, terra cotta replacement and lintel replacement.
Health & Safety
Rehab of Existing Facility
Completed
2390-220-00-0651
Jersey City
Number 24 E.S.
Replacement of skylights with incidental roof repair work. Replacement of doors & hardware, window repairs, and exterior rehabilitation.
Health & Safety
Rehab of Existing Facility
Completed
2390-220-01-0580
Jersey City
Number 24 E.S.
Comprehensive renovations of 117,000-s.f. & a 30,000-s.f. addition. To be converted into model-size K-5 facility for 700 students. Addition is planned on district-owned land & includes gym, cafe, music rms & academic support spaces.
School Facility Project
Addition and Rehab of Existing Facility
Construction Bid
2390-230-01-1059
Jersey City
Nicolas Copernicus No. 25 E.S.
Doors, frames and hardware, Window repair and replacement and Electrical & Mechanical Upgrades.
Health & Safety
Rehab of Existing Facility
Completed
2390-240-00-0693
Jersey City
Alfred E. Zampella No. 27 E.S.
Roof Replacement, Doors & Hardware Replacement, Electrical upgrades and Masonry Repairs & Exterior Rehab.
Health & Safety
Rehab of Existing Facility
Completed
2390-250-01-1107
Jersey City
Number 28 E.S.
Replacement of doors & hardware, masonry restoration, window repairs, interior finishes, plumbing and electrical improvements.
Health & Safety
Rehab of Existing Facility
Completed
2390-280-00-0581
Jersey City
Number 34 E.S.
Replacement of doors and hardware w/associated electrical work and masonry repairs, new water heater, fire protection and fire escape bracing, including finishes.
Health & Safety
Rehab of Existing Facility
Completed
2390-280-04-00QE
Jersey City
Number 34 E.S.
Rehabilitation - Masonry Replacement/Repairs including Parapet Walls.
School Facility Project
Rehab of Existing Facility
Construction
2390-300-00-0580
Jersey City
Rafael de J. Cordero No. 37 E.S.
Masonry restoration, door replacement, window repair, and lighting work.
Health & Safety
Rehab of Existing Facility
Completed
2390-300-04-00DE
Jersey City
Rafael de J. Cordero No. 37 E.S.
Replacement of Boilers
School Facility Project
Rehab of Existing Facility
Completed
2390-320-00-0650
Jersey City
Alexander D. Sullivan No. 30 E.S.
Replacement of doors & hardware, window repairs, and exterior rehabilitation.
Health & Safety
Rehab of Existing Facility
Completed
2390-320-04-00DC
Jersey City
Alexander D. Sullivan No. 30 E.S.
Closure of existing underground storage tank and replacement of existing boilers with gas fuel boilers.
School Facility Project
Rehab of Existing Facility
Completed
2390-330-01-0810
Jersey City
Dr. Charles P. DeFuccio No. 39 ES
Renovations - Auditorium Seating Replacement.
School Facility Project
Rehab of Existing Facility
Completed
2390-330-01-1073
Jersey City
Dr. Charles P. DeFuccio No. 39 ES
Doors, frames and hardware, window repair and replacement, Masonry Restoration and Electrical & Mechanical Upgrades.
Health & Safety
Rehab of Existing Facility
Completed
2390-340-01-1072
Jersey City
Cornelia F. Bradford No. 16 E.S.
Full Scope - Masonry restoration, door replacement, window repair, and lighting work.
Health & Safety
Rehab of Existing Facility
Completed
2390-345-00-0695
Jersey City
Ezra L. Nolan No. 40 E.S.
Doors & Hardware Replacement, Masonry repairs, terra cotta restoration, lintel replacement and waterproofing, Electrical upgrades and Masonry repairs, concrete repairs and concrete replacement.
Health & Safety
Rehab of Existing Facility
Completed
2390-345-02-0189
Jersey City
Ezra L. Nolan No. 40 E.S.
Auditorium seating
School Facility Project
Rehab of Existing Facility
Completed
2390-347-01-1075
Jersey City
Fred W. Martin No. 41 E.S.
Door & Hardware Replacement, Window Replacement & Repairs, Structure Repairs and Electrical & Mechanical Work
Health & Safety
Rehab of Existing Facility
Completed
2390-350-01-1105
Jersey City
James F. Murray No. 38 E.S.
Renovations of classrms and support spaces to the 157,540-s.f. for 675 K-5 students.
Health & Safety
Rehab of Existing Facility
Completed
2390-350-04-00RP
Jersey City
James F. Murray No. 38 E.S.
School is to be renovated and mechanical equipment upgrades
School Facility Project
Rehab of Existing Facility
Completed
2390-370-01-1039
Jersey City
Jotham W. Wakeman No. 6 E.S.
Roof Replacement & Repairs, Replacement of doors and hardware, interior finishes new exit signs & emergency egress lighting and new ductwork for boiler room. Window Replacement Package & Exterior Wall Repairs Package.
Health & Safety
Rehab of Existing Facility
Completed
2390-999-01-EA13
Jersey City
Jersey City Multi-Facility/TCU
TCU AE Services - Temp
Multi-Facility/TCU
Temporary Classroom Unit
Completed
2390-N01-99-0227
Jersey City
Frank R. Conwell ES #3 (aka New PS3 ES)
Jersey City has acquired land for the project. New PS 3 ES and new PS 3 MS will share the same site.
School Facility Project
New Construction
Completed
2390-N02-99-0228
Jersey City
Frank R. Conwell MS #4 (New Middle School #4)
Jersey City has acquired land for the project. New PS3 ES & new PS3 MS will share the same site.
School Facility Project
New Construction
Completed
2390-N03-99-0147
Jersey City
Heights Middle School (-N03)
Purchase of land and construction of a new 148,302-sf MS.
School Facility Project
New Construction
Construction
2390-x03-01-0587
Jersey City
ECC 03
Purchase of land and construction of ECC 03
School Facility Project
New Construction
Design
2390-x09-01-0576
Jersey City
Glenn D. Cunningham ECC (aka ECC 09)
Purchase of land and existing bldg. Full renovatins of an existing 13,000-s.f. commercial bldg. The project includes 15 new classrooms for a projected enrollment of 75 Pre-K students.
School Facility Project
Rehab of Existing Facility
Completed
2390-x13-01-0593
Jersey City
ECC 13
Purchase of land for new 43,246-s.f. ECC 13 to house 324 Pre-K students.
School Facility Project
New Construction
Design
2390-x14-01-0594
Jersey City
ECC 14
Purchase of land and construction of ECC #14
School Facility Project
New Construction
Design
2390-x23-01-0597
Jersey City
New ES #03 (-x23)
Purchase of land for new 127,135-s.f. K-5 facility to house 658 students and include parking and play areas.
School Facility Project
New Construction
Design
2400-010-00-0434
Keansburg Borough
Keansburg H.S.
Demolition, Roofing, Mechanical upgrades, Fire Alarm, Emergency Lighting, Power system upgrade Doors, Windows, Communications system, Vermin Remediation, Structural repairs, ADA Upgrades, Chair lift, Signage
Health & Safety
Rehab of Existing Facility
Completed
2400-030-00-0435
Keansburg Borough
Joseph R. Bolger Middle School
Demolition, Roofing, Mechanical upgrades, Fire Alarm, Emergency Lighting, Power system upgrade Doors, Windows, Communications system, Vermin Remediation, Structural repairs, ADA Upgrades, Chair lift, Signage
Health & Safety
Rehab of Existing Facility
Completed
2400-040-00-0436
Keansburg Borough
Port Monmouth Road School
