Page: 1 2 3 4 5 6 7 8 
Regular Operating District Grant Projects
0010-050-02-0870
Absecon City
Emma C. Attales E.S.
Replace classroom doors in the 1958 section and two pairs of egress doors in the gym
School Facility Project
Rehab of Existing Facility
Completed
$17,450.00
$17,450.00
$6,980.00
$10,470.00
0010-050-02-1166
Absecon City
Emma C. Attales E.S.
Rehab including: upgrades to access drive, curbs and sidewalks, new lockers, bleachers & divider curtain in gym, replace roof, new HVAC system, toilet room upgrades, new security, data-ports, telephone & fire alarm systems
School Facility Project
Rehab of Existing Facility
Completed
$2,050,766.46
$1,852,559.00
$741,024.00
$1,309,742.46
0010-060-02-0869
Absecon City
H. Ashton Marsh E.S.
Replace toilet partitions with phenolic compartments
School Facility Project
Rehab of Existing Facility
Completed
$12,600.00
$12,600.00
$5,040.00
$7,560.00
0010-060-02-1167
Absecon City
H. Ashton Marsh E.S.
Rehab including: Playground upgrades, new wood floor in gym, replace roof, new floor finishes in classrooms & corridor, new HVAC system, electrical upgrades, new security, data-ports, telephone & fire systems.
School Facility Project
Rehab of Existing Facility
Completed
$1,766,739.81
$1,766,739.81
$706,695.92
$1,060,043.89
0010-060-09-0jal
Absecon City
H. Ashton Marsh E.S.
Replacement/upgrade of all heat pumps
School Facility Project
Rehab of Existing Facility
Completed
$1,236,044.00
$1,236,044.00
$494,417.60
$741,626.40
0020-005-01-0532
Alexandria Township
Alexandria M.S.
Addition of Classrooms, SGI, Tech lab, science lab; Renovation of office space and storage space into core spaces
School Facility Project
Addition and Rehab of Existing Facility
Completed
$6,541,000.00
$3,964,971.00
$1,585,988.00
$4,955,012.00
0020-010-03-0825
Alexandria Township
Lester D. Wilson E.S.
Asbestos abatement, ceiling replacement, and asbestos flooring replacement.
School Facility Project
Rehab of Existing Facility
Completed
$80,579.25
$80,579.25
$32,231.70
$48,347.55
0020-010-03-0826
Alexandria Township
Lester D. Wilson E.S.
Replacement of fire alarm for the entire building.
School Facility Project
Rehab of Existing Facility
Completed
$74,511.72
$74,511.72
$29,804.69
$44,707.03
0020-010-09-0OAV
Alexandria Township
Lester D. Wilson E.S.
Relocate main office and entrance of school to allow for a more controlled and secure entry point.
School Facility Project
Rehab of Existing Facility
Offered
$295,443.00
$295,443.00
$118,177.20
$177,265.80
0030-010-03-0780
Allamuchy Township
Allamuchy Township E.S.
1. 5120 SF Roof Replacement
School Facility Project
Rehab of Existing Facility
Completed
$59,247.00
$59,247.00
$23,698.80
$35,548.20
0030-010-05-0AEE
Allamuchy Township
Allamuchy Township E.S.
Roof Replacement
School Facility Project
Rehab of Existing Facility
Completed
$196,700.00
$196,700.00
$78,680.00
$118,020.00
0040-010-00-0014
Allendale
Brookside E.S.
Addition(s) to Brookside School and conversion of media center, music/art/home ec room
Retro
Addition To Existing Facility
Completed
$4,595,767.53
$4,215,048.00
$1,686,019.20
$2,909,748.33
0040-010-09-0JAU
Allendale
Brookside E.S.
Replacement of unit ventilators and associated equipment.
School Facility Project
Rehab of Existing Facility
Completed
$175,249.77
$175,249.77
$70,099.91
$105,149.86
0040-020-00-0013
Allendale
Hillside E.S.
New 14,400-s.f. Construction - multipurpose room & music room. Rehab/Convert - 2 classrooms & 2 kindergartens.
Retro
Addition and Rehab of Existing Facility
Completed
$3,758,032.98
$2,339,700.00
$935,880.00
$2,822,152.98
0060-020-04-0AEW
Alloway Township
Alloway Twp. E.S.
State Share Grant Request for a new addition and rehabilitation.
School Facility Project
Rehab of Existing Facility
Completed
$5,591,813.80
$5,235,679.00
$2,667,720.00
$2,924,093.80
0070-010-02-0707
Alpha
Alpha E.S.
Re-roofing - 1917 building section
School Facility Project
Rehab of Existing Facility
Executed
$37,950.00
$37,950.00
$18,175.36
$19,774.64
0070-010-03-0817
Alpha
Alpha E.S.
Exterior door replacement
School Facility Project
Rehab of Existing Facility
Completed
$56,340.00
$45,106.00
$23,076.00
$33,264.00
0070-010-09-0ZJQ
Alpha
Alpha E.S.
Replace curtainwall; Window lintel and sill repairs; Masonry repairs at roof chimney; Roof copine repairs; Replace stair tower doors with rated doors.
School Facility Project
Rehab of Existing Facility
Completed
$390,365.40
$390,365.40
$176,267.54
$214,097.86
0080-010-02-1052
Alpine
Alpine Public E.S.
HVAC System Upgrade
School Facility Project
Rehab of Existing Facility
Completed
$524,701.00
$432,210.00
$172,884.00
$351,817.00
0080-010-02-1098
Alpine
Alpine Public E.S.
Classroom floor tile abatement and replacement
School Facility Project
Rehab of Existing Facility
Completed
$50,760.00
$50,760.00
$20,304.00
$30,456.00
0080-010-03-1092
Alpine
Alpine Public E.S.
Classroom Floor Tile Abatement. Classroom Floor Tile Replacement.
School Facility Project
Rehab of Existing Facility
Executed
$64,500.00
$64,500.00
$25,800.00
$38,700.00
0080-010-09-0ZAC
Alpine
Alpine Public E.S.
Replace classroom unit ventilators/perimeter casework; Electrical upgrades.
School Facility Project
Rehab of Existing Facility
Completed
$460,451.00
$460,451.00
$184,180.00
$276,271.00
0090-010-04-0AKR
Andover Regional
Florence M. Burd E.S.
Addition and Rehabilitation
School Facility Project
Addition and Rehab of Existing Facility
Executed
$7,669,866.31
$6,405,663.00
$2,562,265.00
$5,107,601.31
0090-010-09-0ZYM
Andover Regional
Florence M. Burd E.S.
New gym lighting.
School Facility Project
Rehab of Existing Facility
Executed
$30,209.00
$30,209.00
$12,084.00
$18,125.00
0090-040-04-0AEX
Andover Regional
Long Pond M.S.
Rehabilitation
School Facility Project
Rehab of Existing Facility
Executed
$368,897.05
$347,390.00
$138,956.00
$229,941.05
0090-040-09-0ZYN
Andover Regional
Long Pond M.S.
New gym lighting.
School Facility Project
Rehab of Existing Facility
Executed
$27,500.00
$27,500.00
$11,000.00
$16,500.00
0100-040-10-00CE
Asbury Park
Bradley Elementary School
Replace 4 rooftop HVAC units enclosed in windbreak area. Units have exceeded the useful life span and replace immediate damaged roof area.
Emergent
Rehab of Existing Facility
Executed
$244,900.00
$244,900.00
$244,900.00
$0.00
0100-070-10-00CF
Asbury Park
Asbury Middle School
Replace existing antiquated leaking roof system over kitchen, cafeteria area.
Emergent
Rehab of Existing Facility
Executed
$381,381.00
$381,381.00
$381,381.00
$0.00
0110-010-04-0AAY
Atlantic City
Atlantic City H.S.
Pre-Development request for Chiller replacement, Boiler replacement and air conditioning projects for the existing High School.
Emergent
Rehab of Existing Facility
Completed
$0.00
$0.00
$0.00
$0.00
0110-050-04-0AAZ
Atlantic City
Chelsea Heights E.S.
Pre-Development request for a Fire Alarm and Detection System.
Emergent
Rehab of Existing Facility
Completed
$103,978.00
$103,978.00
$41,591.20
$62,386.80
0110-N01-00-0067
Atlantic City
Sovereign Avenue School
New Sovereign Avenue School
School Facility Project
New Construction
Completed
$21,644,820.00
$13,705,332.00
$5,482,133.00
$16,162,687.00
0125-N01-99-0489
Atlantic Cty Spec Serv Sch Dist
New Special Services School
The 177,000 sf facility will replace existing special services facility and will include multi-purpose room, a gymnasium, time-out rooms, and changing rooms. It will also provide job-training opportunities in the restaurant.
Retro
Addition and Rehab of Existing Facility
Completed
$24,426,000.00
$24,426,000.00
$9,770,400.00
$14,655,600.00
0130-020-02-1112
Atlantic Highlands
Atlantic Highlands E.S.
Addition of computer and science classrooms, cafeteria/multi-purpose room, etc. Renovations to kindergarten classroom, pre-K classroom, Music/band classroom, OT/PT classroom, small group rooms and admin spaces
School Facility Project
Addition and Rehab of Existing Facility
Completed
$6,291,102.02
$5,207,826.00
$2,083,130.00
$4,207,972.02
0150-010-02-1042
Audubon
Audubon H.S.
Boiler and partial roof replacement
School Facility Project
Rehab of Existing Facility
Completed
$135,816.50
$135,816.50
$64,664.95
$71,151.55
0150-010-04-00BS
Audubon
Audubon H.S.
Additions and renovations to existing facility
School Facility Project
Addition and Rehab of Existing Facility
Executed
$13,834,664.50
$12,067,657.00
$5,681,740.00
$8,152,924.50
0150-010-04-00LD
Audubon
Audubon H.S.
The district is removing and replacing asbestos containing ceiling tiles in 25000sf of space in the jr./sr. high school.
Emergent
Rehab of Existing Facility
Completed
$278,987.50
$278,987.50
$131,354.01
$147,633.49
0150-040-04-00BR
Audubon
Haviland Avenue E.S.
Additions and renovations to existing facility
School Facility Project
Addition and Rehab of Existing Facility
Executed
$1,765,530.00
$1,575,132.00
$741,610.00
$1,023,920.00
0150-050-04-00BQ
Audubon
Mansion Avenue E.S.
Additions and renovations to existing facility
School Facility Project
Addition and Rehab of Existing Facility
Executed
$2,091,164.03
$2,091,164.03
$984,570.21
$1,106,593.82
0170-010-02-0735
Avalon
Avalon E.S.
Addition including art and music rooms, library media center, health suite, admin suite, science greenhouse, kitchen receiving/storage and gymnasium
School Facility Project
Addition and Rehab of Existing Facility
Completed
$7,308,796.73
$4,030,178.00
$1,612,071.00
$5,696,725.73
0180-010-02-0473
Avon Borough
Avon E.S.
fire alarm system upgrade
Emergent
Rehab of Existing Facility
Completed
$15,638.00
$15,638.00
$6,255.00
$9,383.00
0185-010-02-0660
Barnegat Township
Lillian M. Dunfee E.S.
Renovation of Field #1
School Facility Project
Rehab of Existing Facility
Executed
$88,143.48
$88,143.48
$60,955.98
$27,187.50
0185-010-02-0661
Barnegat Township
Lillian M. Dunfee E.S.
Rehabilitation of Field #2
School Facility Project
Rehab of Existing Facility
Executed
$68,128.62
$68,128.62
$47,114.62
$21,014.00
0185-010-02-0662
Barnegat Township
Lillian M. Dunfee E.S.
Heating and ventilation project
School Facility Project
Rehab of Existing Facility
Executed
$494,107.75
$494,107.75
$341,702.19
$152,405.56
0185-010-02-0663
Barnegat Township
Lillian M. Dunfee E.S.
Carpet replacement
School Facility Project
Rehab of Existing Facility
Executed
$27,852.99
$27,852.99
$19,261.85
$8,591.14
0185-010-02-1092
Barnegat Township
Lillian M. Dunfee E.S.
Replacement of existing exterior doors and frames
School Facility Project
Rehab of Existing Facility
Executed
$57,980.00
$57,980.00
$40,096.30
$17,883.70
0185-010-09-0ZWD
Barnegat Township
Lillian M. Dunfee E.S.
New gym lighting and controls.
School Facility Project
Rehab of Existing Facility
Offered
$23,183.00
$23,183.00
$10,192.00
$12,991.00
0185-015-02-0640
Barnegat Township
Cecil S. Collins E.S.
Improvement tp Physical Education Facilities Field #2
School Facility Project
Rehab of Existing Facility
Executed
$166,801.00
$166,801.00
$115,351.90
$51,449.10
0185-015-02-0657
Barnegat Township
Cecil S. Collins E.S.
Renovation of Phys Ed Field #1
School Facility Project
Rehab of Existing Facility
Executed
$96,252.00
$96,252.00
$66,563.46
$29,688.54
0185-015-02-0658
Barnegat Township
Cecil S. Collins E.S.
Heating and ventilation
School Facility Project
Rehab of Existing Facility
Executed
$634,541.33
$634,541.33
$438,819.59
$195,721.74
0185-015-02-0659
Barnegat Township
Cecil S. Collins E.S.
Carpet replacment
School Facility Project
Rehab of Existing Facility
Executed
$38,100.94
$38,100.94
$26,348.86
$11,752.08
0185-015-02-0956
Barnegat Township
Cecil S. Collins E.S.
addition of new district board office to the Collins ES
School Facility Project
Rehab of Existing Facility
Executed
$568,244.99
$568,244.99
$392,972.10
$175,272.89
0185-015-09-0ZWE
Barnegat Township
Cecil S. Collins E.S.
New gym lighting and controls.
School Facility Project
Rehab of Existing Facility
Offered
$18,826.00
$18,826.00
$8,276.00
$10,550.00
0185-020-02-0664
Barnegat Township
Elizabeth V. Edwards E.S.
Carpet replacement
School Facility Project
Rehab of Existing Facility
Executed
$8,080.25
$8,080.25
$5,587.93
$2,492.32
0185-030-09-0ZWF
Barnegat Township
Barnegat H.S.
New gym lighting and controls.
School Facility Project
Rehab of Existing Facility
Offered
$95,802.00
$95,802.00
$42,117.00
$53,685.00
0185-050-02-0641
Barnegat Township
Russell O. Brackman M.S.
Improvments to Phys Ed facilities filed #1
School Facility Project
Rehab of Existing Facility
Executed
$114,229.20
$114,229.20
$78,995.66
$35,233.54
0185-050-02-0642
Barnegat Township
Russell O. Brackman M.S.
Improvement to Phs Ed facilities Field #2
School Facility Project
Rehab of Existing Facility
Executed
$135,644.58
$135,644.58
$93,805.55
$41,839.03
0185-050-02-0652
Barnegat Township
Russell O. Brackman M.S.
H&V core area heat pump replacment
School Facility Project
Rehab of Existing Facility
Executed
$526,857.90
$526,857.90
$364,350.70
$162,507.21
0185-050-02-0653
Barnegat Township
Russell O. Brackman M.S.
Fresh air system
School Facility Project
Rehab of Existing Facility
Executed
$548,606.00
$548,606.00
$379,390.67
$169,215.33
0185-050-02-0654
Barnegat Township
Russell O. Brackman M.S.
heat and vent pump replacement
School Facility Project
Rehab of Existing Facility
Executed
$543,780.00
$543,780.00
$376,053.24
$167,726.76
0185-050-02-0655
Barnegat Township
Russell O. Brackman M.S.
Partial roof replacement
School Facility Project
Rehab of Existing Facility
Executed
$140,300.01
$140,300.01
$97,025.03
$43,274.98
0185-050-02-0656
Barnegat Township
Russell O. Brackman M.S.
Carpet replacement
School Facility Project
Rehab of Existing Facility
Executed
$53,437.81
$53,437.81
$36,955.13
$16,482.68
0185-050-02-1066
Barnegat Township
Russell O. Brackman M.S.
conversion of woodshop to special education classrooms
School Facility Project
Rehab of Existing Facility
Executed
$376,215.84
$376,215.84
$260,173.57
$116,042.27
0185-050-09-0ZWG
Barnegat Township
Russell O. Brackman M.S.
New gym lighting and controls.
School Facility Project
Rehab of Existing Facility
Offered
$52,801.00
$52,801.00
$23,212.00
$29,589.00
0185-070-09-0ZWH
Barnegat Township
Horbelt ES
New gym lighting and controls.
