|| <<Schools Home
  
    
   
Page: 1 
Abbott Grant Projects
0540-020-02-1065
Bridgeton
Bridgeton Senior H.S.
Gymnasium Floor replacement
School Facility Project
Rehab of Existing Facility
Completed
$307,967.02
$307,967.02
$307,967.02
$0.00
0540-020-02-1171
Bridgeton
Bridgeton Senior H.S.
Room J5 existing auto shop Conversion to High School health Center.
School Facility Project
Rehab of Existing Facility
Completed
$150,462.96
$150,462.96
$150,462.96
$0.00
0540-050-01-0747
Bridgeton
Buckshutem Road E.S. - G. Foster ECC
TCUs for Buckshutem E.S. addition 0540-050-01-0524
Other
Temporary Classroom Unit
Completed
$331,245.54
$331,245.54
$331,245.54
$0.00
0540-130-02-0742
Bridgeton
West Avenue E.S.
Chiller replacement
School Facility Project
Rehab of Existing Facility
Completed
$118,498.18
$118,498.18
$118,498.18
$0.00
0680-030-03-1285
Camden City
Camden H.S.
Replacement of gym flooring and storm drainage
School Facility Project
Rehab of Existing Facility
Completed
$311,168.00
$311,168.00
$311,168.00
$0.00
0680-030-03-1296
Camden City
Camden H.S.
Replacement of Exisiting old Steam (HVAC) units with new gas fired Units
School Facility Project
Rehab of Existing Facility
Completed
$388,177.50
$388,177.50
$388,177.50
$0.00
0680-040-03-1287
Camden City
Woodrow Wilson H.S.
Replacement of gym flooring, replacement and repair of underground drainage and replacement of fencing.
School Facility Project
Rehab of Existing Facility
Completed
$417,690.00
$417,690.00
$417,690.00
$0.00
0680-040-03-1297
Camden City
Woodrow Wilson H.S.
Replacement of existing old steam (HVAC) units with gas fired HVAC units.
School Facility Project
Rehab of Existing Facility
Completed
$390,203.25
$390,203.25
$390,203.25
$0.00
0680-100-03-1286
Camden City
Bonsall E.S.
Replacement of Existing Unsafe Fencing with new fencing
School Facility Project
Rehab of Existing Facility
Completed
$88,400.50
$88,400.50
$88,400.50
$0.00
0680-140-01-0939
Camden City
Octavius V. Catto Community School
Demonstration Project - replacement of existing Catto ES on new site - SCC to provide funding for school spaces
School Facility Project
New Construction
Executed
$77,005,823.00
$72,010,212.00
$72,010,212.00
$4,995,611.00
0680-175-03-1334
Camden City
Riletta T. Cream E.S.
Replacement of unsafe playground equipment and subsurface material to bring in compliance with CPSC Playground safety guidelines
School Facility Project
Rehab of Existing Facility
Completed
$44,220.00
$44,220.00
$44,220.00
$0.00
0680-230-03-1328
Camden City
McGraw E.S.
Replacement of unsafe Playground Equipment and surface materials to bring in compliance with CPSC Playground.
School Facility Project
Rehab of Existing Facility
Completed
$33,260.50
$33,260.50
$33,260.50
$0.00
0680-250-03-1329
Camden City
Raphael Cordero Molina E.S.
Replacement of existing unsafe playground equipment and subsurface materials
School Facility Project
Rehab of Existing Facility
Completed
$44,220.00
$44,220.00
$44,220.00
$0.00
0680-310-03-1330
Camden City
Sumner E.S.
Replacement of existing unsafe playground equipment and subsurface materials
School Facility Project
Rehab of Existing Facility
Completed
$41,990.00
$41,990.00
$41,990.00
$0.00
0680-320-03-1331
Camden City
U.S. Wiggins E.S.
Replacement of existing unsafe playground equipment and subsurface materials
School Facility Project
Rehab of Existing Facility
Completed
$49,614.50
$49,614.50
$49,614.50
$0.00
0680-360-03-1332
Camden City
Yorkship E.S.
Replacement of existing unsafe playground equipment and subsurface materials
School Facility Project
Rehab of Existing Facility
Completed
$74,447.00
$74,447.00
$74,447.00
$0.00
1210-030-05-0AQM
East Orange
East Orange Campus 9 (aka Clifford J. Scott HS)
Science Lab Table Replacement.