Demolition, Roofing, Mechanical upgrades, Fire Alarm, Emergency Lighting, Power system upgrade Doors, Windows, Communications system, Vermin Remediation, Structural repairs, ADA Upgrades, Chair lift, Signage
Health & Safety
Rehab of Existing Facility
Completed
2400-050-00-0455
Keansburg Borough
Joseph C. Caruso E.S.
Demolition, Roofing, Mechanical upgrades, Fire Alarm, Emergency Lighting, Power system upgrade Doors, Windows, Communications system, Vermin Remediation, Structural repairs, ADA Upgrades, Chair lift, Signage
Health & Safety
Rehab of Existing Facility
Completed
2400-999-01-EA05
Keansburg Borough
Keansburg Multi-Facility/TCU
Delivery and Setup of TCU's for Early Childhood w/ Furniture within 300 Temporary Classroom Units
Multi-Facility/TCU
Temporary Classroom Unit
Completed
2400-e01-02-0116
Keansburg Borough
Joseph Caruso ECC
Demolish Joseph C Caruso ES to build new ECC pre K-2
School Facility Project
New Construction
Design
2400-S01-02-0567
Keansburg Borough
Lorraine Place ES (formerly New Beachway ES)
Construct new elementary school
School Facility Project
New Construction
Design
2770-050-00-0506
Long Branch
Long Branch H.S.
Replace roofing sys, rain conductors, flashing, asbestos roofing abatement. etube 2 boilers, 4 zone valves, install new zone valve control panel. replace/rebld HVAC equip with controls, repair elect feeds to mech equip & fire alarm repair.
Health & Safety
Rehab of Existing Facility
Completed
2770-060-00-0507
Long Branch
Long Branch M.S.
Replacement of existing roofing systems, rain conductors, flashing, asbestos roofing abatement. Replacement/rebuilding of existing HVAC equipment with controls, repair electrical feeds to mechanical equipment, and fire alarm repair.
Health & Safety
Rehab of Existing Facility
Completed
2770-065-00-0441
Long Branch
Morris Avenue School (aka A.A. Anastasia E.S.)
Repairs that include: replace doors, replace window/curtainwall, masonry restoration, new fire alarm, update emergency lighting, additional outlets, upgrade lighting, new PA system, replace unit ventilators and miscellaneous plumbing.
Health & Safety
Rehab of Existing Facility
Completed
2770-080-00-0438
Long Branch
Elberon E.S.
Repairs include: replace doors, window/curtainwall, masonry restoration, new fire alarm, update emergency lighting, additional outlets, upgrade lighting, new PA system, replace unit ventilators & miscellaneous plumbing. Roofing/Misc.
Health & Safety
Rehab of Existing Facility
Completed
2770-080-03-1043
Long Branch
Elberon E.S.
Addition & renovations to facility will total 100,000-s.f. & house 681 Pre-K thru 5 students and include 9 gen'l, 5 special ed, 4 K, and 5 PreK, cafetorium, stage, computer rm, gym, media ctr/ library, art & music rms.
School Facility Project
New Construction
Design
2770-090-00-0440
Long Branch
Audrey E.S.
Replacement of existing roofing systems. Window and door replacement, masonry repair, flashing and lintel repair, ACM abatement and encapsulation, mechanical repair, new fire alarm, new PAC system and lighting.
Health & Safety
Rehab of Existing Facility
Completed
2770-110-00-0439
Long Branch
Gregory E.S.
Replace roofing systems. Repairs include: replace doors, window/curtainwall, masonry restoration, new fire alarm, update emergency lighting, additional outlets, upgrade lighting, new PA system, replace unit ventilators & misc. plumbing.
Health & Safety
Rehab of Existing Facility
Completed
2770-110-02-0115
Long Branch
Gregory E.S.
The new 94,269 s.f. facility to house 550 Pre-K thru 5 students and include 33 classrms, cafetorium, stage, computer rm, gym, media ctr/library, art & music rms, & more.
School Facility Project
New Construction
Completed
2770-120-00-0437
Long Branch
Lenna W. Conrow E.S.
Replace roofing systems. Repairs include: replace doors, window/curtainwall, masonry restoration, new fire alarm, update emergency lighting, additional outlets, upgrade lighting, new PA system, replace unit ventilators & misc. plumbing.
Health & Safety
Rehab of Existing Facility
Completed
2770-150-00-0442
Long Branch
West End E.S.
Repairs include: replace doors, replace window/curtainwall, masonry restoration, new fire alarm, update emergency lighting, additional outlets, upgrade lighting, new PA system, replace unit ventilators & misc plumbing.
Health & Safety
Rehab of Existing Facility
Completed
2770-900-00-0443
Long Branch
Long Branch HS/Alternative HS
Asbestos abatement and refinish
Health & Safety
Rehab of Existing Facility
Completed
2770-x01-01-0522
Long Branch
New MS (-x01)
Replace Long Branch MS with new 247,000-s.f. MS to house 1100 students. It will contain a total of 68 classrms, media ctr, science labs, & geo-thermal heating/cooling sys and provide emergency services for the community.
School Facility Project
New Construction
Completed
2770-x02-01-0081
Long Branch
New Anastasia ES (-x02)
Replace Anastasia ES with new 94,000-s.f. ES to include 37 classrms, 6 SGI rms, gym, auditorium, kitchen, media ctr, & community health center. The 3-story facility will house approx 600 K-5 students.
School Facility Project
New Construction
Completed
2770-x03-01-0635
Long Branch
New H.S. (-x03)
Construct new 4-story 292,000-s.f. HS, housing 1200 students to include auditorium, 75 classrms, media ctr, gym, auxiliary gym and athletic fields.
School Facility Project
New Construction
Construction
3230-050-01-1013
Millville
Millville Senior H.S.
expanded cafeteria
Health & Safety
Rehab of Existing Facility
Completed
3230-050-02-0980
Millville
Millville Senior H.S.
A 62,000-s.f. addition and 20,000 s.f. renovations to included 13 new classrms, auxiliary gym, 6 new science labs, a media ctr, 10 SGI classrms, kitchen & cafeteria for 1500 students.
School Facility Project
Addition and Rehab of Existing Facility
Construction Bid
3230-060-00-0630
Millville
Memorial H.S.
electrical upgrades, improved lighting, a new fire alarm system, the replacement of exterior doors, and a curtain wall replacement.
Health & Safety
Rehab of Existing Facility
Completed
3230-065-00-0616
Millville
Bacon E.S.
replacement to the existing building’s roof
Health & Safety
Rehab of Existing Facility
Completed
3230-075-00-0572
Millville
Holly Heights E.S.
upgraded the school’s interior lights, exterior emergency and egress lighting system, and replaced the existing fire alarm/detection system.
Health & Safety
Rehab of Existing Facility
Completed
3230-077-00-0544
Millville
Lakeside M.S.
new roofing, boilers, windows and removal of asbestos.
Health & Safety
Rehab of Existing Facility
Completed
3230-077-01-0640
Millville
Lakeside M.S.
New auditorium and gymnasium
School Facility Project
Addition To Existing Facility
Completed
3230-080-00-0641
Millville
Mount Pleasant E.S.
replaced the existing roof, improved this school’s lighting and installed new fire alarms
Health & Safety
Rehab of Existing Facility
Completed
3230-085-00-0690
Millville
Rieck Avenue E.S.
installation of various electrical upgrades such as improved interior and exterior lighting and a new fire alarm system