School Facility Project
Rehab of Existing Facility
Offered
$23,862.00
$23,862.00
$10,490.00
$13,372.00
0185-080-09-0ZWI
Barnegat Township
Joseph T. Donahue E.S.
New gym lighting and controls.
School Facility Project
Rehab of Existing Facility
Offered
$16,790.00
$16,790.00
$7,381.00
$9,409.00
0190-010-04-00AP
Barrington Borough
Avon E.S.
Addition of classrooms
School Facility Project
Addition and Rehab of Existing Facility
Executed
$6,357,339.00
$4,983,894.00
$1,993,558.00
$4,363,781.00
0190-010-09-0ZDL
Barrington Borough
Avon E.S.
Site drainage - remediate mold growth in crawl space.
School Facility Project
Rehab of Existing Facility
Executed
$38,755.00
$38,755.00
$15,502.00
$23,253.00
0190-030-04-00AQ
Barrington Borough
Woodland E.S.
A 3,448 gsf Addition of 2 new classrooms and new Teacher's Workroom. Project includes renovation as well.
School Facility Project
Addition and Rehab of Existing Facility
Executed
$2,865,947.66
$2,597,408.36
$1,038,963.35
$1,826,984.31
0190-030-09-0ZDM
Barrington Borough
Woodland E.S.
Roof and boiler replacement.
School Facility Project
Rehab of Existing Facility
Executed
$737,034.00
$737,034.00
$294,814.00
$442,220.00
0210-020-02-0549
Bay Head
Bay Head E.S.
Renovation of Boys/Girls toilet rooms; New electric service throughout the school; New branch circuits throughout the school
School Facility Project
Rehab of Existing Facility
Executed
$226,237.00
$226,237.00
$90,495.00
$135,742.00
0220-020-04-00IJ
Bayonne
Bayonne H.S.
General capital improvements including : electrical, architectural, mechanical, plumbing, building energy.
School Facility Project
Rehab of Existing Facility
Executed
$10,907,451.66
$10,907,451.66
$4,362,980.66
$6,544,471.00
0220-020-09-0OAK
Bayonne
Bayonne H.S.
ADA restroom upgrades; asbestos abatement & montoring; HVAC upgrades; lintel replacement & masonry repair; replace fire doors; replace main steam line valves; install ADA compliant doors
School Facility Project
Rehab of Existing Facility
Executed
$2,226,035.00
$2,226,035.00
$1,251,815.23
$974,219.77
0220-030-04-0AEY
Bayonne
Number 3, Walter F. Robinson E.S.
Addition and capital improvements to the existing facility including architectural, site, mechanical, electrical, plumbing, life safety, and building systems.
School Facility Project
Rehab of Existing Facility
Executed
$12,743,046.00
$8,785,245.00
$3,514,098.00
$9,228,948.00
0220-030-09-0OAL
Bayonne
Number 3, Walter F. Robinson E.S.
Lintel replacment & masonry repair; ADA restroom upgrades
School Facility Project
Rehab of Existing Facility
Executed
$1,080,750.00
$1,080,750.00
$607,761.92
$472,988.08
0220-040-04-00IK
Bayonne
Number 12, John M. Bailey E.S.
General capital improvements including : electrical, mechanical,plumbing, building energy.
School Facility Project
Rehab of Existing Facility
Executed
$920,474.00
$920,474.00
$368,190.00
$552,284.00
0220-040-09-0OAM
Bayonne
Number 12, John M. Bailey E.S.
Lintel replacement & mansonry repair
School Facility Project
Rehab of Existing Facility
Executed
$597,000.00
$597,000.00
$335,724.14
$261,275.86
0220-040-97-0328
Bayonne
Number 12, John M. Bailey E.S.
 
Retro
Addition and Rehab of Existing Facility
Completed
$1,576,412.84
$1,576,412.84
$630,565.14
$945,847.70
0220-050-04-00IL
Bayonne
Henry E. Harris No. 1 E.S.
General capital improvement to school # 1 including masonry, site, finishes, architectural, mechanical, electrical, plumbing, building performance and energy.
School Facility Project
Rehab of Existing Facility
Executed
$1,775,702.00
$1,775,702.00
$710,281.00
$1,065,421.00
0220-050-09-0OAN
Bayonne
Henry E. Harris No. 1 E.S.
Asbestos abatement and monitoring, lintel replacement and masonry repair
School Facility Project
Rehab of Existing Facility
Executed
$638,125.00
$638,125.00
$358,850.87
$279,274.13
0220-050-97-0375
Bayonne
Henry E. Harris No. 1 E.S.
 
Retro
Addition and Rehab of Existing Facility
Executed
$1,762,348.71
$0.00
$0.00
$1,762,348.71
0220-060-04-00IM
Bayonne
Horace Mann No. 6 E.S.
General capital improvements including: architectural, mechanical,electrical, plumbing, site work, building energy.
School Facility Project
Rehab of Existing Facility
Executed
$531,855.00
$531,855.00
$212,742.00
$319,113.00
0220-060-09-0OAO
Bayonne
Horace Mann No. 6 E.S.
Asbestos abatement and monitioring, lintel replacement & masonry repair; replace boiler feed and vacuum.
School Facility Project
Rehab of Existing Facility
Executed
$811,250.00
$811,250.00
$456,208.06
$355,041.94
0220-070-04-00IN
Bayonne
Lincoln No. 5 E.S.
General capital improvements including: architectural, mechanical, electrical, plumbing, site work, building enrgy
School Facility Project
Rehab of Existing Facility
Executed
$686,718.00
$686,718.00
$274,687.00
$412,031.00
0220-070-09-0OAP
Bayonne
Lincoln No. 5 E.S.
Lintel replacement & masonry repair; window replacement, ext door replacement
School Facility Project
Rehab of Existing Facility
Executed
$831,250.00
$831,250.00
$467,455.10
$363,794.90
0220-080-04-00IO
Bayonne
Mary J. Donohoe No. 4 E.S.
General capital improvements including: architectural, mechanical, electrical, plumbing, site work, building enrgy
School Facility Project
Rehab of Existing Facility
Executed
$626,700.00
$626,700.00
$250,680.00
$376,020.00
0220-080-09-0OAQ
Bayonne
Mary J. Donohoe No. 4 E.S.
ADA restroom upgrades; asbestos abatement & monitoring ;lintel replacement and masonry repair
School Facility Project
Rehab of Existing Facility
Executed
$957,443.00
$957,443.00
$538,419.99
$419,023.01
0220-080-97-0327
Bayonne
Mary J. Donohoe No. 4 E.S.
 
Retro
Addition and Rehab of Existing Facility
Executed
$2,077,631.28
$2,077,631.28
$831,052.51
$1,246,578.77
0220-085-04-00IP
Bayonne
Midtown Community E.S.
General capital improvements including: architectural, mechanical, electrical, plumbing, site work, building enrgy
School Facility Project
Rehab of Existing Facility
Executed
$2,205,104.00
$2,205,104.00
$882,042.00
$1,323,062.00
0220-090-04-00IQ
Bayonne
Phillip G. Vroom No. 2 E.S.
General capital improvements including: Architectural and building systems energy efficiency.
School Facility Project
Rehab of Existing Facility
Executed
$266,250.00
$266,250.00
$106,500.00
$159,750.00
0220-090-09-0OAR
Bayonne
Phillip G. Vroom No. 2 E.S.
Asbestos abatement & monitoring, lintel replacement and masonry repair; boiler vacuum and feed system replacment
School Facility Project
Rehab of Existing Facility
Executed
$687,600.00
$687,600.00
$386,673.24
$300,926.76
0220-120-04-00IR
Bayonne
Washington No. 9 E.S.
General capital improvements including: architectural, electrical, building enrgy
School Facility Project
Rehab of Existing Facility
Executed
$2,316,984.00
$2,316,984.00
$926,794.00
$1,390,190.00
0220-120-09-0OAS
Bayonne
Washington No. 9 E.S.
ADA restroom upgrades; lintel replacement and masonry repair; window replacement
School Facility Project
Rehab of Existing Facility
Executed
$1,493,500.00
$1,493,500.00
$839,872.71
$653,627.29
0220-120-97-0373
Bayonne
Washington No. 9 E.S.
 
Retro
Addition and Rehab of Existing Facility
Executed
$3,047,316.57
$3,047,316.57
$1,218,926.63
$1,828,389.94
0220-130-04-0AEZ
Bayonne
Woodrow Wilson No. 10 E.S.
Addition and capital improvements to the existing facility including architectural, mechanical,site, electrical, plumbing, life safety, and building systems.
School Facility Project
Rehab of Existing Facility
Executed
$10,843,544.00
$7,550,803.00
$3,020,321.00
$7,823,223.00
0220-130-09-0OAT
Bayonne
Woodrow Wilson No. 10 E.S.
ADA restroom upgrades; lintel replacement and masonry repair.
School Facility Project
Rehab of Existing Facility
Executed
$1,258,250.00
$1,258,250.00
$707,579.40
$550,670.60
0220-x02-04-0AFA
Bayonne
New School No.14
Demolition of the existing school No. 14 and replacement with a new facility
School Facility Project
Rehab of Existing Facility
Completed
$17,998,205.00
$10,010,000.00
$4,004,000.00
$13,994,205.00
0230-020-02-0977
Beach Haven Borough
Beach Haven E.S.
Closure of underground oil tank
School Facility Project
Rehab of Existing Facility
Executed
$5,660.00
$5,660.00
$2,264.00
$3,396.00
0230-020-02-1038
Beach Haven Borough
Beach Haven E.S.
Conversion of oil burner to gas
School Facility Project
Rehab of Existing Facility
Executed
$8,500.00
$8,500.00
$3,400.00
$5,100.00
0250-020-03-1123
Belleville
Belleville Senior H.S.
Doors & hardware replacement
School Facility Project
Rehab of Existing Facility
Completed
$78,378.68
$78,378.68
$31,743.21
$46,635.47
0250-020-04-0ASU
Belleville
Belleville Senior H.S.
Installation of Fiber Optic Communications System
School Facility Project
Rehab of Existing Facility
Executed
$177,502.00
$177,502.00
$71,888.00
$105,614.00
0250-020-05-0AIL
Belleville
Belleville Senior H.S.
This project consists of the replacement of the existing roof.
School Facility Project
Rehab of Existing Facility
Completed
$734,077.39
$734,077.39
$297,299.87
$436,777.52
0250-020-09-0MAW
Belleville
Belleville Senior H.S.
Roof replacement
School Facility Project
Rehab of Existing Facility
Offered
$1,049,540.00
$1,049,540.00
$468,782.00
$580,758.00
0250-025-01-0805
Belleville
Belleville M.S.
installation of an elevator
School Facility Project
Rehab of Existing Facility
Executed
$329,777.30
$329,777.30
$132,417.13
$197,360.17
0250-025-03-1124
Belleville
Belleville M.S.
doors & hardware replacement
School Facility Project
Rehab of Existing Facility
Completed
$53,490.38
$53,490.38
$21,663.50
$31,826.88
0250-025-04-0ASV
Belleville
Belleville M.S.
Installation of Fiber Optic Communication System
School Facility Project
Rehab of Existing Facility
Executed
$75,908.00
$75,908.00
$30,743.00
$45,165.00
0250-025-09-0MAX
Belleville
Belleville M.S.
Roof replacement
School Facility Project
Rehab of Existing Facility
Executed
$499,925.58
$499,925.58
$223,294.26
$276,631.32
0250-050-03-0738
Belleville
Number 3 E.S.
Window Replacement.
School Facility Project
Rehab of Existing Facility
Completed
$128,808.00
$128,808.00
$52,167.00
$76,641.00
0250-050-03-1125
Belleville
Number 3 E.S.
Doors and Hardware Replacement.
School Facility Project
Rehab of Existing Facility
Completed
$43,456.37
$43,456.37
$17,599.82
$25,856.55
0250-050-04-0ASW
Belleville
Number 3 E.S.
Installation of Fiber Optic Communication System
School Facility Project
Rehab of Existing Facility
Executed
$75,908.00
$75,908.00
$30,743.00
$45,165.00
0250-055-04-0ASX
Belleville
Number 4 E.S.
Installation of Fiber Optic Communication System
School Facility Project
Rehab of Existing Facility
Executed
$75,908.00
$75,908.00
$30,743.00
$45,165.00
0250-060-03-0739
Belleville
Number 5 E.S.
Replacement of Windows and Lintels.
School Facility Project
Rehab of Existing Facility
Completed
$620,930.74
$516,709.45
$209,266.00
$411,664.74
0250-060-03-1126
Belleville
Number 5 E.S.
Replacement of Exterior Doors & Hardware.
School Facility Project
Rehab of Existing Facility
Completed
$48,445.86
$48,445.86
$19,620.48
$28,825.38
0250-060-04-0ASY
Belleville
Number 5 E.S.
Installation of Fiber Optic Communications System
School Facility Project
Rehab of Existing Facility
Executed
$75,908.00
$75,908.00
$30,743.00
$45,165.00
0250-060-05-0AUX
Belleville
Number 5 E.S.
Asbestos Removal
Emergent
Rehab of Existing Facility
Completed
$75,670.00
$75,670.00
$30,646.20
$45,023.80
0250-060-09-0MAY
Belleville
Number 5 E.S.
Electrical service upgrade
School Facility Project
Rehab of Existing Facility
Executed
$35,855.45
$35,855.45
$16,015.02
$19,840.43
0250-070-03-1134
Belleville
Number 7 E.S.
Window Replacement.
School Facility Project
Rehab of Existing Facility
Completed
$42,638.97
$42,638.97
$17,268.70
$25,370.27
0250-070-04-0ASZ
Belleville
Number 7 E.S.
Installation of Fiber Optic Communications System
School Facility Project
Rehab of Existing Facility
Executed
$78,831.00
$78,831.00
$31,926.00
$46,905.00
0250-080-03-0748
Belleville
Number 8 E.S.
Roof Replacement.
School Facility Project
Rehab of Existing Facility
Completed
$171,349.65
$171,349.65
$69,396.27
$101,953.38
0250-080-03-1135
Belleville
Number 8 E.S.
Window, Doors and Hardware Replacement.
School Facility Project
Rehab of Existing Facility
Completed
$47,237.94
$47,237.94
$19,131.27
$28,106.67
0250-080-04-0ATA
Belleville
Number 8 E.S.
Installation of Fiber Optic Communications System
School Facility Project
Rehab of Existing Facility
Executed
$75,908.00
$75,908.00
$30,743.00
$45,165.00
0250-090-03-1200
Belleville
Number 9 E.S.
Parapet Wall Repair
School Facility Project
Rehab of Existing Facility
Completed
$226,472.64
$226,472.64
$91,720.97
$134,751.67
0250-090-04-0ATB
Belleville
Number 9 E.S.
Installation of Fiber Optic Communications System
School Facility Project
Rehab of Existing Facility
Executed
$75,908.00
$75,908.00
$30,743.00
$45,165.00
0250-100-03-1127
Belleville
Number 10 E.S.
Doors and Hardware Replacement.
School Facility Project
Rehab of Existing Facility
Completed
$6,288.42
$6,288.42
$2,546.80
$3,741.62
0250-100-04-00LW
Belleville
Number 10 E.S.
Boiler replacement
School Facility Project
Rehab of Existing Facility
Completed
$441,874.59
$441,874.59
$178,958.33
$262,916.26
0260-015-02-0871
Bellmawr Borough
Bell Oaks E.S.
Emergent replacement of boilers
Emergent
Rehab of Existing Facility
Completed
$189,577.43
$189,577.43
$75,830.97
$113,746.45
0260-015-04-0APD
Bellmawr Borough
Bell Oaks E.S.
Renovations of storm drainage and walkway.
School Facility Project
Rehab of Existing Facility
Executed
$29,083.81
$29,083.81
$11,633.52
$17,450.29
0260-015-09-0MAF
Bellmawr Borough
Bell Oaks E.S.
Security system upgrades
School Facility Project
Rehab of Existing Facility
Completed
$50,361.00
$50,361.00
$26,331.00
$24,030.00
0260-020-05-0APE
Bellmawr Borough
Bellmawr Park E.S.
Renovations of storm drainage and walkway
School Facility Project
Rehab of Existing Facility
Completed
$131,504.30
$131,504.30
$52,601.72
$78,902.58
0260-020-09-0MAG
Bellmawr Borough
Bellmawr Park E.S.
Security system upgrades
School Facility Project
Rehab of Existing Facility
Completed
$43,760.50
$43,760.50
$22,880.00
$20,880.50
0260-020-09-0ZRB
Bellmawr Borough
Bellmawr Park E.S.