School Facility Project
Rehab of Existing Facility
Executed
$0.00
$0.00
$0.00
$0.00
1210-N01-04-000B
East Orange
Performing Arts School
New PreK-12 performing arts school - demonstration project
School Facility Project
New Construction
Executed
$142,970,533.00
$142,970,533.00
$142,970,533.00
$0.00
1320-100-03-0836
Elizabeth
Number 2, Winfield Scott E.S.
Remodeling of classrooms or TCUs to accommodate students that will be unhoused in the 2003-04 school year
School Facility Project
Rehab of Existing Facility
Completed
$240,000.00
$240,000.00
$240,000.00
$0.00
1320-150-00-0500
Elizabeth
Number 12, Elmora E.S.
Replace/Upgrade exit signs and egress lighting
Health & Safety
Rehab of Existing Facility
Completed
$9,575.00
$9,575.00
$9,575.00
$0.00
1320-210-00-0514
Elizabeth
Number 18, Robert Morris E.S.
Repl. Exit Doors, Sec Grills, Gates, Ent. Canopy, Exterior Sills, Lintels & Exit Lighting & B/Upower
Health & Safety
Rehab of Existing Facility
Completed
$240,707.00
$240,707.00
$240,707.00
$0.00
1700-050-04-00ER
Garfield
Garfield H.S.
1) Replacement of a 1956 Titusville steam boiler & two steam hot water heat exchangers in the boiler room. 2) Also all fuel oil piping to the burners & the above ground oil tanks should be removed.
School Facility Project
Rehab of Existing Facility
Completed
$152,820.00
$152,820.00
$152,820.00
$0.00
1700-100-04-00NX
Garfield
Roosevelt E.S.
Oil tank removal.
School Facility Project
Rehab of Existing Facility
Completed
$115,161.55
$115,161.55
$115,161.55
$0.00
1700-120-04-00NZ
Garfield
Washington Irving E.S.
Clean/remove underground oil tank, replace/compact soil, repair/replace asphalt, install new gas lines, replace one blower motor for boiler.
School Facility Project
Rehab of Existing Facility
Completed
$117,461.17
$117,461.17
$117,461.17
$0.00
1700-130-04-00NW
Garfield
Woodrow Wilson E.S.
Clean and remove underground oil tank, replace and compact soil, repair and replace asphalt, install new gas lines, replace two blower motors for boiler.
School Facility Project
Rehab of Existing Facility
Completed
$110,114.98
$110,114.98
$110,114.98
$0.00
1770-100-00-0284
Gloucester City
Mary E. Costello E.S.
Install owner supplied ADA wheelchair lift
School Facility Project
Rehab of Existing Facility
Completed
$32,950.00
$32,950.00
$32,950.00
$0.00
1770-160-01-1078
Gloucester City
Cold Springs E.S.
Life safety upgrades
Health & Safety
Rehab of Existing Facility
Completed
$284,453.00
$284,453.00
$284,453.00
$0.00
1770-910-01-1077
Gloucester City
Highland Park School
Life safety upgrades
Health & Safety
Rehab of Existing Facility
Completed
$255,566.00
$255,566.00
$255,566.00
$0.00
2330-050-01-0886
Irvington Township
Irvington H.S.
Remove existing boiler, rent and install temporary boiler.
School Facility Project
Rehab of Existing Facility
Completed
$336,533.28
$336,533.28
$336,533.28
$0.00
2330-050-03-0887
Irvington Township
Irvington H.S.
Replace temporary boilers with permanent boilers.
School Facility Project
Rehab of Existing Facility
Completed
$636,368.75
$636,368.75
$636,368.75
$0.00
2330-110-01-0885
Irvington Township
Grove Street E.S.
Replacement of condensate pump.
School Facility Project
Rehab of Existing Facility
Completed
$44,285.00
$44,285.00
$44,285.00
$0.00
2330-120-04-000J
Irvington Township
Madison Avenue E.S.
Replacement of condensate pump
School Facility Project
Rehab of Existing Facility
Completed
$18,340.00
$18,340.00
$18,340.00
$0.00
2330-135-04-00RT
Irvington Township
University M.S.
Rehabilitation or replacement of the existing roof system.
School Facility Project
Rehab of Existing Facility
Completed
$410,966.72
$410,966.72
$410,966.72
$0.00
2330-137-03-0795
Irvington Township
University Six School
Replacement of condensate pump.