Health & Safety
Rehab of Existing Facility
Completed
3230-090-00-0573
Millville
R.D. Wood E.S.
electrical upgrades, improved lighting, a new fire alarm system and a replacement of the existing doors
Health & Safety
Rehab of Existing Facility
Completed
3230-E01-01-0641
Millville
Millville Early Childhood Center (-E01)
New Early Childhood Center in an existing two-story AARP Insurance Co. office bldg 84,000 s.f. converted to 42 classrms, media ctr, activity rms, cafeteria/kitchen for 600 PreK students. Pre-development request for feasibility study.
School Facility Project
Rehab of Existing Facility
Completed
3510-050-01-1048
Neptune Township
Neptune Senior H.S.
Upgrade of fire alarm systems, exit and emergency lighting systems, door/hardware replacement.
Health & Safety
Rehab of Existing Facility
Completed
3510-050-02-0512
Neptune Township
Neptune Senior H.S.
Complete reno of existing 132,000 sf H.S. facility & a series of additions totaling 150,000 sf of new space which includes classrooms, science labs, auditorium, auxiliary gym & other misc spaces. H.S. Swing Space, asbestos abatement
School Facility Project
Addition and Rehab of Existing Facility
Construction
3510-055-00-0671
Neptune Township
Neptune M.S.
Upgrade of fire alarm systems, exit and emergency lighting systems, door/hardware replacement.
Health & Safety
Rehab of Existing Facility
Completed
3510-055-02-0182
Neptune Township
Neptune M.S.
Addition of three-story classroom wing that will house approximately 9 classrooms, 3 specl. Ed classrooms, and 3 science labs. Another 1 story addition with technology education and life science labs. Renos include expanding cafeteria.
School Facility Project
Addition and Rehab of Existing Facility
Completed
3510-061-00-0447
Neptune Township
Gables E.S.
Upgrade of fire alarm systems, exit and emergency lighting systems, door/hardware replacement.
Health & Safety
Rehab of Existing Facility
Completed
3510-061-02-0181
Neptune Township
Gables E.S.
Additions to include 3 - 1st grade classrooms, art and music classrooms, special ed classroom, computer classroom file space and a small group instruction room.
School Facility Project
Addition and Rehab of Existing Facility
Completed
3510-063-00-0483
Neptune Township
Green Grove E.S.
Upgrade of fire alarm systems, exit and emergency lighting systems, door/hardware replacement.
Health & Safety
Rehab of Existing Facility
Completed
3510-063-02-0178
Neptune Township
Green Grove E.S.
Addition of one-story gym wing with music room, art room and new cafeteria/kitchen facilities. Renovations include classroom conversions. 63 Classrooms
School Facility Project
Addition and Rehab of Existing Facility
Completed
3510-080-00-0446
Neptune Township
Ridge Avenue E.S.
Upgrade of fire alarm systems, exit and emergency lighting systems, door/hardware replacement.
Health & Safety
Rehab of Existing Facility
Completed
3510-090-00-0445
Neptune Township
Shark River Hills E.S.
Upgrade of fire alarm systems, exit and emergency lighting systems, door/hardware replacement.
Health & Safety
Rehab of Existing Facility
Completed
3510-090-02-0180
Neptune Township
Shark River Hills E.S.
A 9,685-s.f. addition to existing facility will contain 29 classrms, full-court gym & 8 instructional spaces for 375 K-5 students. Interior renovations: new ceilings & lighting, classrm ventilators & air-conditioning.
School Facility Project
Addition and Rehab of Existing Facility
Completed
3510-100-00-0602
Neptune Township
Summerfield E.S.
Upgrade of fire alarm systems, exit and emergency lighting systems, door/hardware replacement.
Health & Safety
Rehab of Existing Facility
Completed
3510-100-03-0837
Neptune Township
Summerfield E.S.
Replacement school will be a new 3-story 105,000-s.f. facility consisting of 34 classrms to house 550 PreK-5 students.
School Facility Project
New Construction
Completed
3510-999-01-EA14
Neptune Township
Neptune - TCU/Multi-facility -Memorial Drive
TCU AE Services - Temp DOE/EDA Project Added to System to Enable Packaging in advance of an EDA# accompanying DOE's 5/30/01 Letter
Multi-Facility/TCU
Temporary Classroom Unit
Completed
3510-N01-02-0177
Neptune Township
Midtown Community Elementary School
Construct new 3-story 145,200-sf. Community School to house 700 PreK-5 special ed & handicapped children and contain 38 classrms, an over-sized gym & cafeteria, rooftop outdoor science lab.
School Facility Project
New Construction
Construction
3510-S02-02-0831
Neptune Township
Neptune H.S. Annex (aka Bank Bldg-temp HS space)
Purchase/Lease of bank building across from existing HS to be used as HS swing space for project 3510-050-02-0512-00. After approx. 3 years as swing space in support of HS project, use may convert to another long term district function.
School Facility Project
Rehab of Existing Facility
Completed
3510-x01-01-0435
Neptune Township
New Neptune Early Childhood Center
Purchase and conversion of 30,000-s.f. existing bldg into Early Childhood Center for 270 PreK students and contains 18 classrooms, gym/cafeteria, media ctr, and computer lab.
School Facility Project
New Construction
Completed
3530-050-00-0481
New Brunswick
New Brunswick H.S.
Demolition of existing doors, frames, hardware, gypsum wallboard around the frames, windows and brick veneer. Installation of doors, frames, hardware, gypsum wallboard around the frames, windows and brick veneer.
Health & Safety
Rehab of Existing Facility
Completed
3530-060-01-1069
New Brunswick
A. Chester Redshaw E.S.
Boiler replacement & demolition of existing doors, frames, hardware, gypsum wallboard around the frames, windows and brick veneer. Installation of doors, frames, hardware, gypsum wallboard around the frames, windows and brick veneer.
Health & Safety
Rehab of Existing Facility
Completed
3530-060-03-1032
New Brunswick
A. Chester Redshaw E.S.
Replacement school
School Facility Project
New Construction
Construction Bid
3530-080-00-0649
New Brunswick
Lincoln E.S.
Demolition of existing doors, frames, hardware, gypsum wallboard around the frames, windows and brick veneer. Installation of doors, frames, hardware, gypsum wallboard around the frames, windows and brick veneer.
Health & Safety
Rehab of Existing Facility
Completed
3530-090-00-0647
New Brunswick
Livingston E.S.
Demolition of existing doors, frames, hardware, gypsum wallboard around the frames, windows and brick veneer. Installation of doors, frames, hardware, gypsum wallboard around the frames, windows and brick veneer.
Health & Safety
Rehab of Existing Facility
Completed
3530-110-00-0432
New Brunswick
McKinley Community E.S.
Demolition of existing doors, frames, hardware, gypsum wallboard around the frames, windows and brick veneer. Installation of doors, frames, hardware, gypsum wallboard around the frames, windows and brick veneer.
Health & Safety
Rehab of Existing Facility
Completed
3530-123-03-1034
New Brunswick
Paul Robeson Community E.S.