Replacement of original main electrical service with a new 600 amp service.
School Facility Project
Rehab of Existing Facility
Completed
$349,900.00
$349,900.00
$182,946.00
$166,954.00
0260-030-04-0APF
Bellmawr Borough
Ethel M. Burke E.S.
Renovations of classrooms and nurses area
School Facility Project
Rehab of Existing Facility
Completed
$204,237.45
$204,237.45
$81,694.98
$122,542.47
0260-030-05-0APG
Bellmawr Borough
Ethel M. Burke E.S.
Renovations of storm drainage and walkway
School Facility Project
Rehab of Existing Facility
Completed
$338,189.41
$338,189.41
$135,275.76
$202,913.65
0260-030-09-0MAH
Bellmawr Borough
Ethel M. Burke E.S.
Security system upgrades
School Facility Project
Rehab of Existing Facility
Completed
$46,811.00
$46,811.00
$24,475.00
$22,336.00
0270-020-03-0419
Belmar
Belmar E.S.
Roof replacement, emergency egress & exit lighting repairs, floor and ceiling replacement at classrooms & corridors, and asbestos abatement (roof)
School Facility Project
Rehab of Existing Facility
Completed
$2,465,636.00
$2,465,636.00
$986,254.40
$1,479,381.60
0270-020-03-0480
Belmar
Belmar E.S.
Upgrades to HVAC system
School Facility Project
Rehab of Existing Facility
Completed
$3,151,336.20
$3,151,336.00
$1,260,534.00
$1,890,802.20
0280-020-02-0863
Belvidere
Belvidere H.S.
Re-roofing
School Facility Project
Rehab of Existing Facility
Completed
$88,515.00
$88,515.00
$47,016.00
$41,499.00
0280-030-03-0023
Belvidere
Oxford Street E.S.
Rehabilitation - Capital Maintenance Replacement of approximately 14,500 sq ft. of roofing. Project affects health and safety by maintaining building envelope.
School Facility Project
Rehab of Existing Facility
Executed
$163,050.00
$163,050.00
$89,241.99
$73,808.01
0280-050-05-0DAH
Belvidere
Third Street E.S.
Reroof existing shingle roof.
School Facility Project
Rehab of Existing Facility
Completed
$62,153.00
$56,903.00
$31,144.66
$31,008.34
0285-030-03-0258
Bergen County Special Services District
Program 1-Hearing Impaired
Total HVAC Mechanical System Replacement
School Facility Project
Rehab of Existing Facility
Completed
$219,933.90
$194,247.00
$77,699.00
$142,234.90
0285-050-03-0259
Bergen County Special Services District
Program 3-Emotionally Disturb.
Renovations to the HVAC equipment
School Facility Project
Rehab of Existing Facility
Completed
$1,254,724.48
$1,254,724.48
$501,889.79
$752,834.69
0285-050-09-0ZEY
Bergen County Special Services District
Program 3-Emotionally Disturb.
HVAC replacement
School Facility Project
Rehab of Existing Facility
Executed
$178,500.00
$178,500.00
$71,400.00
$107,100.00
0285-070-03-0375
Bergen County Special Services District
Program 5-Life Skills
Alteration/renovation of 2-story masonry bldg, upgrade existing outdated MEP & fire protection systems & replace roofing sys.
School Facility Project
Rehab of Existing Facility
Completed
$2,996,967.89
$2,994,359.00
$1,197,744.00
$1,925,824.02
0285-100-09-0ZEZ
Bergen County Special Services District
Program 6-Autistic
New building video security system.
School Facility Project
Rehab of Existing Facility
Completed
$49,930.77
$49,930.77
$19,972.00
$29,958.77
0290-020-02-0220
Bergen County Vocational School District
Academies Voc. & Tech. High, Hackensack
Academies Auto Trades - Rehab roof.
School Facility Project
Rehab of Existing Facility
Completed
$231,754.36
$231,754.36
$92,701.74
$139,052.62
0290-020-02-0447
Bergen County Vocational School District
Academies Voc. & Tech. High, Hackensack
Academies H.S. - Physics lab renovations.
School Facility Project
Rehab of Existing Facility
Completed
$1,792,000.00
$1,792,000.00
$716,800.00
$1,075,200.00
0290-020-03-0633
Bergen County Vocational School District
Academies Voc. & Tech. High, Hackensack
Renovations to existing facility
School Facility Project
Rehab of Existing Facility
Executed
$536,586.28
$380,159.00
$152,064.00
$384,522.28
0290-020-03-0715
Bergen County Vocational School District
Academies Voc. & Tech. High, Hackensack
Renovations to existing facility
School Facility Project
Rehab of Existing Facility
Completed
$956,285.74
$956,285.74
$382,514.30
$573,771.44
0290-030-04-0AEF
Bergen County Vocational School District
Vocational, Paramus (Spec. Need)
One story addition to existing building linking two buildings that include 4 classrooms, one computer lab, and one Physics Lab.
School Facility Project
Addition and Rehab of Existing Facility
Executed
$2,678,673.00
$2,678,673.00
$1,067,198.79
$1,600,798.19
0290-070-01-0823
Bergen County Vocational School District
Vocational, Teterboro
Addition of gymnasium, general classrooms, locker room, etc.
School Facility Project
Addition To Existing Facility
Completed
$5,307,159.00
$5,307,159.00
$2,122,864.00
$3,184,295.00
0290-070-02-0095
Bergen County Vocational School District
Vocational, Teterboro
Technical H.S - interior renovations/change of use of auditorium to SGI classrooms
School Facility Project
Rehab of Existing Facility
Completed
$85,000.00
$85,000.00
$34,000.00
$51,000.00
0290-070-02-0445
Bergen County Vocational School District
Vocational, Teterboro
Technical H.S. - Renovations to 3 Classrooms and a lab
School Facility Project
Rehab of Existing Facility
Completed
$305,000.00
$305,000.00
$122,000.00
$183,000.00
0290-070-03-0543
Bergen County Vocational School District
Vocational, Teterboro
Renovation to 3,300-gsf: 3 Academic classrooms & electronics lab (formerly masonry shop/storage). Related furniture & equipment.
School Facility Project
Rehab of Existing Facility
Completed
$1,099,491.07
$912,269.00
$364,908.00
$734,583.07
0290-070-04-0AEG
Bergen County Vocational School District
Vocational, Teterboro
Change-of-use: Covert obsolete gym to auditorium.
School Facility Project
Rehab of Existing Facility
Executed
$721,362.00
$721,362.00
$288,545.00
$432,817.00
0290-070-04-0AEH
Bergen County Vocational School District
Vocational, Teterboro
Change-of-use: Convert obsolete locker rooms to music instruction room.
School Facility Project
Rehab of Existing Facility
Executed
$273,400.00
$273,400.00
$109,360.00
$164,040.00
0290-075-02-0446
Bergen County Vocational School District
Vocational, Paramus
Technical Education Center - Renovations to science labs, vestibule, related furniture & equipment
School Facility Project
Rehab of Existing Facility
Completed
$205,308.46
$205,308.46
$82,123.38
$123,185.08
0300-020-02-0901
Bergenfield
Bergenfield H.S.
Refurbish 826 existing auditorium chairs
School Facility Project
Rehab of Existing Facility
Completed
$117,490.74
$117,490.74
$46,996.30
$70,494.44
0300-020-02-1091
Bergenfield
Bergenfield H.S.
ADA upgrades to Girl's and Boy's toilet rooms
School Facility Project
Rehab of Existing Facility
Completed
$159,469.55
$159,469.55
$63,787.82
$95,681.73
0300-020-04-00LE
Bergenfield
Bergenfield H.S.
roof replacement
School Facility Project
Rehab of Existing Facility
Completed
$265,542.35
$265,542.35
$106,216.94
$159,325.41
0300-020-09-0ZYY
Bergenfield
Bergenfield H.S.
Toilet room renovations for ADA compliance.
School Facility Project
Rehab of Existing Facility
Offered
$61,269.00
$61,269.00
$24,508.00
$36,761.00
0300-020-09-0ZYZ
Bergenfield
Bergenfield H.S.
Roof replacement and repairs.
School Facility Project
Rehab of Existing Facility
Offered
$2,680,769.00
$2,680,769.00
$1,072,308.00
$1,608,461.00
0300-040-04-00LF
Bergenfield
Franklin E.S.
Roof replacement
School Facility Project
Rehab of Existing Facility
Completed
$68,554.08
$68,554.08
$27,421.63
$41,132.45
0300-050-00-0220
Bergenfield
Hoover E.S.
Addition and renovations to school
Retro
Addition and Rehab of Existing Facility
Completed
$454,020.00
$454,020.00
$181,608.00
$272,412.00
0300-050-02-0902
Bergenfield
Hoover E.S.
Electrical upgrades including Technology wiring and associated split-system air conditioning unit
School Facility Project
Rehab of Existing Facility
Completed
$81,696.38
$81,696.38
$32,678.55
$49,017.83
0300-050-04-00LG
Bergenfield
Hoover E.S.
Roof replacement
School Facility Project
Rehab of Existing Facility
Completed
$187,019.43
$187,019.43
$74,807.77
$112,211.66
0300-060-02-0903
Bergenfield
Jefferson E.S.
Electrical upgrades including technology and associated split-system air conditioning unit
School Facility Project
Rehab of Existing Facility
Completed
$101,027.83
$101,027.83
$40,411.13
$60,616.70
0300-075-02-0904
Bergenfield
Roy W. Brown M.S.
electrical upgrades including Technology wiring and associated split-sytem air conditioning unit
School Facility Project
Rehab of Existing Facility
Completed
$379,029.97
$379,029.97
$151,611.99
$227,417.98
0300-075-04-00LH
Bergenfield
Roy W. Brown M.S.
Roof Replacement
School Facility Project
Rehab of Existing Facility
Completed
$59,102.68
$58,500.00
$23,400.00
$35,702.68
0300-080-04-00LI
Bergenfield
Washington E.S.
Roof Replacement
School Facility Project
Rehab of Existing Facility
Completed
$92,459.39
$92,459.39
$36,983.76
$55,475.63
0310-005-01-0236
Berkeley Heights
Governor Livingston H.S.
Rehab - toilet rooms, repair roof, electrical system, upgrade science labs
Waiver
Addition and Rehab of Existing Facility
Completed
$1,489,732.16
$1,489,732.16
$595,892.86
$893,839.30
0310-005-09-0XAZ
Berkeley Heights
Governor Livingston H.S.
ADA upgrades to exisiting toilet rooms.
School Facility Project
Rehab of Existing Facility
Completed
$407,371.49
$407,371.49
$162,949.00
$244,422.49
0310-020-01-0233
Berkeley Heights
Thomas P. Hughes E.S.
Rehab - toilet rooms/exhaust systems, ventilation system, electrical equipment, technology panels
Waiver
Addition and Rehab of Existing Facility
Completed
$328,091.95
$325,255.65
$130,102.26
$197,989.69
0310-030-00-0355
Berkeley Heights
Columbia M.S.
Rehab - Alt. to music area, install ramp/electrical equipment/intercom systems and replace doors/ent
Waiver
Addition and Rehab of Existing Facility
Completed
$5,365,025.00
$3,786,892.00
$1,514,756.80
$3,850,268.20
0310-030-03-0838
Berkeley Heights
Columbia M.S.
Removal of existing wheelchair lifts and replacement.
School Facility Project
Addition and Rehab of Existing Facility
Executed
$69,682.26
$63,941.00
$25,576.00
$44,105.86
0310-030-03-0938
Berkeley Heights
Columbia M.S.
Removal and replacement of existing boilers.
School Facility Project
Rehab of Existing Facility
Completed
$625,301.16
$625,301.16
$250,120.46
$375,180.70
0310-035-00-0356
Berkeley Heights
Hamilton Terrace ECC
Rehab - elevator/restrooms, toilets, electrical equipment, replace exterior entrances, tech panels
Waiver
Addition and Rehab of Existing Facility
Completed
$715,993.47
$715,993.47
$286,397.39
$429,596.08
0310-040-01-0234
Berkeley Heights
Mountain Park E.S.
Rehab - toilet rooms/exhaust systems, electrical equipment, technology panels
Waiver
Addition and Rehab of Existing Facility
Completed
$339,428.00
$339,428.00
$135,771.07
$203,656.80
0310-040-03-1323
Berkeley Heights
Mountain Park E.S.
Remove and replace existing roof system and soffits.
School Facility Project
Rehab of Existing Facility
Completed
$566,874.95
$566,874.95
$226,749.98
$340,124.97
0310-050-01-0235
Berkeley Heights
William Woodruff E.S.
Rehab - Toilet rooms/exhaust systems, electrical equipment, technology panels
Waiver
Addition and Rehab of Existing Facility
Completed
$327,914.84
$327,702.28
$131,080.91
$196,833.93
0320-020-02-0414
Berkeley Township
Bayville E.S.
Addition of 5 classrooms, media center, 7 small group instruction spaces, 1 science lab, 2 vocal music/instrumental music romms, 2 speech rooms, 1 computer lab, 1 art room and a gym
School Facility Project
Addition and Rehab of Existing Facility
Executed
$5,491,372.73
$4,294,522.00
$1,717,809.00
$3,773,563.73
0320-030-02-0415
Berkeley Township
Clara B. Worth E.S.
Addition of 12 classrooms, 2 small group instruction spaces, science lab, media center, special education classroom and 2 vocal/instrumental music rooms. Various renovations.
School Facility Project
Addition and Rehab of Existing Facility
Completed
$5,626,000.00
$3,826,815.00
$1,530,726.00
$4,095,274.00
0320-030-09-0VAS
Berkeley Township
Clara B. Worth E.S.
Bolier replacement
School Facility Project
Rehab of Existing Facility
Executed
$334,800.00
$334,800.00
$133,920.00
$200,880.00
0320-040-02-0416
Berkeley Township
H & M Potter E.S.
Addition of new pre-K, K and general classrooms, science lab, vocal music, instrumental music, small group instruction, gymnasium and small kitchen. Various renovations.
School Facility Project
Addition and Rehab of Existing Facility
Completed
$5,296,300.00
$3,784,599.00
$1,513,840.00
$3,782,460.00
0320-N01-02-0417
Berkeley Township
New Elementary School
New Elementary School facility
School Facility Project
New Construction
Executed
$16,661,101.48
$11,871,312.00
$4,748,525.00
$11,912,576.46
0330-020-02-0993
Berlin Borough
Berlin Community E.S.
New addition including classrooms, offices, expansion of multipurpose room, etc. Rehab for computer lab and SGI pulus toilet renovations and site work.
School Facility Project
Addition and Rehab of Existing Facility
Executed
$7,592,995.00
$6,596,349.00
$2,681,050.00
$4,911,945.00
0340-030-09-0ZZM
Berlin Township
Dwight D. Eisenhower Mem. E.S.
Roof replacement and replacement of geothermal system.
School Facility Project
Rehab of Existing Facility
Executed
$3,444,127.00
$3,444,127.00
$1,735,794.00
$1,708,333.00
0340-050-09-0ZZN
Berlin Township
John F. Kennedy Memorial E.S.
Roof replacement and replacement of geothermal system.
School Facility Project
Rehab of Existing Facility
Executed
$2,996,928.00
$2,996,928.00
$1,510,412.00
$1,486,516.00
0350-050-01-0527
Bernards Township
Ridge H.S.
replace existing roof with a new roof - project includes a double tear off and a full replacement
Emergent
Rehab of Existing Facility
Completed
$1,120,262.00
$1,120,262.00
$448,104.80
$672,157.20
0350-055-04-00CL
Bernards Township
William Annin M.S.
Replace boilers
School Facility Project
Rehab of Existing Facility
Executed
$254,898.52
$254,898.52
$101,959.41
$152,939.11
0350-060-03-0947
Bernards Township
Oak Street E.S.
Roof replacement and Exterior Brick re-pointing.
School Facility Project
Rehab of Existing Facility
Completed
$632,790.00
$632,790.00
$253,116.00
$379,674.00
0350-060-05-0AQU
Bernards Township
Oak Street E.S.
Replace windows
School Facility Project
Rehab of Existing Facility
Executed
$174,930.00
$174,930.00
$69,972.00
$104,958.00
0350-070-02-1005
Bernards Township
Cedar Hill E.S.
replacement of heating pipes
School Facility Project
Rehab of Existing Facility
Completed
$191,248.47
$191,248.47
$76,499.38
$114,749.09
0350-070-05-0AQV
Bernards Township
Cedar Hill E.S.