Addition and alterations to the existing school.
School Facility Project
Addition and Rehab of Existing Facility
Design
3530-125-00-0648
New Brunswick
Roosevelt E.S.
Demolition of existing doors, frames, hardware, gypsum wallboard around the frames, windows and brick veneer. Installation of doors, frames, hardware, gypsum wallboard around the frames, windows and brick veneer.
Health & Safety
Rehab of Existing Facility
Completed
3530-999-01-EA16
New Brunswick
New Brunswick Multi-Facility/TCU
TCU AE Services - Temp DOE/EDA Project Added to System to Enable Packaging in advance of an EDA# accompanying DOE's 5/30/01 Letter
Multi-Facility/TCU
Temporary Classroom Unit
Completed
3530-N00-04-00SN
New Brunswick
Temporary School
Temporary School to house students while construction takes place on/at various school sites in District
Other
Temporary Classroom Unit
Completed
3530-N01-03-0276
New Brunswick
K Center One
New K Center with Early Childhood Admin space
School Facility Project
New Construction
Design
3530-N03-03-0278
New Brunswick
McKinley K Center #3
New K Center - Construction of a new 35,000 sf kindergarten center including all associated site work .
School Facility Project
New Construction
Construction
3570-010-00-0686
Newark
Arts H.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-020-00-0654
Newark
Barringer H.S.
Life safety improvements and building envelope restoration. Window replacement work, including aluminum window removal and reinstallation of new units.
Health & Safety
Rehab of Existing Facility
Completed
3570-020-08-0FAW
Newark
Barringer H.S.
Investiagate cause and extent of sanitary storm system back-ups. Exterior Doors and Hardware Repair or Replacemen
School Facility Project
Rehab of Existing Facility
Design Bid
3570-030-01-1223
Newark
Central H.S.
Replacement of heating unit ventilators, exit & emergency lighting, stair enclosures, including doors & hardware, exterior masonry repair, miscellaneous interior finish work. Life safety improvements and building envelope restoration.
Health & Safety
Rehab of Existing Facility
Completed
3570-030-04-00AA
Newark
Central H.S.
Masonry repairs of parapet - Exterior masonry repair work, roofing work, upgrading of existing fire alarm system, misc mechanical work, stair enclosure replacement, including doors & hardware, misc interior finish work.
School Facility Project
Rehab of Existing Facility
Completed
3570-040-01-1275
Newark
East Side H.S.
Exterior masonry repair, roofing, upgrade fire alarm sys, misc mechanical work, replace stair enclosure, including doors & hardware, misc interior finish work. Window replacement, including aluminum window removal & reinstall new units.
Health & Safety
Rehab of Existing Facility
Completed
3570-040-08-0GAA
Newark
East Side H.S.
Evaluate condition of terra cotta cornice at rear of building and opposite the auditorium.
School Facility Project
Rehab of Existing Facility
PreDevelopment
3570-045-01-0817
Newark
Newark Vocational
Roof replacement -
Health & Safety
Rehab of Existing Facility
Completed
3570-050-01-1118
Newark
Malcolm X. Shabazz H.S.
Life safety and building envelope restoration. Replace heating unit ventilators, exit/emergency lighting, replace stair enclosures, doors & hardware, exterior masonry repair, misc interior finish work. Window replacement work
Health & Safety
Rehab of Existing Facility
Completed
3570-050-08-0GAI
Newark
Malcolm X. Shabazz H.S.
Evaluate condition of existing roof systems. Investigate source and extent of groundwater infiltrating lower levels of building.
School Facility Project
Rehab of Existing Facility
PreDevelopment
3570-055-01-1281
Newark
Science H.S.
Exterior masonry repair work, roofing work, upgrading of existing fire alarm system, miscellaneous mechanical work, stair enclosure replacement, including doors & hardware, miscellaneous interior finish work.
Health & Safety
Rehab of Existing Facility
Completed
3570-056-01-1103
Newark
Technology H.S.
Life safety improvements and building envelope restoration. Window replacement work, including aluminum window removal & reinstall new units.
Health & Safety
Rehab of Existing Facility
Completed
3570-057-01-1124
Newark
University H.S.
Life safety improvements and building envelope restoration.
Health & Safety
Rehab of Existing Facility
Completed
3570-070-01-1104
Newark
Weequahic H.S.
Replace heating unit ventilators, exit/emergency lighting, replace stair enclosures, doors & hardware, exterior masonry repair, misc interior finish work.
Health & Safety
Rehab of Existing Facility
Completed
3570-070-08-0GAM
Newark
Weequahic H.S.
Evaluate condition of Exterior Masonry (northwest end of building) and existing Roof System. Replace PA System.
School Facility Project
Rehab of Existing Facility
Design Bid
3570-080-00-0687
Newark
West Side H.S.
Life safety improvements and building envelope restoration.
Health & Safety
Rehab of Existing Facility
Completed
3570-080-02-0184
Newark
West Side H.S.
This project consists of an addition and a rehabiliation to the existing facility.
School Facility Project
Addition and Rehab of Existing Facility
Construction
3570-170-01-1270
Newark
Abington Ave. E.S.
Life safety improvements and building envelope restoration. Window replacement work, including aluminum window removal & reinstall new units.
Health & Safety
Rehab of Existing Facility
Completed
3570-180-01-1326
Newark
Alexander Street E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-200-01-1127
Newark
Ann Street E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-220-01-1274
Newark
Avon Avenue E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-220-04-00UE
Newark
Avon Avenue E.S.
Removal of existing stair treads and replacement with new, playground pavement repairs at damaged area and application of new pavement over the existing surface.
School Facility Project
Rehab of Existing Facility
Construction
3570-220-08-0FAV
Newark
Avon Avenue E.S.
Evaluate condition of existing roof systems (shingle roof in particular).
School Facility Project
Rehab of Existing Facility
Design Bid
3570-225-01-1220
Newark
Belmont-Runyon E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-230-01-1282
Newark
William H. Brown Academy
2nd transmittal addition: emergent repair to portions of the exterior masonry. It may be added to the Scope of Work #A01-1282-01-13-3570-230, or developed as a separate project. The original scope of work did not include any masonry work
Health & Safety
Rehab of Existing Facility
Completed
3570-230-04-00MR
Newark
William H. Brown Academy
This project consists of emergent repair to portions of the exterior masonry and additional health and safety work.
School Facility Project
Rehab of Existing Facility
Construction Bid
3570-230-08-0GAL
Newark
William H. Brown Academy
Evaluate condition of existing roof systems.
School Facility Project
Rehab of Existing Facility
PreDevelopment
3570-240-01-1221
Newark
Boylan Early Childhood Center
 