Replace windows
School Facility Project
Rehab of Existing Facility
Executed
$167,195.00
$167,195.00
$66,878.00
$100,317.00
0350-080-02-0816
Bernards Township
Liberty Corner E.S.
Roof Replacement
School Facility Project
Rehab of Existing Facility
Completed
$292,720.00
$292,720.00
$117,088.00
$175,632.00
0350-080-04-00CK
Bernards Township
Liberty Corner E.S.
Replace hot water boilers.
School Facility Project
Rehab of Existing Facility
Executed
$215,318.32
$215,318.32
$86,127.33
$129,190.99
0350-080-05-0AQW
Bernards Township
Liberty Corner E.S.
Replace windows
School Facility Project
Rehab of Existing Facility
Executed
$195,064.00
$195,064.00
$78,026.00
$117,038.00
0350-080-05-0CAO
Bernards Township
Liberty Corner E.S.
Replace windows and new classroom ceiling fans.
School Facility Project
Rehab of Existing Facility
Executed
$409,940.00
$364,847.00
$145,939.00
$264,001.00
0370-020-00-0242
Bethlehem Township
Ethel Hoppock Elementary
Renovation of existing interior spaces and exisiting systems
Waiver
Addition and Rehab of Existing Facility
Completed
$3,619,941.09
$2,328,474.00
$931,389.60
$2,688,551.49
0370-020-05-0CAZ
Bethlehem Township
Ethel Hoppock Elementary
Roof Replacement, Ramp Repair & Regrading.
Emergent
Rehab of Existing Facility
Executed
$1,114,051.00
$1,114,051.00
$445,620.00
$668,431.00
0370-020-09-0ZSR
Bethlehem Township
Ethel Hoppock Elementary
New gym light fixtures.
School Facility Project
Rehab of Existing Facility
Offered
$242,700.00
$242,700.00
$97,080.00
$145,620.00
0370-070-00-0243
Bethlehem Township
Thomas B. Conley E.S.
Renovation of existing spaces and existing systems
Waiver
Addition and Rehab of Existing Facility
Completed
$4,336,122.29
$4,278,000.00
$1,711,200.00
$2,624,922.29
0370-070-05-0DAA
Bethlehem Township
Thomas B. Conley E.S.
Repave & stripe existing parking lot. Repair damaged curbs, crosswalks, & islands that are safety issues.
Emergent
Rehab of Existing Facility
Executed
$149,460.00
$149,460.00
$59,784.00
$89,676.00
0370-070-09-0ZSS
Bethlehem Township
Thomas B. Conley E.S.
New gym light fixtures.
School Facility Project
Rehab of Existing Facility
Offered
$67,400.00
$67,400.00
$26,960.00
$40,440.00
0380-025-09-0LAU
Beverly City
Beverly E.S.
Two PK classroom 6,070 SF addition with special education classroom, storage, two barrier-free-restrooms, roof replacement, window replacement, HVAC replacement, flooring replacement, bleacher replacement, etc.
School Facility Project
Rehab of Existing Facility
Offered
$7,216,988.00
$5,937,437.00
$2,970,606.00
$4,246,382.00
0390-020-04-0AEI
Black Horse Pike Regional
Highland H.S.
Replacing entire flat roof due to extreme damage and leaking throughout the school.
Emergent
Rehab of Existing Facility
Completed
$1,594,321.24
$1,594,321.24
$921,232.29
$673,088.95
0390-020-09-0ZDN
Black Horse Pike Regional
Highland H.S.
Cafeteria HVAC upgrades; Replacement of existing drop ceilings and lighting for modifications to existing duct work.
School Facility Project
Rehab of Existing Facility
Completed
$370,000.00
$370,000.00
$222,418.00
$147,582.00
0390-020-09-0ZRC
Black Horse Pike Regional
Highland H.S.
Fire alarm replacement.
School Facility Project
Rehab of Existing Facility
Completed
$1,278,000.00
$1,278,000.00
$768,245.00
$509,755.00
0390-050-09-0MAI
Black Horse Pike Regional
Triton H.S.
HVAC and lighting system replacement in auditorium.
School Facility Project
Rehab of Existing Facility
Completed
$642,892.85
$642,892.85
$386,463.00
$256,429.85
0400-030-02-0885
Blairstown Township
Blairstown E.S.
boiler replacement
School Facility Project
Rehab of Existing Facility
Completed
$39,150.00
$39,150.00
$15,660.00
$23,490.00
0400-030-04-0AZR
Blairstown Township
Blairstown E.S.
Upgrade/replacement of existing on-site sanitary sewerage system.
School Facility Project
Rehab of Existing Facility
Completed
$286,584.60
$286,584.60
$114,633.84
$171,950.76
0410-020-02-0451
Bloomfield Township
Bloomfield H.S.
Addition of 5 general and 7 science classrooms, auxillary gymnaium and storage, locker and fitness training rooms, kitchen area and support services facility, faculty diningand main office suite and rehabilitation of existing rooms
School Facility Project
Addition and Rehab of Existing Facility
Executed
$58,065,079.00
$45,298,295.00
$18,119,318.00
$39,945,761.00
0410-020-09-0ZRY
Bloomfield Township
Bloomfield H.S.
Cornice restoration and repair.
School Facility Project
Rehab of Existing Facility
Completed
$808,644.47
$808,644.47
$323,457.79
$485,186.68
0410-030-02-0850
Bloomfield Township
Bloomfield Middle
Installation of connections for computer equipment
School Facility Project
Rehab of Existing Facility
Completed
$357,874.00
$357,874.00
$143,149.60
$214,724.40
0410-030-04-00MU
Bloomfield Township
Bloomfield Middle
Telecommunications upgrade
School Facility Project
Rehab of Existing Facility
Completed
$46,050.00
$46,050.00
$18,420.00
$27,630.00
0410-050-02-0847
Bloomfield Township
Berkeley E.S.
Stair tower repair and computer connections
School Facility Project
Rehab of Existing Facility
Completed
$14,769.00
$14,769.00
$5,907.00
$8,862.00
0410-050-04-00MW
Bloomfield Township
Berkeley E.S.
Telecommunications upgrade.
School Facility Project
Rehab of Existing Facility
Completed
$30,978.00
$30,978.00
$12,391.00
$18,587.00
0410-060-02-0851
Bloomfield Township
Brookdale E.S.
Installation of connections for computer equipment and repair built-in gutter system
School Facility Project
Rehab of Existing Facility
Completed
$16,944.00
$16,944.00
$6,778.00
$10,166.00
0410-060-04-00CV
Bloomfield Township
Brookdale E.S.
Interior Rehabilitation-replacement of asbestos floor tile and repair of stair tower.
School Facility Project
Rehab of Existing Facility
Completed
$52,217.00
$52,217.00
$20,887.00
$31,330.00
0410-060-04-00MV
Bloomfield Township
Brookdale E.S.
Telecommunications upgrade.
School Facility Project
Rehab of Existing Facility
Completed
$21,512.00
$21,512.00
$8,605.00
$12,907.00
0410-080-02-0852
Bloomfield Township
Carteret E.S.
Window replacement and computer connections
School Facility Project
Rehab of Existing Facility
Completed
$161,694.00
$161,694.00
$64,677.60
$97,016.40
0410-080-04-00MX
Bloomfield Township
Carteret E.S.
Telecommunications upgrade
School Facility Project
Rehab of Existing Facility
Completed
$27,498.00
$27,498.00
$10,999.00
$16,499.00
0410-100-02-0854
Bloomfield Township
Demarest E.S.
Installation of connections for computer equipment and replacement of PA system
School Facility Project
Rehab of Existing Facility
Completed
$14,847.00
$14,847.00
$5,939.00
$8,908.00
0410-100-04-00MY
Bloomfield Township
Demarest E.S.
Telecommunications upgrade
School Facility Project
Rehab of Existing Facility
Completed
$28,033.00
$28,033.00
$11,213.00
$16,820.00
0410-110-02-0856
Bloomfield Township
Fairview E.S.
Computer connections and removal of ext. fire excape
School Facility Project
Rehab of Existing Facility
Completed
$47,843.00
$47,843.00
$19,137.20
$28,705.80
0410-110-04-00MZ
Bloomfield Township
Fairview E.S.
Telecommunications upgrade
School Facility Project
Rehab of Existing Facility
Completed
$30,415.00
$30,415.00
$12,166.00
$18,249.00
0410-120-04-00NA
Bloomfield Township
Forest Glen
Telecommunications upgrade
School Facility Project
Rehab of Existing Facility
Completed
$18,373.00
$18,373.00
$7,349.00
$11,024.00
0410-130-02-0859
Bloomfield Township
Franklin E.S.
Installation of connections for computer equipment
School Facility Project
Rehab of Existing Facility
Completed
$6,747.00
$6,747.00
$2,699.00
$4,048.00
0410-130-04-00CU
Bloomfield Township
Franklin E.S.
Asbestos Floor tile replacement.
School Facility Project
Rehab of Existing Facility
Completed
$37,591.00
$37,591.00
$15,036.00
$22,555.00
0410-130-04-00NB
Bloomfield Township
Franklin E.S.
Telecommunications upgrade
School Facility Project
Rehab of Existing Facility
Completed
$23,939.00
$23,939.00
$9,576.00
$14,363.00
0410-140-02-0860
Bloomfield Township
Oak View E.S.
Installation of connections for computer equipment
School Facility Project
Rehab of Existing Facility
Completed
$10,429.00
$10,429.00
$4,172.00
$6,257.00
0410-140-03-1392
Bloomfield Township
Oak View E.S.
Roof Replacement
School Facility Project
Rehab of Existing Facility
Completed
$408,563.54
$408,563.54
$163,425.42
$245,138.12
0410-140-04-00NC
Bloomfield Township
Oak View E.S.
Telecommunications upgrade
School Facility Project
Rehab of Existing Facility
Completed
$23,433.00
$23,433.00
$9,373.00
$14,060.00
0410-140-09-0MAZ
Bloomfield Township
Oak View E.S.
Replacement of existing main boiler with new unit
School Facility Project
Rehab of Existing Facility
Offered
$222,747.00
$222,747.00
$89,099.00
$133,648.00
0410-150-02-0861
Bloomfield Township
Watsessing E.S.
Installation of connections for computer equipment
School Facility Project
Rehab of Existing Facility
Completed
$6,459.00
$6,459.00
$2,584.00
$3,875.00
0410-150-04-00ND
Bloomfield Township
Watsessing E.S.
Telecommunications upgrade
School Facility Project
Rehab of Existing Facility
Completed
$26,521.00
$26,521.00
$10,608.00
$15,913.00
0420-020-09-00AB
Bloomingdale
Martha B. Day E.S.
Asbestos floor tile removal (Kitchen and storage room) and intercom upgrades.
School Facility Project
Rehab of Existing Facility
Offered
$22,899.00
$22,899.00
$9,160.00
$13,739.00
0420-020-09-0WAT
Bloomingdale
Martha B. Day E.S.
Corridor, office and toilet room lighting upgrade.
School Facility Project
Rehab of Existing Facility
Offered
$87,702.00
$87,702.00
$35,081.00
$52,621.00
0420-030-02-0612
Bloomingdale
Samuel R. Donald E.S.
Replace the exisiting oil fired boilers with gas fired boilers and install new heating and ventilating system in the all purpose room
School Facility Project
Rehab of Existing Facility
Completed
$272,686.80
$272,686.80
$109,074.72
$163,612.08
0420-030-09-00AC
Bloomingdale
Samuel R. Donald E.S.
Corridor, office and toilet lighting upgrades.
School Facility Project
Rehab of Existing Facility
Offered
$341,210.00
$341,210.00
$136,484.00
$204,726.00
0420-030-09-00AD
Bloomingdale
Samuel R. Donald E.S.
Asbestos floor tile removal (3 classrooms) and intercom upgrades.
School Facility Project
Rehab of Existing Facility
Offered
$39,561.00
$39,561.00
$15,824.00
$23,737.00
0420-050-04-00CF
Bloomingdale
Walter T. Bergen M.S.
replacement of deteriorated corrugated metal stormwatre pipe under parkign lot. Stormwater is running under the existing pipe.
Emergent
Rehab of Existing Facility
Completed
$93,354.00
$93,354.00
$37,342.00
$56,012.00
0420-050-09-00AE
Bloomingdale
Walter T. Bergen M.S.
New ADA chairlift.
School Facility Project
Rehab of Existing Facility
Offered
$83,660.00
$83,660.00
$33,464.00
$50,196.00
0420-050-09-00AF
Bloomingdale
Walter T. Bergen M.S.
Sidewalk replacement.
School Facility Project
Rehab of Existing Facility
Offered
$14,040.00
$14,040.00
$5,616.00
$8,424.00
0430-020-05-0AZH
Bloomsbury
Bloomsbury E.S.
Additions and alteration to existing building.
School Facility Project
Rehab of Existing Facility
Completed
$155,315.07
$155,315.07
$62,126.03
$93,189.04
0440-020-02-0992
Bogota
Bogota H.S.
Removal & replacment of stair tower doors
School Facility Project
Rehab of Existing Facility
Completed
$170,271.00
$170,271.00
$68,108.00
$102,163.00
0440-020-09-0JAV
Bogota
Bogota H.S.
Repair and replace existing roofing
School Facility Project
Rehab of Existing Facility
Completed
$804,895.48
$804,895.48
$423,575.44
$381,320.04
0440-030-02-0217
Bogota
E. Roy Bixby E.S.
Additions and Renovations
School Facility Project
Addition and Rehab of Existing Facility
Completed
$5,056,518.00
$4,082,805.00
$1,369,435.00
$3,687,083.00
0440-050-02-0218
Bogota
Lillian M. Steen E.S.
Addition and Renovations
School Facility Project
Addition and Rehab of Existing Facility
Completed
$7,921,107.00
$5,631,066.00
$2,252,426.00
$5,668,681.00
0450-020-02-1069
Boonton Town
Boonton H.S.
auditorium upgrade
School Facility Project
Rehab of Existing Facility
Completed
$389,114.72
$389,064.72
$155,625.88
$233,488.84
0450-020-03-1429
Boonton Town
Boonton H.S.
The District has requested a state share grant to offset the cost of replacing the Intercom system at the high school. This is a non-educational project.
School Facility Project
Rehab of Existing Facility
Completed
$88,703.84
$88,703.84
$35,481.54
$53,222.30
0450-020-03-1430
Boonton Town
Boonton H.S.
The District has requested a State Share Grant to offset the costs of replacing two HC lifts. This is considered an Educational Project.
School Facility Project
Rehab of Existing Facility
Completed
$62,676.90
$62,676.90
$25,070.76
$37,606.14
0450-020-04-00ZB
Boonton Town
Boonton H.S.
This district has requested a state share grant to offset the costs of replacing sections of the roof. This is considered a non-educational project.
School Facility Project
Rehab of Existing Facility
Completed
$230,850.00
$230,850.00
$92,340.00
$138,510.00
0450-030-05-0ALC
Boonton Town
John Hill E.S.
The district has requested a state share gran to offset the osts of replacing the Multipurpose Room/Gym Flr. This is considered a non-educational project.
Emergent
Rehab of Existing Facility
Completed
$128,325.00
$115,454.00
$46,181.60
$82,143.40
0450-040-03-0016
Boonton Town
School Street E.S.
repairs to school's façade
School Facility Project
Rehab of Existing Facility
Completed
$148,305.00
$148,305.00
$59,322.00
$88,983.00
0450-040-05-0AZT
Boonton Town
School Street E.S.
The project will be to replace the current equipment.
School Facility Project
Rehab of Existing Facility
Completed
$41,167.00
$39,202.00
$15,681.00
$25,486.00
0460-060-02-1113
Boonton Township
Rockaway Valley E.S.
New lighting
School Facility Project
Rehab of Existing Facility
Completed
$92,500.00
$92,500.00
$37,000.00
$55,500.00
0460-060-05-0AUY
Boonton Township
Rockaway Valley E.S.