Health & Safety
Rehab of Existing Facility
Completed
3570-240-02-0965
Newark
Boylan Early Childhood Center
Request for funding of temporary boiler until unit is replaced
School Facility Project
Rehab of Existing Facility
Completed
3570-250-01-1222
Newark
Bragaw Avenue E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-250-08-0FAX
Newark
Bragaw Avenue E.S.
Investiagate condition of exiting parapet and exterior masonry.
School Facility Project
Rehab of Existing Facility
Design Bid
3570-270-01-1158
Newark
Branch Brook E.S.
Life safety improvements and building envelope restoration. Window replacement work, including aluminum window removal & reinstall new units.
Health & Safety
Rehab of Existing Facility
Completed
3570-270-04-000N
Newark
Branch Brook E.S.
Support of the deteriorating concrete floor slab
School Facility Project
Rehab of Existing Facility
Construction
3570-280-01-1102
Newark
Broadway E.S.
Life safety improvements and building envelope restoration. Window replacement work, including aluminum window removal & reinstall new units.
Health & Safety
Rehab of Existing Facility
Completed
3570-300-01-1159
Newark
Burnet Street E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-310-00-0663
Newark
Camden Street E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-315-00-0674
Newark
Camden M.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-330-01-1119
Newark
Chancellor Avenue E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-335-01-1120
Newark
Chancellor Avenue Annex E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-335-04-00UD
Newark
Chancellor Avenue Annex E.S.
Repairs to basement floors, basement storage rooms 1 & 2, gymnasium floor, playground, water pressure and boiler controls.
School Facility Project
Rehab of Existing Facility
Construction Bid
3570-350-01-1161
Newark
Cleveland E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-353-01-1100
Newark
Clinton Avenue E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-370-01-1125
Newark
Dayton Street E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-380-01-1162
Newark
Eighteenth Avenue E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-380-04-00AB
Newark
Eighteenth Avenue E.S.
Removal and replacement of existing heating oil tank.
School Facility Project
Rehab of Existing Facility
Completed
3570-390-01-1163
Newark
Elliott Street E.S.
Life safety improvements and building envelope restoration. Window replacement work, including aluminum window removal & reinstall new units.
Health & Safety
Rehab of Existing Facility
Completed
3570-390-04-00BJ
Newark
Elliott Street E.S.
Replacement of the existing facility on current site. There may be additional land needed for this project.
School Facility Project
New Construction
Design Build Bid
3570-390-04-00HU
Newark
Elliott Street E.S.
The District has indicated that there is an emergent condition concerning health and safety issues as indentified in the accompanying Scope of Work and cost estimate prepared for this facility. The SCC should verify this Scope of Work.
School Facility Project
Rehab of Existing Facility
Design
3570-400-01-1249
Newark
Fifteenth Avenue E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-410-01-1250
Newark
First Avenue E.S.
Life safety improvements and building envelope restoration. Window replacement work, including aluminum window removal & reinstall new units.
Health & Safety
Rehab of Existing Facility
Completed
3570-415-01-1175
Newark
Dr. E. Alma Flagg E.S.
Life safety improvements and building envelope restoration. Window replacement work, including aluminum window removal & reinstall new units.
Health & Safety
Rehab of Existing Facility
Completed
3570-420-01-1271
Newark
Fourteenth Avenue E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-430-01-1164
Newark
Franklin E.S.
Life safety improvements and building envelope restoration. Window replacement work, including aluminum window removal & reinstall new units.
Health & Safety
Rehab of Existing Facility
Completed
3570-430-04-00EE
Newark
Franklin E.S.
Rehab work including removal of underground storage tank, hvac work, boiler replacement, partial roof replacement, exterior door replacement .
School Facility Project
Rehab of Existing Facility
Construction
3570-435-01-1174
Newark
George Washington Carver E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-435-04-00TW
Newark
George Washington Carver E.S.
Replacement of entrance storefront system, sidelights and transoms, public address system, emergency lighting, strobe lighting, courtyard drainage and wall cracks.
School Facility Project
Rehab of Existing Facility
Construction
3570-437-01-0696
Newark
Gladys Hillman-Jones M.S.
New Addition (25K SF)
School Facility Project
Addition To Existing Facility
Design
3570-440-01-1283
Newark
Dr. William H. Horton E.S.
Life safety improvements and building envelope restoration. Window replacement work, including aluminum window removal & reinstall new units.
Health & Safety
Rehab of Existing Facility
Completed
3570-440-08-0GAB
Newark
Dr. William H. Horton E.S.
Evaluate condition of existing roof systems.
School Facility Project
Rehab of Existing Facility
Design Bid
3570-455-01-1284
Newark
Harriet Tubman E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-460-01-0767
Newark
Hawkins Street E.S.
 