Playground Equipment Replacement
School Facility Project
Rehab of Existing Facility
Completed
$158,313.00
$158,313.00
$63,325.00
$94,988.00
0475-060-02-0335
Bordentown Regional School District
Clara Barton E.S.
renovations
School Facility Project
Rehab of Existing Facility
Completed
$1,831,755.00
$1,132,109.00
$452,844.00
$1,378,911.00
0475-090-02-0336
Bordentown Regional School District
MacFarland Elementary School
renovations
School Facility Project
Rehab of Existing Facility
Completed
$1,118,875.01
$1,118,664.00
$447,466.00
$671,409.01
0475-090-02-1097
Bordentown Regional School District
MacFarland Elementary School
replacement of hot water heaters
School Facility Project
Rehab of Existing Facility
Completed
$17,200.00
$17,200.00
$6,880.00
$10,320.00
0475-100-02-0337
Bordentown Regional School District
Peter Muschal Elementary
corridor link and renovations
School Facility Project
Addition and Rehab of Existing Facility
Completed
$923,063.00
$301,514.00
$120,606.00
$802,457.00
0475-N01-02-0338
Bordentown Regional School District
Middle School (Existing HS)
conversion of existing high school to middle school/renovations
School Facility Project
Rehab of Existing Facility
Completed
$1,674,235.00
$1,674,235.00
$669,694.00
$1,004,541.00
0475-N02-02-0339
Bordentown Regional School District
New High School
new contruction - Block 58, Lots 6 & 5.01
School Facility Project
New Construction
Completed
$37,420,503.00
$19,938,792.00
$7,975,517.00
$29,444,986.00
0490-020-04-00EA
Bound Brook Borough
Bound Brook H.S.
Remove and replace existing wood gym floor.
Emergent
Rehab of Existing Facility
Completed
$136,201.00
$136,201.00
$54,480.40
$81,720.60
0490-020-04-00XS
Bound Brook Borough
Bound Brook H.S.
Remove and replace existing wood gym bleachers.
School Facility Project
Rehab of Existing Facility
Completed
$86,595.00
$86,595.00
$34,638.00
$51,957.00
0490-020-05-0ALA
Bound Brook Borough
Bound Brook H.S.
Renovations to Guidance Suite and Art room,
School Facility Project
Rehab of Existing Facility
Completed
$221,794.00
$221,794.00
$88,718.00
$133,076.00
0490-020-05-0AUZ
Bound Brook Borough
Bound Brook H.S.
Renovations to 4 sub-standard classrooms.
School Facility Project
Rehab of Existing Facility
Completed
$206,485.00
$206,485.00
$82,594.00
$123,891.00
0490-020-09-0ZBD
Bound Brook Borough
Bound Brook H.S.
Install new water feed distribution system into boiler room.
School Facility Project
Rehab of Existing Facility
Completed
$56,452.25
$56,452.25
$33,353.00
$23,099.25
0490-030-09-0ZBE
Bound Brook Borough
Lafayette E.S.
Electrical service upgrade with new sub main distribution board.
School Facility Project
Rehab of Existing Facility
Completed
$103,951.25
$88,750.00
$52,434.74
$51,516.51
0490-030-09-0ZBF
Bound Brook Borough
Lafayette E.S.
Power and data modification and wiring for electrical equipment.
School Facility Project
Rehab of Existing Facility
Completed
$31,420.00
$31,420.00
$18,563.00
$12,856.62
0490-035-09-0ZBG
Bound Brook Borough
LaMonte E.S.
Roof structure repair and ceiling design.
School Facility Project
Rehab of Existing Facility
Executed
$227,373.82
$222,256.00
$131,311.96
$90,944.04
0490-040-04-000X
Bound Brook Borough
LaMonte Building
Remove existing doors and Replace with Fire Doors.
Emergent
Rehab of Existing Facility
Completed
$60,874.00
$60,874.00
$24,350.00
$36,524.00
0490-050-09-0ZBH
Bound Brook Borough
Smalley E.S.
Power and data modification and wiring for electrical equipment.
School Facility Project
Rehab of Existing Facility
Completed
$37,510.00
$37,510.00
$22,161.00
$44,908.16
0500-020-03-0358
Bradley Beach
Bradley Beach E.S.
Building addition to house a 4-stop hydraulic elevator and entry vestibule.
School Facility Project
Rehab of Existing Facility
Completed
$450,088.47
$450,088.47
$180,035.39
$270,053.08
0500-020-03-0414
Bradley Beach
Bradley Beach E.S.
a) Renovation of toilet rooms, exterior doors, stairs and sidewalks, replace windows, provide windows. Provide ADA hardware, repair roof caves, gutters and soffits.
School Facility Project
Rehab of Existing Facility
Executed
$3,608,846.38
$3,608,846.38
$1,443,538.55
$2,165,307.83
0510-020-00-0332
Branchburg Township
Central M.S.
 
Retro
Addition and Rehab of Existing Facility
Executed
$16,991,000.00
$8,317,198.78
$3,326,879.60
$13,664,120.40
0510-020-04-00NG
Branchburg Township
Central M.S.
Replace roof, siding, HVAC controls and windows.
Emergent
Rehab of Existing Facility
Executed
$1,152,657.92
$1,152,657.92
$461,063.00
$691,594.92
0510-020-04-00XT
Branchburg Township
Central M.S.
Interior security systems and roof finishes.
School Facility Project
Rehab of Existing Facility
Completed
$29,360.00
$4,390.00
$1,756.00
$27,604.00
0510-020-04-0AED
Branchburg Township
Central M.S.
Install rails on the bleachers & install sound panels on the Cafeteria walls.
School Facility Project
Rehab of Existing Facility
Completed
$10,745.00
$10,745.00
$4,298.00
$6,447.00
0510-020-09-0ZXU
Branchburg Township
Central M.S.
New gym lighting.
School Facility Project
Rehab of Existing Facility
Executed
$24,658.00
$24,658.00
$9,863.20
$14,794.80
0510-050-00-0331
Branchburg Township
Old York E.S.
 
Retro
Addition and Rehab of Existing Facility
Completed
$376,935.00
$290,000.00
$116,000.00
$260,935.00
0510-050-04-00NH
Branchburg Township
Old York E.S.
Replace boiler, HVAC controls, door and window replacement.
School Facility Project
Rehab of Existing Facility
Completed
$1,181,715.80
$1,181,715.80
$472,686.32
$709,029.48
0510-050-04-00XU
Branchburg Township
Old York E.S.
Minor replacement of interior finishes, security equipment, and site work.
School Facility Project
Rehab of Existing Facility
Completed
$28,450.00
$15,050.00
$6,020.00
$22,430.00
0510-050-04-00XV
Branchburg Township
Old York E.S.
Exterior lights and basketball backstops in the playground.
School Facility Project
Rehab of Existing Facility
Completed
$3,415.00
$1,415.00
$566.00
$2,849.00
0510-050-09-0ZXV
Branchburg Township
Old York E.S.
New gym lighting.
School Facility Project
Rehab of Existing Facility
Offered
$4,758.00
$4,758.00
$1,903.20
$2,854.80
0510-060-00-0333
Branchburg Township
Stony Brook E.S.
 
Retro
Addition and Rehab of Existing Facility
Completed
$337,886.00
$320,700.00
$128,280.00
$209,606.00
0510-060-04-00NF
Branchburg Township
Stony Brook E.S.
Replace HVAC controls and exterior door replacement
School Facility Project
Rehab of Existing Facility
Completed
$95,016.28
$95,016.28
$38,006.51
$57,009.77
0510-060-04-0AEC
Branchburg Township
Stony Brook E.S.
Replace exterior building light fixtures, new exterior storage building addition, and ADA signage.
School Facility Project
Rehab of Existing Facility
Completed
$21,108.00
$4,688.00
$1,875.00
$19,233.00
0510-060-09-0ZXW
Branchburg Township
Stony Brook E.S.
New gym lighting.
School Facility Project
Rehab of Existing Facility
Executed
$4,082.00
$4,082.00
$1,632.80
$2,449.20
0510-090-00-0330
Branchburg Township
Whiton E.S.
 
Retro
Addition and Rehab of Existing Facility
Completed
$4,179,678.00
$862,500.00
$345,000.00
$3,834,678.00
0510-090-03-1499
Branchburg Township
Whiton E.S.
The project is the replacement of the HVAC energy control system.
School Facility Project
Rehab of Existing Facility
Completed
$8,100.00
$8,100.00
$3,240.00
$4,860.00
0510-090-04-00NE
Branchburg Township
Whiton E.S.
The project is a replacement of the HVAC energy control sytem.
School Facility Project
Rehab of Existing Facility
Executed
$124,208.00
$124,208.00
$49,683.00
$74,525.00
0510-090-09-0ZXX
Branchburg Township
Whiton E.S.
New gym lighting.
School Facility Project
Rehab of Existing Facility
Executed
$8,139.00
$8,139.00
$3,255.60
$4,883.40
0530-020-02-0058
Brick Township
Brick Township H.S.
Auxillary Gym added
School Facility Project
Addition To Existing Facility
Executed
$859,430.20
$456,642.00
$182,656.80
$676,773.40
0530-020-03-0110
Brick Township
Brick Township H.S.
Replace four deficient roof sections
School Facility Project
Rehab of Existing Facility
Completed
$574,767.96
$574,767.96
$229,907.18
$344,860.18
0530-020-04-00SF
Brick Township
Brick Township H.S.
Roof Replacement
School Facility Project
Rehab of Existing Facility
Completed
$233,575.54
$233,575.54
$93,430.22
$140,145.32
0530-020-09-0IAY
Brick Township
Brick Township H.S.
Gym, main office, and lobby addition. Parking and bus loop upgrades. New interior lighting and electrical receptacles. Insulate water piping. Renovate media center.
School Facility Project
Rehab of Existing Facility
Offered
$47,085,943.00
$37,495,770.00
$14,998,308.00
$32,087,635.00
0530-020-09-0VAU
Brick Township
Brick Township H.S.
Installation of new ADA chairlift at exiting stairs on corridors at two locations
School Facility Project
Rehab of Existing Facility
Completed
$76,802.33
$76,802.33
$30,720.93
$46,081.40
0530-025-02-0057
Brick Township
Brick Township Memorial H.S.
Addition of classrooms, groop instruction spaces, science labs, cafeteria, offices; rehab to cafeteria, kitchen an shop areas.
School Facility Project
Addition and Rehab of Existing Facility
Completed
$7,853,993.96
$6,689,992.00
$2,675,996.80
$5,177,996.96
0530-025-09-00BS
Brick Township
Brick Township Memorial H.S.
Reconfigure classroom 170 into new main office, reconfigure corridor, relocate room 170 to ex-main office.
School Facility Project
Rehab of Existing Facility
Offered
$1,425,318.00
$1,425,318.00
$570,127.00
$855,191.00
0530-025-09-0ZLI
Brick Township
Brick Township Memorial H.S.
Provide HVAC in server rooms; Replace ceilings as required.
School Facility Project
Rehab of Existing Facility
Offered
$602,237.00
$602,237.00
$240,895.00
$361,342.00
0530-025-09-0ZWM
Brick Township
Brick Township Memorial H.S.
Replace gym bleachers and auditorium seats.
School Facility Project
Rehab of Existing Facility
Offered
$509,436.00
$509,436.00
$203,774.00
$305,662.00
0530-027-03-0111
Brick Township
Brick Comm. Prim. Learn.Ctr.
Parapet repair.
School Facility Project
Rehab of Existing Facility
Completed
$119,409.32
$71,170.00
$28,468.00
$90,941.32
0530-027-09-00CD
Brick Township
Brick Comm. Prim. Learn.Ctr.
Addition of (7) K classrooms; Upgrades to main office and nurse's office; Reconstruct canopy column enclosures; Upgrades to communications systems and electrical services.
School Facility Project
Rehab of Existing Facility
Offered
$4,453,643.00
$1,683,909.00
$673,564.00
$3,780,079.00
0530-030-09-00OP
Brick Township
Drum Point Road E.S.
Lobby/office addition. Renovate/relocate Main Office/Nurse/CST to classroom 13, library to old office and classroom 13 to old library and remove old CST office in ESL #31 including all finishes, walls, ceilings, lights, HVAC.
School Facility Project
Rehab of Existing Facility
Offered
$1,584,460.00
$1,218,608.00
$487,443.00
$1,097,017.00
0530-030-09-0ZLJ
Brick Township
Drum Point Road E.S.
Provide HVAC in computer server rooms; ceiling replacement associated with HVAC upgrades.
School Facility Project
Rehab of Existing Facility
Offered
$106,165.00
$106,165.00
$42,466.00
$63,699.00
0530-030-09-0ZLK
Brick Township
Drum Point Road E.S.
Replace gas piping and install water valves. Install lead filters in potable water.
School Facility Project
Rehab of Existing Facility
Offered
$73,747.00
$73,747.00
$29,499.00
$44,248.00
0530-035-02-0066
Brick Township
Emma Havens Young E.S.
Addition of elevator
School Facility Project
Rehab of Existing Facility
Completed
$203,420.45
$184,100.00
$73,640.00
$129,780.45
0530-035-09-0ZLL
Brick Township
Emma Havens Young E.S.
Replace gas piping and install water valves. Install lead filters in potable water.
School Facility Project
Rehab of Existing Facility
Offered
$98,510.00
$98,510.00
$39,404.00
$59,106.00
0530-035-09-0ZLM
Brick Township
Emma Havens Young E.S.
Provide HVAC in computer server rooms and ceiling replacement associated with HVAC upgrades.
School Facility Project
Rehab of Existing Facility
Offered
$129,629.00
$129,629.00
$51,852.00
$77,777.00
0530-035-09-0ZWN
Brick Township
Emma Havens Young E.S.
Replace existing library shelving.
School Facility Project
Rehab of Existing Facility
Offered
$324,951.00
$324,951.00
$129,980.00
$194,971.00
0530-040-02-0064
Brick Township
Hebertsville E.S.
Additions: Classrooms, New media/Library
School Facility Project
Addition and Rehab of Existing Facility
Completed
$683,600.00
$451,260.00
$180,504.00
$503,096.00
0530-040-09-0ZLO
Brick Township
Hebertsville E.S.
VAT replacement, install hot water connections to toilet rooms; Install lead filters and vaccum breakers on potable water system; Regrade elevations for storm water drainage.
School Facility Project
Rehab of Existing Facility
Offered
$62,102.00
$62,102.00
$24,841.00
$37,261.00
0530-040-09-0ZWO
Brick Township
Hebertsville E.S.
Replace existing chalk boards with new white boards.
School Facility Project
Rehab of Existing Facility
Offered
$97,478.00
$97,478.00
$38,991.00
$58,487.00
0530-040-09-0ZWP
Brick Township
Hebertsville E.S.
Upgrade lighting control system in all classrooms.
School Facility Project
Rehab of Existing Facility
Offered
$20,849.00
$20,849.00
$8,340.00
$12,509.00
0530-040-09-0ZWQ
Brick Township
Hebertsville E.S.
Replace existing gym light fixtures with new digitally controllable high efficiency light fixtures.
School Facility Project
Rehab of Existing Facility
Offered
$15,318.00
$15,318.00
$6,127.00
$9,191.00
0530-043-02-0060
Brick Township
Lake Riviera M.S.
Additions: Classrooms, science labs, small group instruction rooms, expanded cafeteria/all purpose room, elevator
School Facility Project
Addition To Existing Facility
Completed
$3,489,713.33
$3,463,800.00
$1,385,520.00
$2,104,193.33
0530-043-09-00UY
Brick Township
Lake Riviera M.S.
Vestibule/lobby addition, renovate/reconfigure main office/adminstrative/guidance/cst offices/entry.
School Facility Project
Rehab of Existing Facility
Offered
$790,407.00
$676,716.00
$270,686.00
$519,721.00
0530-043-09-0ZLN
Brick Township
Lake Riviera M.S.
Provide HVAC in computer server rooms and ceilig replacement associated with HVAC upgrades.
School Facility Project
Rehab of Existing Facility
Offered
$277,063.00
$277,063.00
$110,825.00
$166,238.00
0530-043-09-0ZWR
Brick Township
Lake Riviera M.S.
Replace gas piping and install water valves. Install lead filters in potable water. Renovate locker rooms.
School Facility Project
Rehab of Existing Facility
Offered
$1,550,782.00
$1,550,782.00
$620,313.00
$930,469.00
0530-045-09-00VL
Brick Township
Lanes Mill Road E.S.
Entry lobby addition - renovate/relocate IMC to old office and 2 classrooms to old IMC.
School Facility Project
Rehab of Existing Facility
Offered
$1,798,974.00
$1,664,000.00
$665,600.00
$1,133,374.00
0530-045-09-0ZLP
Brick Township
Lanes Mill Road E.S.
Install lead filters in potable water. Replace gas piping and provide water valves. Replace existing branch panels. New school intercom system.
School Facility Project
Rehab of Existing Facility
Offered
$791,696.00
$791,696.00
$316,678.00
$475,018.00
0530-045-09-0ZLQ
Brick Township
Lanes Mill Road E.S.
Provide HVAC in computer server rooms and ceiling replacement associated with HVAC upgrades.
School Facility Project
Rehab of Existing Facility
Offered
$121,457.00
$121,457.00
$48,583.00
$72,874.00
0530-045-09-0ZWS
Brick Township
Lanes Mill Road E.S.
Add parking spots in front for faculty and visitors.
School Facility Project
Rehab of Existing Facility
Offered
$182,553.00
$182,553.00
$73,021.00
$109,532.00
0530-060-02-0063
Brick Township
Midstreams E.S.
Additions: Classrooms, Library, Office complex. Existing library to be renovated into classrom
School Facility Project
Addition and Rehab of Existing Facility
Completed
$1,371,942.02
$1,186,800.00
$474,720.00
$897,222.02
0530-060-09-00VU
Brick Township
Midstreams E.S.
Cafeteria, kitchen, stage, toilet room addition. Remove existing stage and convert to gym.
School Facility Project
Rehab of Existing Facility
Offered
$4,503,732.00
$1,640,937.00
$656,375.00
$3,847,357.00
0530-060-09-0ZLR
Brick Township
Midstreams E.S.
Install lead filters in potable water. Replace gas piping and provide water valves. Repair exterior soffits, canopies, etc. Replace small plywood ramp at kitchen exterior door. Replace exit sign.
School Facility Project
Rehab of Existing Facility
Offered
$1,726,583.00
$1,726,583.00
$690,633.00
$1,035,950.00
0530-060-09-0ZLS
Brick Township
Midstreams E.S.
Provide HVAC in computer server rooms and ceiling replacement associated with upgrades.
School Facility Project
Rehab of Existing Facility
Offered
$97,518.00
$97,518.00
$39,007.00
$58,511.00
0530-070-02-0065
Brick Township
Osbornville E.S.
Additions: Classrooms, New media/Library, Small group instruction room. Existing library into Storage.
School Facility Project
Addition and Rehab of Existing Facility
Completed
$1,453,098.20
$1,138,500.00
$455,400.00
$997,698.20
0530-070-09-0WAK
Brick Township
Osbornville E.S.
Partial roof replacement
School Facility Project
Rehab of Existing Facility
Completed
$76,458.07
$76,458.07
$30,583.23
$45,874.84
0530-070-09-0ZLT
Brick Township
Osbornville E.S.
Install lead filters to potable water lines and vacuum breakers to mop sinks.
School Facility Project
Rehab of Existing Facility
Offered
$49,349.00
$49,349.00
$19,740.00
$29,609.00
0530-070-09-0ZLU
Brick Township
Osbornville E.S.
Provide HVAC in computer server rooms, replace existing domestic hot water heater.
School Facility Project
Rehab of Existing Facility
Offered
$84,789.00
$84,789.00
$33,916.00
$50,873.00
0530-070-09-0ZLV
Brick Township
Osbornville E.S.
Insulate all domestic hot and cold water piping and replace existing lighting controls.
School Facility Project
Rehab of Existing Facility
Offered
$93,566.00
$93,566.00
$37,426.00
$56,140.00
0530-080-02-0062
Brick Township
Veteran's Memorial E.S.
Additions: Classrooms, Kitchen - Rehab exisiting kitchen into storage space
School Facility Project
Addition and Rehab of Existing Facility
Completed
$1,928,280.92
$1,435,200.00
$574,080.00
$861,120.00
0530-080-04-0ANW
Brick Township
Veteran's Memorial E.S.
replace the entire roof of this building
School Facility Project
Rehab of Existing Facility
Completed
$893,206.20
$725,863.00
$290,345.20
$602,861.00
0530-080-09-00VV
Brick Township
Veteran's Memorial E.S.
Renovate/relocate existing main office and assistant principal's office and create secure vestibule and building entrance.
School Facility Project
Rehab of Existing Facility
Offered
$469,282.00
$469,282.00
$187,713.00
$281,569.00
0530-080-09-0ZLW
Brick Township
Veteran's Memorial E.S.
Install lead filters in potable water. Replace gas piping from meter to boilers. Replace gas piping and provide water valves.
School Facility Project
Rehab of Existing Facility
Offered
$55,479.00
$55,479.00
$22,192.00
$33,287.00
0530-080-09-0ZLX
Brick Township
Veteran's Memorial E.S.
Provide HVAC in computer server rooms and ceiling replacement associated with upgrades.
School Facility Project
Rehab of Existing Facility
Offered
$133,216.00
$133,216.00
$53,286.00
$79,930.00
0530-090-02-0061
Brick Township
Veteran's Memorial M.S.
Additions: Classroms, Science Labs, Small Group Instruction, Support and storage spaces
School Facility Project
Addition To Existing Facility
Completed
$2,207,316.75
$2,207,316.75
$882,926.70
$1,324,390.05
0530-090-03-0112
Brick Township
Veteran's Memorial M.S.
Remove and replace two deficient roof sections.
School Facility Project
Rehab of Existing Facility
Executed
$356,991.89
$350,987.00
$140,395.00
$216,596.89
0530-090-09-00AA
Brick Township
Veteran's Memorial M.S.
Renovate art room. Reconfigure main office and nurse area to create secure entrance and new nurse's suite.
School Facility Project
Rehab of Existing Facility
Offered
$1,607,665.00
$1,607,665.00
$643,066.00
$964,599.00
0530-090-09-0ZLY
Brick Township
Veteran's Memorial M.S.
Miscellaneous plumbing piping and valve replacement; provide proper kitchen hood and exhaust in existing cooking room. Place cable supports in ceiling.
School Facility Project
Rehab of Existing Facility
Offered
$269,965.00
$269,965.00
$107,986.00
$161,979.00
0530-090-09-0ZLZ
Brick Township
Veteran's Memorial M.S.
Provide HVAC in computer server rooms and ceiling replacement associated with HVAC upgrade. Provide HVAC in Special Ed room G7.
School Facility Project
Rehab of Existing Facility
Offered
$235,618.00
$235,618.00
$94,247.00
$141,371.00
0530-N01-02-0059
Brick Township
Educational Enrichment Complex
new construction including 8 classrooms, group instuction spaces, cafeteria, conference room, etc.
School Facility Project
New Construction
Completed
$3,985,908.92
$2,815,200.00
$1,126,080.00
$2,859,828.92
0530-N02-09-00CJ
Brick Township
Educational Enrichment Center
Convert existing SE School to ECC; Includes renovations and 12 classroom addition.
School Facility Project
Rehab of Existing Facility
Offered
$8,280,903.00
$3,898,088.00
$1,559,235.00
$6,721,668.00
0555-005-00-0185
Bridgewater-Raritan Regional
Bridgewater-Raritan H.S.
 
Retro
Addition and Rehab of Existing Facility
Completed
$19,660,000.00
$15,412,043.00
$6,164,817.20
$13,495,182.80
0555-010-04-0ACG
Bridgewater-Raritan Regional
Bridgewater-Raritan M.S.
Partial re-roofing
School Facility Project
Rehab of Existing Facility
Completed
$1,400,567.18
$1,400,567.18
$560,226.87
$840,340.31
0555-010-09-0XAF
Bridgewater-Raritan Regional
Bridgewater-Raritan M.S.
Partial unit ventilator replacement
School Facility Project
Rehab of Existing Facility
Executed
$880,160.57
$880,160.57
$352,064.00
$528,096.57
0555-010-09-0ZBS
Bridgewater-Raritan Regional
Bridgewater-Raritan M.S.
Install two (2) new toilets and two (2) new lavatories in the existing girls' locker room.
School Facility Project
Rehab of Existing Facility
Executed
$60,813.32
$57,643.00
$23,057.00
$37,756.32
0555-030-02-0665
Bridgewater-Raritan Regional
Adamsville E.S.
renovatons to nurses office and pre-k classroom
School Facility Project
Rehab of Existing Facility
Completed
$276,672.00
$276,672.00
$110,668.80
$166,003.20
0555-030-03-0263
Bridgewater-Raritan Regional
Adamsville E.S.
New construction includes two classrooms, three kindergarten classrooms, one multi-purpose classroom, five SGI's, faculty and student toilets. Rehab includes electrical and communications upgrades.
School Facility Project
Addition and Rehab of Existing Facility
Executed
$2,607,434.69
$1,872,503.00
$749,001.00
$1,858,433.69
0555-030-04-00UP
Bridgewater-Raritan Regional
Adamsville E.S.
Alterations to Existing Building
School Facility Project
Rehab of Existing Facility
Completed
$11,796.63
$11,796.63
$4,718.65
$7,077.98
0555-030-09-00AW
Bridgewater-Raritan Regional
Adamsville E.S.
Partial roof replacement.
School Facility Project
Rehab of Existing Facility
Completed
$860,349.50
$860,349.50
$344,140.00
$516,209.50
0555-040-02-0961
Bridgewater-Raritan Regional
Bradley Gardens E.S.
Partial reroofing project of 29,200 sf
School Facility Project
Rehab of Existing Facility
Completed
$250,005.00
$250,005.00
$100,002.00
$150,003.00
0555-040-03-0270
Bridgewater-Raritan Regional
Bradley Gardens E.S.
Rehabilitation includes electrical and communications upgrades.
School Facility Project
Rehab of Existing Facility
Completed
$99,560.00
$99,560.00
$39,824.00
$59,736.00
0555-045-03-0268
Bridgewater-Raritan Regional
Crim E.S.
Addition and alterations to existing building; new construction includes a new gymnasium, storage room and physical education instructors office. Rehab includes electrical and communications upgrades.
School Facility Project
Addition and Rehab of Existing Facility
Completed
$1,094,355.84
$773,454.00
$309,382.00
$784,973.84
0555-048-03-0267
Bridgewater-Raritan Regional
Eisenhower E.S.
New construction includes twelve classrooms, two multi-purpose classrooms, five SGI's, one Music Room, two music practice rooms, storage rooms, an auxiliary gymnasium w/stage, boys and girls gang toilet rooms, etc.
School Facility Project
New Construction
Executed
$7,357,751.19
$5,231,155.00
$2,092,462.00
$5,265,289.19
0555-048-04-00UU
Bridgewater-Raritan Regional
Eisenhower E.S.
Alterations to Existing Building
School Facility Project
Rehab of Existing Facility
Completed
$16,428.31
$16,428.31
$6,571.22
$9,857.09
0555-063-03-0266
Bridgewater-Raritan Regional
Hamilton E.S.
New Construction includes one Multi-Purpose classroom, three SGI's, one pre-school disabled classroom, five general classrooms, gymnasium w/storage room and boys and girls gang toilet rooms, etc.
School Facility Project
Addition and Rehab of Existing Facility
Executed
$3,410,545.29
$2,522,270.00
$1,008,908.00
$2,401,637.29
0555-065-03-0265
Bridgewater-Raritan Regional
Hillside E.S.
Addition of music rooms, all-purpose room, general classroom, SGIs, computer room, auxiliary gym with storage, etc. Renovations include conversion of locker rooms to music practice room and two SGIs, etc.
School Facility Project
Addition and Rehab of Existing Facility
Executed
$5,336,335.93
$1,580,574.00
$632,230.00
$4,704,105.93
0555-065-04-00UQ
Bridgewater-Raritan Regional
Hillside E.S.
Alterations to Existing Building
School Facility Project
Rehab of Existing Facility
Completed
$17,490.13
$17,490.13
$6,996.05
$10,494.08
0555-067-03-0264
Bridgewater-Raritan Regional
John F. Kennedy E.S.
Addition and alterations to existing building; new construction includes gymnasium with stage and storage room, boys and girls gang toilets and Physical Education Office. Renovations include converting two classrooms to a kindergarten, etc
School Facility Project
Addition and Rehab of Existing Facility
Executed
$1,359,514.59
$960,180.00
$384,072.00
$975,442.59
0555-105-03-0271
Bridgewater-Raritan Regional
Van Holten E.S.
Addition and alterations to existing building; new construction includes gymnasium with stage and storage room, boys and girls gang toilets and Physical Education Office. Rehab includes electrical and communications upgrades.
School Facility Project
Addition and Rehab of Existing Facility
Executed
$1,420,241.72
$1,004,710.00
$401,884.00
$1,018,357.72
0555-N01-03-0574
Bridgewater-Raritan Regional
Milltown Road E.S.
Land acquisition of 6+/-Acres from a partial of 17+/-Acress and construction of a New E.S. that is two stories high and is to house Pre-K to 4th grade. The facility has twenty-two general classrooms, three Kindergarten Classrooms, etc.
School Facility Project
New Construction
Executed
$12,773,751.65
$9,384,000.00
$3,753,600.00
$9,020,151.65
0560-020-01-0392
Brielle Borough
Brielle E.S.
Administration area classroom expansion/upgrade. Replace HVAC, mechanical, electrical and plumbing.
Waiver
Addition and Rehab of Existing Facility
Completed
$10,400,000.00
$8,710,730.00
$3,484,292.00
$6,915,708.00
0560-020-04-0ADG
Brielle Borough
Brielle E.S.
Existing mechanical system replacement in existing gymnasium
School Facility Project
Rehab of Existing Facility
Completed
$98,991.00
$98,991.00
$39,596.00
$59,395.00
0570-030-04-00KV
Brigantine City
Brigantine North School
Replace approximately 72,753 s.f. of existing roof system
Emergent
Rehab of Existing Facility
Completed
$459,368.88
$459,368.88
$183,747.55
$275,621.33
0580-010-01-0397
Brooklawn
Alice Costello E.S.
addition of gym and multipurpose room; rehab of windows, lighting, etc.
School Facility Project
Addition and Rehab of Existing Facility
Completed
$3,256,950.00
$2,900,850.00
$1,697,679.00
$1,559,271.00
0580-010-05-0AQQ
Brooklawn
Alice Costello E.S.
Replacement of doors, windows and boiler. (portion of approved project )
School Facility Project
Rehab of Existing Facility
Completed
$495,585.24
$495,585.24
$308,959.73
$186,625.51
0580-010-09-0ZRD
Brooklawn
Alice Costello E.S.
New toilet room in existing coat closet area for classroom reassignment to PK. Alternations to enlarge existing PK toilet room.
School Facility Project
Rehab of Existing Facility
Offered
$158,724.00
$158,724.00
$111,530.00
$47,194.00
0580-010-09-0ZRE
Brooklawn
Alice Costello E.S.
Replace plumbing system pipes and valves.
School Facility Project
Rehab of Existing Facility
Offered
$62,424.00
$62,424.00
$43,863.00
$18,561.00
0590-025-02-1205
Buena Regional
Buena Regional H.S.
auditorium/ stage lighting and sound system replacement
School Facility Project
Rehab of Existing Facility
Completed
$170,305.84
$170,305.84
$110,337.81
$59,968.03
0590-025-03-0840
Buena Regional
Buena Regional H.S.
Replacement of HVAC unit ventilators in "B" wing of HS.
School Facility Project
Rehab of Existing Facility
Completed
$467,794.45
$467,794.45
$303,075.14
$164,719.31
0590-025-03-0841
Buena Regional
Buena Regional H.S.
Replacement of approximately 1,100 student lockers.
School Facility Project
Rehab of Existing Facility
Completed
$165,141.21
$165,141.21
$106,991.85
$58,149.36
0590-045-99-0189
Buena Regional
Collings Lake E.S.
Addition to school
Retro
Addition To Existing Facility
Completed
$717,324.00
$717,324.00
$466,427.00
$250,897.00
0590-055-00-0258
Buena Regional
John C. Milanesi E.S.
Addition and Renovation of existing facility.
Retro
Addition and Rehab of Existing Facility
Completed
$1,739,699.00
$1,739,699.00
$1,131,207.96
$608,491.04
0590-055-02-0726
Buena Regional
John C. Milanesi E.S.
New 28,000 sf wood truss roof over existing built-up roof and window replacement in cafeteria.
School Facility Project
Rehab of Existing Facility
Executed
$526,019.58
$526,019.58
$353,467.80
$172,551.78
0590-N02-09-0JAM
Buena Regional
Buena Regional ECC
New early childhood center for 274 students - 19 new classrooms and 2 special education classrooms, admin offices, multipurpose room and various ancillary spaces.
School Facility Project
New Construction
Offered
$9,521,039.00
$5,523,375.00
$3,719,643.00
$5,801,396.00
0610-030-02-0499
Burlington County Vocational School District
Inst of Tech-Westampton
Fire alarm upgrade, auditorium asbestos removal, auditorium renovation.