Other
Temporary Classroom Unit
Completed
3570-460-01-1165
Newark
Hawkins Street E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-465-01-1128
Newark
Harold Wilson
 
Health & Safety
Rehab of Existing Facility
Completed
3570-470-01-1344
Newark
Hawthorne Avenue E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-477-01-1129
Newark
John F. Kennedy H.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-480-01-0766
Newark
Lafayette Street E.S.
 
Other
Temporary Classroom Unit
Completed
3570-480-01-1166
Newark
Lafayette Street E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-480-04-00UF
Newark
Lafayette Street E.S.
Masonry & Trim Repairs, repair and replace any roofing elements on the gymnasium roof, stair landing repairs, new radiator covers for radiator units.
School Facility Project
Rehab of Existing Facility
Construction
3570-490-01-1251
Newark
Lincoln E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-495-01-1101
Newark
Louise A. Spencer E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-500-01-1276
Newark
Madison E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-510-01-1224
Newark
Maple Avenue E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-510-04-00LB
Newark
Maple Avenue E.S.
Rehabilitation of basement area
School Facility Project
Rehab of Existing Facility
Construction
3570-511-01-1290
Newark
Maple Ave Annex
 
Health & Safety
Rehab of Existing Facility
Completed
3570-517-01-1169
Newark
Martin Luther King, Jr. E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-520-01-1252
Newark
McKinley E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-520-02-0646
Newark
McKinley E.S.
Replacement of window with Noise Abatement windows and installation of ventilation system
School Facility Project
Rehab of Existing Facility
Construction
3570-530-01-1253
Newark
Miller Street E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-530-04-00UC
Newark
Miller Street E.S.
Repairs include window replacement, playground & walkway surfacing, replacement of exterior doors & hardware, patching floors with finishes to match existing at sill replacement and patching jamebs with finishes to match.
School Facility Project
Rehab of Existing Facility
Pending
3570-540-01-1071
Newark
Montgomery Street H.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-540-02-1127
Newark
Montgomery Street H.S.
Repair of exterior masonry veneer. Repair was not required when H&S scope of work was drafted. Since that time, the exterior masonry has deteriorated to the point that this has become an emergent project.
School Facility Project
Rehab of Existing Facility
Completed
3570-560-01-1168
Newark
Morton Street E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-570-01-1225
Newark
Mt. Vernon E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-575-01-1173
Newark
Rafael Hernandez E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-580-01-1226
Newark
Newton Street E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-590-01-1227
Newark
Oliver Street E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-590-02-0315
Newark
Oliver Street E.S.
This project consists of the replacement of the existing school with a new 3-8grade school on a new site.
School Facility Project
New Construction
Design
3570-600-01-1272
Newark
Peshine Avenue E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-600-02-0963
Newark
Peshine Avenue E.S.
The District is requesting that the EDA undertake the continued funding of the temporary boiler or propare a feasibility study to determine the most cost effective method of maintaining heat in this facility until the boiler is replaced
School Facility Project
Rehab of Existing Facility
Completed
3570-605-01-1057
Newark
Quitman Street E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-610-01-1230
Newark
Ridge Street E.S.
Life safety improvements and building envelope restoration. Window replacement work, including aluminum window removal & reinstall new units.
Health & Safety
Rehab of Existing Facility
Completed
3570-615-01-0768
Newark
Roberto Clemente E.S.
TCU site approval letter
Other
Temporary Classroom Unit
Completed
3570-615-01-1232
Newark
Roberto Clemente E.S.
Life safety improvements and building envelope restoration. Window replacement work, including aluminum window removal & reinstall new units.
Health & Safety
Rehab of Existing Facility
Completed
3570-615-08-0GAH
Newark
Roberto Clemente E.S.
Evaluate condition of existing roof systems.
School Facility Project
Rehab of Existing Facility
Design Bid
3570-630-01-1228
Newark
Roseville Avenue E.S.
Life safety improvements and building envelope restoration. Window replacement work, including aluminum window removal & reinstall new units.
Health & Safety
Rehab of Existing Facility
Completed
3570-630-03-0832
Newark
Roseville Avenue E.S.
To determine the most cost-effective way of maintaining heat in the facility until it is closed
School Facility Project
Rehab of Existing Facility
Completed
3570-635-01-1172
Newark
Samuel L. Berliner
 