School Facility Project
Addition and Rehab of Existing Facility
Completed
$24,981,028.00
$24,981,028.00
$9,992,411.00
$14,988,617.00
0610-040-02-0500
Burlington County Vocational School District
Inst of Tech-Medford Campus
Fire alarm system and partial renovation of 2 special ed. Classrooms
School Facility Project
Addition and Rehab of Existing Facility
Completed
$19,242,967.00
$19,242,967.00
$7,697,187.00
$11,545,780.00
0620-010-09-0ZFA
Burlington Township
Burlington Township H.S.
New security system and security hardware; Renovations to include ADA access to toilet rooms, Nurse's Suite and various spaces.
School Facility Project
Rehab of Existing Facility
Executed
$400,405.00
$400,405.00
$176,855.00
$223,550.00
0620-025-03-1071
Burlington Township
Thomas O. Hopkins M.S.
Addition and Renovation to accommodate Central Admin & classroom space. Other systems improvements
School Facility Project
Addition and Rehab of Existing Facility
Executed
$2,892,500.00
$2,892,500.00
$1,425,471.00
$1,467,029.00
0620-030-03-1072
Burlington Township
B. Bernice Young E.S.
District is adding 6 kindergarten and 12 first grade rooms to accommodate increased projected enrollment.
School Facility Project
Addition To Existing Facility
Completed
$3,890,741.84
$3,718,000.00
$1,832,291.00
$2,089,182.64
0620-030-04-0ANN
Burlington Township
B. Bernice Young E.S.
Replacement of existing boiler
School Facility Project
Rehab of Existing Facility
Executed
$276,574.49
$276,574.49
$136,300.33
$140,274.16
0620-030-05-0ANP
Burlington Township
B. Bernice Young E.S.
Expansion of the existing cafeteria
School Facility Project
Addition and Rehab of Existing Facility
Executed
$1,127,211.00
$738,285.00
$363,839.00
$763,372.00
0620-037-09-0ZFB
Burlington Township
Fountain Woods E.S.
Install security system ans security hardware.
School Facility Project
Rehab of Existing Facility
Executed
$99,608.00
$99,608.00
$43,996.00
$55,612.00
0620-N01-03-1073
Burlington Township
New Middle School
Construction of a new middle school
School Facility Project
New Construction
Completed
$28,829,863.78
$25,121,382.00
$12,380,229.00
$16,449,634.78
0630-020-02-0069
Butler
Butler H.S.
replacement of intercom/phone system for the Butler High School
School Facility Project
Rehab of Existing Facility
Completed
$50,150.00
$50,150.00
$20,060.00
$30,090.00
0630-020-02-0951
Butler
Butler H.S.
re-roofing
School Facility Project
Rehab of Existing Facility
Executed
$291,160.90
$291,160.90
$116,464.36
$174,696.54
0630-020-03-0942
Butler
Butler H.S.
Project consists of facility upgrades to the existing school building including replacement of interior and exterior doors; windoew replacement; removal of asbestos tile flooring; replacement of stair treads; ADA compliance, etc.
School Facility Project
Rehab of Existing Facility
Completed
$3,077,298.35
$3,077,298.35
$1,230,919.34
$1,846,379.01
0630-020-03-1437
Butler
Butler H.S.
The project consists of athletic field and faclity upgrades.
School Facility Project
Rehab of Existing Facility
Completed
$435,000.00
$428,000.00
$171,200.00
$263,800.00
0630-025-02-0070
Butler
Aaron Decker E.S.
intercom/phone system
School Facility Project
Rehab of Existing Facility
Completed
$24,675.00
$24,675.00
$9,870.00
$14,805.00
0630-025-02-0952
Butler
Aaron Decker E.S.
re-roofing
School Facility Project
Rehab of Existing Facility
Completed
$148,604.40
$148,604.40
$59,441.76
$89,162.64
0630-025-03-0943
Butler
Aaron Decker E.S.
The project consists of facility upgrades to the existing school building including: fire alarm replacement, exterior lighting, asbestos tile, floor removal, window replacement; ADA signage; ADA toilet.
School Facility Project
Rehab of Existing Facility
Completed
$1,709,152.79
$1,709,152.79
$683,661.12
$1,025,491.67
0630-025-09-0ZVI
Butler
Aaron Decker E.S.
Technology and security upgrades.
School Facility Project
Rehab of Existing Facility
Executed
$97,375.00
$97,375.00
$38,950.00
$58,425.00
0630-030-02-0071
Butler
Richard Butler E.S.
intercom/phone system
School Facility Project
Rehab of Existing Facility
Completed
$24,950.00
$24,950.00
$9,980.00
$14,970.00
0630-030-03-0799
Butler
Richard Butler E.S.
Provide an ADA-Compliant Egress Doorway and Walkway at the Richard Butler Elementary School.
School Facility Project
Rehab of Existing Facility
Completed
$32,300.00
$32,300.00
$12,920.00
$19,380.00
0630-030-03-0941
Butler
Richard Butler E.S.
This project consists of facility upgrades to the existing school building including replacement of fire alarm, removal of asbestos tile flooring, roof replacement; window replacement; ADA compliance including signage: toilet; hardware
School Facility Project
Rehab of Existing Facility
Completed
$2,555,049.76
$2,536,630.00
$1,014,652.00
$1,540,397.76
0630-030-09-0ZVJ
Butler
Richard Butler E.S.
Technology and security upgrades.
School Facility Project
Rehab of Existing Facility
Executed
$148,525.00
$148,525.00
$59,410.00
$89,115.00
0640-x01-01-0303
Byram Township
New K-5 E.S. (-x01)
 
Waiver
New Construction
Completed
$16,775,000.00
$11,523,000.00
$4,609,200.00
$12,165,800.00
0660-060-05-0ARX
Caldwell-West Caldwell
Grover Cleveland J.H.S.
Roof Replacement
Emergent
Rehab of Existing Facility
Completed
$99,900.00
$99,900.00
$39,960.00
$59,940.00
0660-070-02-0437
Caldwell-West Caldwell
Jefferson E.S.
Window replacement
School Facility Project
Rehab of Existing Facility
Completed
$95,700.00
$95,700.00
$38,280.00
$57,420.00
0660-070-03-0885
Caldwell-West Caldwell
Jefferson E.S.
Replacement of Roof Section.
School Facility Project
Rehab of Existing Facility
Completed
$49,460.45
$49,460.45
$19,784.18
$29,676.27
0660-070-04-00IS
Caldwell-West Caldwell
Jefferson E.S.
Roof replacement
Emergent
Rehab of Existing Facility
Completed
$421,162.50
$421,162.50
$168,465.00
$252,697.50
0660-120-02-0438
Caldwell-West Caldwell
Wilson E.S.
Window Replacement
School Facility Project
Rehab of Existing Facility
Completed
$310,750.00
$310,750.00
$124,300.00
$186,450.00
0660-120-04-00GB
Caldwell-West Caldwell
Wilson E.S.
Mold Remediation
Emergent
Rehab of Existing Facility
Completed
$148,744.42
$148,744.42
$59,497.77
$89,246.65
0660-120-04-00IT
Caldwell-West Caldwell
Wilson E.S.
Roof replacement
School Facility Project
Rehab of Existing Facility
Completed
$323,137.50
$323,137.50
$129,255.00
$193,882.50
0700-030-04-00PT
Camden County Vocational School District
Camden Co. Technical V.S. (Pennsauken)
Roof replacement of the 1926 Section(Academic Wing) totaling 32,750 sf.
School Facility Project
Rehab of Existing Facility
Executed
$432,300.00
$432,300.00
$229,780.00
$202,520.00
0710-050-02-1037
Cape May City
Cape May City E.S.
roof replacement
School Facility Project
Rehab of Existing Facility
Completed
$380,200.00
$380,200.00
$152,080.00
$228,120.00
0710-050-03-0061
Cape May City
Cape May City E.S.
replacement of acoustical wall treatment in pool and ceramic tile replacement in pool
School Facility Project
Rehab of Existing Facility
Completed
$77,969.00
$74,500.00
$29,800.00
$48,169.00
0710-050-03-0154
Cape May City
Cape May City E.S.
State Share Grant Request for non-educational rehabilitation project for boiler replacement with piping.
School Facility Project
Rehab of Existing Facility
Executed
$137,629.30
$137,629.30
$55,052.00
$82,577.30
0710-050-09-0ZEG
Cape May City
Cape May City E.S.
New card reader access system at (4) exterior locations and secondary entrances/exists. (3) new interior ceiling flushed cameras and tie them back into the existing monitor located in the main office.
School Facility Project
Rehab of Existing Facility
Executed
$46,250.00
$46,250.00
$18,500.00
$27,750.00
0715-020-04-00YU
Cape May County Special Services District
Alternative School H.S.
Replacement of the following systems totaling 33,027; 1981 roof, main electric service-underground conduit substation and switchgear, and HVAC mechanical system.
School Facility Project
Rehab of Existing Facility
Completed
$1,098,891.37
$1,093,579.00
$437,432.00
$656,147.00
0715-020-04-00YV
Cape May County Special Services District
Alternative School H.S.
Addition of basketball court, rehabilitation of faculty office and area into a Driver Ed classroom.
School Facility Project
Addition and Rehab of Existing Facility
Completed
$94,673.07
$86,954.00
$34,782.00
$59,891.07
0715-075-04-00YW
Cape May County Special Services District
George E. Bailey M.S.
Replacement of main electrical service(91,846 sf)
School Facility Project
Rehab of Existing Facility
Completed
$88,364.03
$84,333.00
$33,733.00
$54,631.03
0715-095-04-00YX
Cape May County Special Services District
Ocean Academy
Replacemnt of roof, main electric service, and HVAC mechanical system.
School Facility Project
Rehab of Existing Facility
Completed
$1,087,919.00
$1,087,919.00
$435,168.00
$652,751.00
0715-095-05-00YY
Cape May County Special Services District
Ocean Academy
Educational rehabilitation project to replace existing playground with new surface and equipment
School Facility Project
Rehab of Existing Facility
Completed
$151,178.00
$151,178.00
$60,471.00
$90,707.00
0720-030-03-0412
Cape May County Vocational School District
Cape May Co. Tech. H.S.
Rehab of 157,665 s.f. involving electrical distribution, HVAC, exterior closure and site improvements
School Facility Project
Rehab of Existing Facility
Completed
$2,819,672.28
$2,819,672.28
$1,127,868.91
$1,691,803.37
0740-n01-04-00GY
Carlstadt
Replacement of the Lindbergh School
The district proposed to close two schools and replaced this school with a larger school to accommodate all of the children in the district.
School Facility Project
New Construction
Executed
$25,055,592.28
$10,456,572.00
$4,182,629.00
$20,872,963.28
0745-050-09-0JAW
Carlstadt-East Rutherford Regional High School Dis
Henry P. Becton Regional H.S.
New windows, HVAC system, sprinkler system; Reconfiguration of existing guidance and study team office. Realignment of existing general classrooms and addition of special education and small group instruction classrooms.
School Facility Project
Addition To Existing Facility
Executed
$33,050,536.00
$27,701,390.00
$11,080,556.00
$21,969,980.00
0760-050-01-0474
Cedar Grove Township
Cedar Grove (Memorial) H.S.
rehabilitation for Health and Life Safety
School Facility Project
Rehab of Existing Facility
Executed
$1,091,069.18
$1,091,069.18
$436,427.67
$654,641.51
0760-050-02-0109
Cedar Grove Township
Cedar Grove (Memorial) H.S.
replacement of auditorium roof
School Facility Project
Rehab of Existing Facility
Completed
$322,000.00
$322,000.00
$128,800.00
$193,200.00
0760-050-09-0ZEO
Cedar Grove Township
Cedar Grove (Memorial) H.S.
Windor, door and roof replacements.
School Facility Project
Rehab of Existing Facility
Offered
$6,199,644.00
$6,199,644.00
$2,479,858.00
$3,719,786.00
0760-060-01-0475
Cedar Grove Township
North End E.S.
rehabilitation for H&S and ADA compliance
School Facility Project
Rehab of Existing Facility
Executed
$412,500.00
$412,500.00
$165,000.00
$247,500.00
0760-060-09-0ZEP
Cedar Grove Township
North End E.S.
Window, door and roof replacements.
School Facility Project
Rehab of Existing Facility
Offered
$1,393,280.00
$1,393,280.00
$557,312.00
$835,968.00
0760-090-01-0476
Cedar Grove Township
South End E.S.
rehab for H&S, and ADA compliance
School Facility Project
Rehab of Existing Facility
Executed
$240,000.00
$240,000.00
$96,000.00
$144,000.00
0760-090-09-0ZEQ
Cedar Grove Township
South End E.S.
Window, door and roof replacements.
School Facility Project
Rehab of Existing Facility
Offered
$1,770,067.00
$1,770,067.00
$708,027.00
$1,062,040.00
0760-090-09-0ZFF
Cedar Grove Township
South End E.S.
Partial roof replacement.
School Facility Project
Rehab of Existing Facility
Offered
$114,259.00
$114,259.00
$45,704.00
$68,555.00
0760-x01-01-0473
Cedar Grove Township
Ridge Road Middle School
rehab for H&S and an addition for educational adequacy
School Facility Project
Addition and Rehab of Existing Facility
Completed
$11,896,060.00
$7,762,400.00
$3,104,960.00
$8,791,100.00
0770-030-01-0131
Central Regional
Central Regional H.S.
New sewage pump station, install new electrical service panel and breakers. Replace roof and unit ventilators.
Waiver
Addition and Rehab of Existing Facility
Completed
$14,187,005.19
$14,187,005.19
$5,674,802.08
$8,512,203.11
0770-050-01-0130
Central Regional
Central Regional M.S.
 
Waiver
Addition and Rehab of Existing Facility
Completed
$4,793,329.00
$4,568,490.00
$1,827,396.00
$2,965,933.00
0785-010-00-0055
Chathams, Sch Dist Of The
Chatham H.S.
additions-various upgrades and renovations
Retro
Addition and Rehab of Existing Facility
Completed
$18,394,736.00
$8,514,499.00
$3,405,799.60
$14,988,936.40
0785-010-04-00SH
Chathams, Sch Dist Of The
Chatham H.S.
New roof at the High School.
School Facility Project
Rehab of Existing Facility
Completed
$468,136.25
$468,136.25
$187,254.50
$280,881.75
0785-010-09-00BR
Chathams, Sch Dist Of The
Chatham H.S.
Partial roof replacement.
School Facility Project
Rehab of Existing Facility
Completed
$959,378.33
$959,378.33
$383,751.00
$575,627.33
0785-030-00-0054
Chathams, Sch Dist Of The
Chatham M.S.
additions-various upgrades and renovations
Retro
Addition and Rehab of Existing Facility
Completed
$3,021,209.00
$1,804,086.00
$721,634.40
$2,299,574.60
0785-030-05-0ANX
Chathams, Sch Dist Of The
Chatham M.S.
Proposed additions and alternations to existing school as part of referendum project. A window replacement project is also planned as a second referendum question.
School Facility Project
Addition and Rehab of Existing Facility
Executed
$13,289,398.42
$8,241,977.00
$3,296,791.00
$9,992,607.42
0785-030-05-0ANY
Chathams, Sch Dist Of The
Chatham M.S.
Field replacement at Haas Field. This is a separate referendum question.
School Facility Project
Rehab of Existing Facility
Executed
$871,270.65
$421,000.00
$168,400.00
$702,870.65
0785-050-00-0053
Chathams, Sch Dist Of The
Lafayette E.S.
10,425 SF Addition, various/upgrades and replace roof
Retro
Rehab of Existing Facility
Completed
$2,728,658.00
$1,568,113.00
$627,245.20
$2,101,412.80
0785-050-02-0745
Chathams, Sch Dist Of The
Lafayette E.S.
Roof replacement
School Facility Project
Rehab of Existing Facility
Completed
$170,897.00
$170,897.00
$68,358.80
$102,538.20
0785-050-05-0ANZ
Chathams, Sch Dist Of The
Lafayette E.S.
Proposed additions and alternations to existing school as part of referendum project. Window replacement of Lafayette school is proposed as a second referendum question.
School Facility Project
Rehab of Existing Facility
Executed
$4,533,028.75
$2,985,122.00
$1,194,049.00
$3,338,979.75
0785-060-00-0152
Chathams, Sch Dist Of The
Milton Avenue E.S.
11,844 SF Additions and various upgrade/renovations
Retro
Addition and Rehab of Existing Facility
Completed
$2,850,595.00
$1,792,713.00
$717,085.20
$2,133,509.80
0785-060-05-0AOA
Chathams, Sch Dist Of The
Milton Avenue E.S.