Health & Safety
Rehab of Existing Facility
Completed
3570-640-01-1229
Newark
South Street E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-640-02-0311
Newark
South Street E.S.
Replacement of the existing school with a new school on a new site
School Facility Project
New Construction
Design
3570-640-08-0GAJ
Newark
South Street E.S.
Evaluate condition of existing Exterior Masonry and Roofing.
School Facility Project
Rehab of Existing Facility
PreDevelopment
3570-670-01-1273
Newark
South Seventeenth Street E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-690-01-1254
Newark
Speedway Avenue E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-690-02-0964
Newark
Speedway Avenue E.S.
Request for funding of a temporary boiler until unit is replaced
School Facility Project
Rehab of Existing Facility
Completed
3570-690-08-0GAK
Newark
Speedway Avenue E.S.
Evaluate condition and performance of emergency generator.
School Facility Project
Rehab of Existing Facility
Design Bid
3570-710-01-1285
Newark
Sussex Avenue E.S.
Life safety improvements and building envelope restoration. Window replacement work, including aluminum window removal & reinstall new units.
Health & Safety
Rehab of Existing Facility
Completed
3570-710-04-0AAK
Newark
Sussex Avenue E.S.
Radiator covers, roof replacement and magnetic door holders.
School Facility Project
Rehab of Existing Facility
Construction
3570-715-01-1058
Newark
Thirteenth Avenue E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-715-04-00TZ
Newark
Thirteenth Avenue E.S.
Building is in need of renovation; boilers or associated equipment, limit stops on windows, bathrooms and fixtures.
School Facility Project
Rehab of Existing Facility
Construction
3570-718-01-1126
Newark
Vailsburg M.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-718-04-00MP
Newark
Vailsburg M.S.
This project consists of emergent repair to portions of the exterior masonry and additional health and safety work.
School Facility Project
Rehab of Existing Facility
Construction
3570-720-01-1287
Newark
Warren Street E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-720-08-0GAO
Newark
Warren Street E.S.
Exterior Masonry. Exterior Doors and Hardware Repair or Replacement.
School Facility Project
Rehab of Existing Facility
Design Bid
3570-750-01-1288
Newark
Wilson Avenue E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3570-911-01-1167
Newark
Lafayette Annex
 
Health & Safety
Rehab of Existing Facility
Completed
3570-913-01-1231
Newark
Ridge St Annex
 