Proposed replacement of existing boiler.
School Facility Project
Rehab of Existing Facility
Completed
$220,497.16
$220,497.16
$88,198.86
$132,298.30
0785-070-00-0052
Chathams, Sch Dist Of The
Washington Avenue E.S.
10,425 SF Addition and various upgrades/renovations
Retro
Addition and Rehab of Existing Facility
Completed
$255,038.00
$122,357.00
$48,942.80
$206,095.20
0785-070-05-0AOB
Chathams, Sch Dist Of The
Washington Avenue E.S.
Proposed additions and alterartions
School Facility Project
Rehab of Existing Facility
Executed
$5,474,965.00
$2,950,972.00
$1,180,389.00
$4,262,611.00
0785-080-00-0051
Chathams, Sch Dist Of The
Southern Boulvard E.S.
11,844 SF Addition and various upgrades/renovations
Retro
Addition and Rehab of Existing Facility
Completed
$3,228,201.00
$1,664,783.00
$665,913.20
$2,562,287.80
0785-x01-05-0AOC
Chathams, Sch Dist Of The
Chatham HS Cougar Field
Replacement of existing grass athletic field with artificial turf and drainage and resurfacing of existing track.
School Facility Project
Rehab of Existing Facility
Executed
$1,276,409.14
$608,000.00
$243,200.00
$1,033,209.14
0800-030-02-1045
Cherry Hill Township
Cherry Hill High-East H.S.
ADA toilet rooms renovations, library roof replacment and various canopy replacements, auditorium HVAC replacement, ADA rescue areas, ADA exterior door replacements, science room electrical upgrade, gym lighting replacement.
School Facility Project
Rehab of Existing Facility
Completed
$1,221,271.86
$1,139,570.00
$455,828.00
$765,443.86
0800-030-03-0501
Cherry Hill Township
Cherry Hill High-East H.S.
SFP = Telecommunications Replacement
School Facility Project
Rehab of Existing Facility
Completed
$114,558.00
$114,558.00
$45,823.00
$68,735.00
0800-030-03-1294
Cherry Hill Township
Cherry Hill High-East H.S.
Emergent Roof Project- Remove and dispose of old roof. Install instalation, roof drains, roof ladder, coping system and roofing system.
Emergent
Rehab of Existing Facility
Completed
$332,077.70
$332,077.70
$132,831.08
$199,246.62
0800-030-04-00SO
Cherry Hill Township
Cherry Hill High-East H.S.
Alteration of existing toilet rooms for improved health and safety and accessibility.
School Facility Project
Rehab of Existing Facility
Completed
$725,956.00
$725,956.00
$290,382.00
$435,574.00
0800-030-05-0APH
Cherry Hill Township
Cherry Hill High-East H.S.
HVAC,Sanitary Lift, Floor Finishes, auditorium renovations
School Facility Project
Rehab of Existing Facility
Executed
$8,346,955.57
$8,346,955.57
$3,338,782.23
$5,008,173.34
0800-030-05-0API
Cherry Hill Township
Cherry Hill High-East H.S.
Water coolers, toilet rooms, sanitary lift.
School Facility Project
Rehab of Existing Facility
Completed
$809,194.00
$809,194.00
$323,678.00
$485,516.00
0800-030-09-0ZDQ
Cherry Hill Township
Cherry Hill High-East H.S.
Replace existing built-up roof and provide masonry wall repairs.
School Facility Project
Rehab of Existing Facility
Offered
$620,493.00
$620,493.00
$248,197.00
$372,296.00
0800-040-02-0736
Cherry Hill Township
Cherry Hill High-West H.S.
Installaton of 12 security cameras inside and outside of building and peripheral equiptment
School Facility Project
Rehab of Existing Facility
Completed
$49,755.20
$44,530.56
$17,812.00
$31,943.20
0800-040-02-1044
Cherry Hill Township
Cherry Hill High-West H.S.
Telecommunications Replacement, ADA Exterior Door Replacements, ADA toilet room renovations, ADA accessible route improvements, ADA Area of Rescue, Exterior Stair Reconstruction, Storm Drainage Extension, ADA Accessible Entrance, etc.
School Facility Project
Rehab of Existing Facility
Completed
$972,907.38
$943,830.00
$377,532.00
$595,375.38
0800-040-05-0APJ
Cherry Hill Township
Cherry Hill High-West H.S.
Fire Alarms, clock system. HVAC, gym lighting
School Facility Project
Rehab of Existing Facility
Completed
$4,466,543.00
$4,466,543.00
$1,786,617.00
$2,679,926.00
0800-040-05-0APK
Cherry Hill Township
Cherry Hill High-West H.S.
Sanitary lift, toilet rooms
School Facility Project
Rehab of Existing Facility
Executed
$1,152,620.23
$1,152,620.23
$461,048.00
$691,572.23
0800-040-09-0ZDR
Cherry Hill Township
Cherry Hill High-West H.S.
Boys, girls and staff toilet room alterations for accessibility.
School Facility Project
Rehab of Existing Facility
Offered
$533,681.00
$533,681.00
$213,472.00
$320,209.00
0800-040-09-0ZRF
Cherry Hill Township
Cherry Hill High-West H.S.
Partial roof replacement.
School Facility Project
Rehab of Existing Facility
Offered
$388,633.00
$388,633.00
$155,453.00
$233,180.00
0800-058-05-0AME
Cherry Hill Township
A. Russell Knight E.S.
Renovations to existing building
School Facility Project
Addition and Rehab of Existing Facility
Executed
$565,150.04
$535,053.00
$214,021.20
$351,128.84
0800-058-05-0APL
Cherry Hill Township
A. Russell Knight E.S.
Toilet room renovations
School Facility Project
Rehab of Existing Facility
Completed
$156,365.09
$156,365.09
$62,546.04
$93,819.05
0800-060-05-0AOD
Cherry Hill Township
Alternative High School
Roof, doors and window replacement
School Facility Project
Rehab of Existing Facility
Completed
$1,143,032.16
$1,143,032.16
$457,212.86
$685,819.30
0800-062-02-1061
Cherry Hill Township
Barclay School
Installlation of new instrusion alarm, DHW Heater replacment, ADA Ext Door & ADA Int. door replacements.
School Facility Project
Rehab of Existing Facility
Executed
$94,564.00
$73,988.38
$29,595.35
$44,393.03
0800-062-05-0AOE
Cherry Hill Township
Barclay School
Replacement/Upgrade to telephone coomunication system.
School Facility Project
Rehab of Existing Facility
Completed
$28,568.91
$28,568.91
$11,427.56
$17,141.35
0800-067-02-1068
Cherry Hill Township
John A. Carusi M.S.
Telecommunications replacement, AHERA abatement, ADA stripes and signage and ADA door replacement.
School Facility Project
Rehab of Existing Facility
Completed
$124,001.02
$124,001.02
$49,600.41
$74,400.41
0800-067-05-0AMF
Cherry Hill Township
John A. Carusi M.S.
Windows and doors
School Facility Project
Rehab of Existing Facility
Executed
$178,169.15
$178,169.15
$71,267.66
$106,901.49
0800-067-05-0AOF
Cherry Hill Township
John A. Carusi M.S.
Renovate toilet facilities
School Facility Project
Rehab of Existing Facility
Completed
$541,715.90
$541,715.90
$216,686.36
$325,029.54
0800-067-09-0ZDS
Cherry Hill Township
John A. Carusi M.S.
Repair existing deteriorated masonry wall construction to provide structural stability and weather resistance and replace existing deteriorated wood soffits.
School Facility Project
Rehab of Existing Facility
Executed
$545,545.00
$545,545.00
$218,218.00
$327,327.00
0800-068-02-1075
Cherry Hill Township
Bret Harte E.S.
Connectivity, ADA stripes and signage and AHERA compliance issues.
School Facility Project
Rehab of Existing Facility
Completed
$7,877.31
$7,877.31
$3,150.92
$4,726.39
0800-068-05-0AMG
Cherry Hill Township
Bret Harte E.S.
Renovations to existing building.
School Facility Project
Rehab of Existing Facility
Completed
$35,279.26
$35,279.26
$14,111.70
$21,167.56
0800-068-09-0ZDT
Cherry Hill Township
Bret Harte E.S.
Electrical service and distribution upgrades.
School Facility Project
Rehab of Existing Facility
Offered
$458,123.00
$458,123.00
$183,249.00
$274,874.00
0800-069-02-0725
Cherry Hill Township
Clara Barton E.S.
conversions of classrooms
School Facility Project
Rehab of Existing Facility
Completed
$85,109.49
$50,962.00
$20,385.00
$64,724.49
0800-069-02-1060
Cherry Hill Township
Clara Barton E.S.
New ADA door replacement and installation of fiber optics for computers (connectivity)
School Facility Project
Rehab of Existing Facility
Completed
$41,046.98
$41,046.98
$16,418.79
$24,628.19
0800-069-05-0AOG
Cherry Hill Township
Clara Barton E.S.
Renovate toilet facilities, upgrades to telecom system
School Facility Project
Rehab of Existing Facility
Completed
$232,314.22
$232,314.22
$92,925.69
$139,388.53
0800-069-09-0ZDU
Cherry Hill Township
Clara Barton E.S.
Electrical service and distribution upgrades.
School Facility Project
Rehab of Existing Facility
Offered
$381,279.00
$381,279.00
$152,512.00
$228,767.00
0800-073-02-0357
Cherry Hill Township
Henry C. Beck M.S.
rehab of 2 toilet rooms
School Facility Project
Rehab of Existing Facility
Completed
$141,102.00
$141,102.00
$56,441.00
$84,661.00
0800-073-02-0722
Cherry Hill Township
Henry C. Beck M.S.
Conversions of classrooms
School Facility Project
Rehab of Existing Facility
Completed
$81,087.74
$47,305.25
$18,922.00
$62,165.74
0800-073-02-1064
Cherry Hill Township
Henry C. Beck M.S.
Installation of Telecommunications, gym lighting, ADA toilets and ADA doors
School Facility Project
Rehab of Existing Facility
Completed
$151,043.20
$151,043.20
$60,417.28
$90,625.92
0800-073-05-0AOH
Cherry Hill Township
Henry C. Beck M.S.
Replace exterior doors and windows
School Facility Project
Rehab of Existing Facility
Executed
$286,194.00
$286,194.00
$114,478.00
$171,716.00
0800-073-09-0ZDV
Cherry Hill Township
Henry C. Beck M.S.
Electrical service and distribution upgrades.
School Facility Project
Rehab of Existing Facility
Offered
$711,966.00
$711,966.00
$284,786.00
$427,180.00
0800-073-09-0ZDW
Cherry Hill Township
Henry C. Beck M.S.
Replace multi-zone rooftop HVAC system and related rooftop chilled water piping.
School Facility Project
Rehab of Existing Facility
Executed
$724,024.00
$724,024.00
$289,610.00
$434,414.00
0800-073-09-0ZDX
Cherry Hill Township
Henry C. Beck M.S.
Repair modified bitumen roof.
School Facility Project
Rehab of Existing Facility
Executed
$802,200.00
$802,200.00
$320,880.00
$481,320.00
0800-074-02-1076
Cherry Hill Township
Rosa International M.S.
ADA Area of Rescue Only
School Facility Project
Rehab of Existing Facility
Completed
$2,920.32
$2,920.32
$1,168.13
$1,752.19
0800-074-05-0ARC
Cherry Hill Township
Rosa International M.S.
Roof Replacement and gym lighting
School Facility Project
Rehab of Existing Facility
Executed
$514,667.00
$514,667.00
$205,867.00
$308,800.00
0800-074-09-0ZDY
Cherry Hill Township
Rosa International M.S.
Provide grading and drainage at enclosed courtyard to prevent storm runoff from flooding the adjacent spaces.
School Facility Project
Rehab of Existing Facility
Offered
$137,767.00
$137,767.00
$55,107.00
$82,660.00
0800-074-09-0ZRG
Cherry Hill Township
Rosa International M.S.
Replace Connecting Link Corridors between Administration Wing and Classroom Wing
School Facility Project
Rehab of Existing Facility
Executed
$663,640.00
$663,640.00
$265,456.00
$398,184.00
0800-075-05-0AQA
Cherry Hill Township
Horace Mann E.S.
Renovate toilet facilities and telecommunication system upgrade
School Facility Project
Rehab of Existing Facility
Completed
$224,971.44
$224,971.44
$89,988.58
$134,982.86
0800-083-05-0AQX
Cherry Hill Township
James F. Cooper E.S.
Renovations to existing building.
School Facility Project
Rehab of Existing Facility
Completed
$896,880.21
$896,880.21
$358,752.08
$538,128.13
0800-083-05-0AQY
Cherry Hill Township
James F. Cooper E.S.
Renovations to existing building.
School Facility Project
Rehab of Existing Facility
Executed
$174,088.97
$174,088.97
$69,635.59
$104,453.38
0800-083-09-0ZDZ
Cherry Hill Township
James F. Cooper E.S.
Electrical service and distribution upgrades.
School Facility Project
Rehab of Existing Facility
Offered
$386,865.00
$386,865.00
$154,746.00
$232,119.00
0800-085-05-0AMH
Cherry Hill Township
James Johnson E.S.
Replace doors, telecom system, roof
School Facility Project
Rehab of Existing Facility
Executed
$1,018,732.57
$1,018,732.57
$407,493.03
$611,239.54
0800-085-05-0AMI
Cherry Hill Township
James Johnson E.S.
Renovate toilet facilities
School Facility Project
Rehab of Existing Facility
Completed
$205,469.90
$205,469.90
$82,187.96
$123,281.94
0800-100-02-0360
Cherry Hill Township
Joseph D. Sharp E.S.
Rehab of a storage room into a toilet room
School Facility Project
Rehab of Existing Facility
Completed
$39,968.00
$39,968.00
$15,987.00
$23,981.00
0800-100-03-1295
Cherry Hill Township
Joseph D. Sharp E.S.
Emergent Roof Project - Remove and dispose of old roof. Provide and install layers of insulation
Emergent
Rehab of Existing Facility
Completed
$232,077.35
$232,077.35
$92,830.94
$139,246.41
0800-100-05-0AOI
Cherry Hill Township
Joseph D. Sharp E.S.
Replace existing roof, upgrade to telephone intercom system.
School Facility Project
Rehab of Existing Facility
Completed
$436,337.88
$436,337.88
$174,535.15
$261,802.73
0800-100-05-0AQZ
Cherry Hill Township
Joseph D. Sharp E.S.
Renovate toilet facilities
School Facility Project
Rehab of Existing Facility
Executed
$188,009.45
$188,009.45
$75,203.78
$112,805.67
0800-105-02-1079
Cherry Hill Township
Joyce Kilmer E.S.
rehabilitation of connectivity
School Facility Project
Rehab of Existing Facility
Completed
$7,644.70
$7,644.70
$3,057.88
$4,586.82
0800-105-05-0AOJ
Cherry Hill Township
Joyce Kilmer E.S.
Upgrade to telephone intercom systems, renovate toilets, rooms, and classroom finishes.
School Facility Project
Rehab of Existing Facility
Completed
$336,862.87
$336,862.87
$134,745.15
$202,117.72
0800-105-09-0AEA
Cherry Hill Township
Joyce Kilmer E.S.
Electrical service and distribution upgrades.
School Facility Project
Rehab of Existing Facility
Offered
$481,809.00
$481,809.00
$192,724.00
$289,085.00
0800-110-02-1080
Cherry Hill Township
Kingston E.S.
rehabilitation of connectivity
School Facility Project
Rehab of Existing Facility
Completed
$7,691.12
$7,691.12
$3,076.45
$4,614.67
0800-110-05-0AMJ
Cherry Hill Township
Kingston E.S.
Renovations to existing building
School Facility Project
Rehab of Existing Facility
Completed
$241,281.40
$241,281.40
$96,512.56
$144,768.84
0800-110-09-0ZRH
Cherry Hill Township
Kingston E.S.
Replace boiler.
School Facility Project
Rehab of Existing Facility
Executed
$414,344.00
$414,344.00
$165,738.00
$248,606.00
#Rows On Page: 501
$979,255,089.02
$771,842,242.07
$322,416,316.71
$656,458,933.73
#Rows On Report: 3691
$8,082,549,435.86
$6,143,564,193.99
$2,605,810,826.33
$5,478,967,610.58
Report Was Generated on 2/7/2012 8:12:35 PM Version .Net 7.1.200001