Health & Safety
Rehab of Existing Facility
Completed
3570-914-01-1286
Newark
Sussex Ave Annex School
Life safety improvements and building envelope restoration. Window replacement work, including aluminum window removal & reinstall new units.
Health & Safety
Rehab of Existing Facility
Completed
3570-915-01-1289
Newark
Wilson Ave Annex
Health and Safety rehab including door/hardware replacement, exterior wall repair, roofing and plumbing
Health & Safety
Rehab of Existing Facility
Completed
3570-918-01-1277
Newark
Ridge St Early Childhood
Life safety improvements and building envelope restoration. Window replacement work, including aluminum window removal & reinstall new units.
Health & Safety
Rehab of Existing Facility
Completed
3570-x01-01-0617
Newark
New Science Park HS
New 1200 student HS (225K SF)
School Facility Project
New Construction
Completed
3570-x02-01-0618
Newark
First Avenue Elementary School (new)
New 850 student ES replace existing (100K SF)
School Facility Project
New Construction
Construction
3570-x03-01-0665
Newark
New Central High School (#x3)
New 1200 student HS to replace existing (270K SF)
School Facility Project
New Construction
Construction
3570-x07-01-0693
Newark
Speedway Ave. ES Replacement
New 400 student ES (82K SF)
School Facility Project
New Construction
Construction
3570-x10-01-0697
Newark
Park School
New 600 student ES (105K SF)
School Facility Project
New Construction
Construction
3880-050-00-0576
City Of Orange Township
Orange H.S.
Replace existing roof sys, rain conductors, flashing, security gate, retaining wall, windows. Repair ext masonry, ext egress stair mods, var HVAC elements, elect light & wiring upgrades, fire alarm & ACM removal.
Health & Safety
Rehab of Existing Facility
Completed
3880-060-00-0659
City Of Orange Township
Central E.S.
Replacement of existing roofing systems, rain conductors, flashing
Health & Safety
Rehab of Existing Facility
Completed
3880-070-00-0682
City Of Orange Township
Cleveland Street E.S.
Interior & exterior doors, environmental work, classroom lighting replacement, install new battery 2-head emergency lighting units, and add additional duplex convenience outlets, rehabilitation of boiler.
Health & Safety
Rehab of Existing Facility
Completed
3880-070-01-0969
City Of Orange Township
Cleveland Street E.S.
Addition of 29,725 gsf to Cleveland E.S. on existing site to house a gymnasium, cafeteria, media ctr, support offices and 8 additional classrms. 346 students
School Facility Project
Addition and Rehab of Existing Facility
Design
3880-090-01-1056
City Of Orange Township
Heywood Avenue E.S.
On October 1, 2001 the DOE transmitted a project descripton and construction documents for the replacement of the gymnasium windows. The DOE is now transmitting the Final Project Report and Final Eligible Cost letters.
Health & Safety
Rehab of Existing Facility
Completed
3880-100-01-0968
City Of Orange Township
Lincoln Avenue E.S.
Addition of 28,200-s.f. to Lincoln Avenue E.S. on existing site. Adjacent property to be acquired to house a gymnasium, cafeteria, media ctr, admin. office and 8 additional. 711 students
School Facility Project
Addition and Rehab of Existing Facility
Construction
3880-100-01-1035
City Of Orange Township
Lincoln Avenue E.S.
Replace existing roofing sys & windows, rain conductors, flashing, site improvements, masonry, door & hardware, HVAC/boilers, electrical wiring, emergency exit lighting, fire alarm work.
Health & Safety
Rehab of Existing Facility
Completed
3880-115-00-0660
City Of Orange Township
Orange M.S.
Exterior masonry repair, window replacement, exterior metal egress stair replacement, new stair towers, various HVAC elements, electric light and wiring upgrades fire alarm work and ACM removal.
Health & Safety
Rehab of Existing Facility
Completed
3880-120-00-0564
City Of Orange Township
Park Avenue E.S.
Replace existing roof sys, rain conductors, flashing, boiler, interior & exterior doors, basement eval, environmental work, electric light & wiring, upgrade fire alarm sys.
Health & Safety
Rehab of Existing Facility
Completed
3880-120-01-0967
City Of Orange Township
Park Avenue E.S.
Addition of 31,900-s.f. to Park Avenue E.S. consisting of a gymnasium, cafeteria, media ctr, admin. office and 8 additional classrms. 310 students
School Facility Project
Addition and Rehab of Existing Facility
Construction
3880-N01-02-0049
City Of Orange Township
New Main Street E.S.
Proposed Elementary school on District owned property.
School Facility Project
New Construction
Completed
3970-050-00-0620
Passaic City
Passaic H.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3970-080-00-0618
Passaic City
Number 1, Thomas Jefferson E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3970-080-01-0754
Passaic City
Number 1, Thomas Jefferson E.S.
 
Other
Temporary Classroom Unit
Completed
3970-090-00-0112
Passaic City
Number 3, Mario J Drago
Addition of 25 Pre-K classrooms and specialized instructional space. Various classroom conversions.
School Facility Project
Addition and Rehab of Existing Facility
Completed
3970-090-00-0517
Passaic City
Number 3, Mario J Drago
 
Health & Safety
Rehab of Existing Facility
Completed
3970-095-00-0617
Passaic City
Number 4, Lincoln E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3970-100-00-0113
Passaic City
Number 6, Martin Luther King, Jr.
Addition of 23 pre-K classrooms and administrative space. Renovations include classroom conversions.
School Facility Project
Addition and Rehab of Existing Facility
Completed
3970-100-00-0520
Passaic City
Number 6, Martin Luther King, Jr.
 
Health & Safety
Rehab of Existing Facility
Completed
3970-110-00-0114
Passaic City
Number 7, Grant E.S.
Addition of 8 pre-K classrooms as well as gymnasium and cafeteria facility. Various classroom conversions
School Facility Project
Addition and Rehab of Existing Facility
Completed
3970-110-00-0518
Passaic City
Number 7, Grant E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3970-120-01-0755
Passaic City
Number 8, Pulaski E.S.
 
Other
Temporary Classroom Unit
Completed
3970-125-00-0519
Passaic City
Etta Gero No 9 E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3970-125-01-0756
Passaic City
Etta Gero No 9 E.S.
 
Other
Temporary Classroom Unit
Completed
3970-130-00-0521
Passaic City
Number 10, Roosevelt E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3970-130-01-0758
Passaic City
Number 10, Roosevelt E.S.
 
Other
Temporary Classroom Unit
Completed
3970-140-00-0619
Passaic City
Number 11, Memorial E.S.
 
Health & Safety
Rehab of Existing Facility
Completed
3970-140-08-0GAY
Passaic City
Number 11, Memorial E.S.
Roofing
School Facility Project
Rehab of Existing Facility
PreDevelopment
3970-999-01-0757
Passaic City
Passaic City Multi-Facility/TCU
 
Multi-Facility/TCU
Temporary Classroom Unit
Completed
3970-N03-03-0097
Passaic City
New ES at Main Ave Site
To acquire a site, located at Highland Ave and Main Ave, for the construction of a new ES
School Facility Project
New Construction
Construction
3970-N06-03-0302
Passaic City
New ES-Dayton Ave (formerly First Street)
To construct a new Elementary School at Dayton Ave (formerly First Street) Site.
School Facility Project
New Construction
Design
3970-N10-05-0DAZ
Passaic City
ECC at Dayton Ave
Design & construction of new Early Childhood Center with 7 Pre-K classrooms and 8 Kindergarten classrooms.
School Facility Project
New Construction
PreDevelopment
3970-N11-07-0DAY
Passaic City
ECC Leonard Place & Madison St
Acquire land, design and construct new Early Childhood Center and central offices for the Board of Education including parking and playground facilities.
School Facility Project
New Construction
Design Bid
3970-x01-01-x760
Passaic City
New ES at Henry St. (-x01)
New ES (102.9K SF) and space for TCU's
School Facility Project
New Construction
Construction Bid
3970-x03-01-0776
Passaic City
New Middle School (Beth Israel site)
New MS (117.9K SF)
School Facility Project
Addition and Rehab of Existing Facility
Design
#Rows On Page: 501
 
 
 
 
 
 
#Rows On Report: 658
 
 
 
 
 
 