School Facility Project
Rehab of Existing Facility
Completed
$60,340.00
$60,340.00
$60,340.00
$0.00
2330-140-01-1037
Irvington Township
Union Avenue M.S.
Renovations to existing facility
Health & Safety
Rehab of Existing Facility
Completed
$126,397.82
$126,397.82
$126,397.82
$0.00
2330-140-03-0794
Irvington Township
Union Avenue M.S.
Replacement of condensate pump
School Facility Project
Rehab of Existing Facility
Completed
$42,600.00
$42,600.00
$42,600.00
$0.00
2330-140-04-00RQ
Irvington Township
Union Avenue M.S.
Rehabilitation or replacement of existing roof system.
School Facility Project
Rehab of Existing Facility
Completed
$424,967.85
$424,967.85
$424,967.85
$0.00
2390-075-00-0694
Jersey City
Dr. Ronald E. Mc Nair/Academic H.S.
Repair/Replace roof drains, Repair/Replace exterior doors and hardware, Interior ceiling and wall plaster finish repairs
Health & Safety
Rehab of Existing Facility
Completed
$300,300.09
$300,300.09
$300,300.09
$0.00
2390-085-01-1186
Jersey City
Number 1 E.S.
Repointing of brick and stone masonry walls, Roof repairs, New interior door hardware at fire stairs, Interior ceiling and wall plaster finish repairs, New exterior exit lights
Health & Safety
Rehab of Existing Facility
Completed
$627,575.32
$627,575.32
$627,575.32
$0.00
2390-100-01-1255
Jersey City
Frank R. Conwell No. 3 E.S.
Repair/Replace rusted window frames, Masonry repairs to exterior of building, Roof repairs, New emergency lighting, Repair wood stairs at entrance, Weather-stripping and saddles at rear doors, Painting interior surfaces
Health & Safety
Rehab of Existing Facility
Completed
$700,087.64
$700,087.64
$700,087.64
$0.00
2390-140-01-1040
Jersey City
Martin Luther King, Jr. No. 11 ES
New door frames and hardware at interior fire stairs, New magnetic locks at exterior doors, Refinish exterior concrete, Repair/Replace quarry tiles
Health & Safety
Rehab of Existing Facility
Completed
$540,276.77
$540,276.77
$540,276.77
$0.00
2390-190-01-1189
Jersey City
Number 20 E.S.
Life Safety Improvements & Bldg Integrity Improvements
Health & Safety
Rehab of Existing Facility
Completed
$565,516.31
$565,516.31
$565,516.31
$0.00
2390-260-01-1190
Jersey City
Number 29 E.S.
Replacement and pointing of exterior bricks, New exit signs, Upgrade emergency lighting, New handrails at entrance stairs, Replacement of doors and hardware, Painting interior surfaces, Testing and abatement of asbestos and lead materials
Health & Safety
Rehab of Existing Facility
Completed
$651,948.55
$651,948.55
$651,948.55
$0.00
2390-270-01-1191
Jersey City
Number 33 E.S.
Life Safety Improvements & Other Renovations
Health & Safety
Rehab of Existing Facility
Completed
$418,307.74
$418,307.74
$418,307.74
$0.00
2390-360-01-1106
Jersey City
Joseph H. Brensinger No. 17 E.S.
Roof repairs, Replace exterior bricks, Install magnetic lock system at exterior doors
Health & Safety
Rehab of Existing Facility
Completed
$15,005.73
$15,005.73
$15,005.73
$0.00
2390-912-01-1187
Jersey City
P.S. #35 JC Learning Ctr
Replacement and pointing of exterior bricks, Roof repairs, New interior door hardware at fire stairs, Interior ceiling and wall plaster finish repairs
Health & Safety
Rehab of Existing Facility
Completed
$312,134.02
$312,134.02
$312,134.02
$0.00
2400-010-07-0EAA
Keansburg Borough
Keansburg H.S.
Remove original outdated and inefficient boilers and replace with high efficiency boilers and related equipment.
School Facility Project
Rehab of Existing Facility
Executed
$771,656.00
$771,656.00
$771,756.00
$0.00
2400-030-02-0299
Keansburg Borough
Joseph R. Bolger Middle School
New 66 space parking lot, curbing, sidewalks and related site drainage improvements.
School Facility Project
Addition To Existing Facility
Completed
$367,017.00
$367,017.00
$367,017.00
$0.00
2400-030-04-0AKQ
Keansburg Borough
Joseph R. Bolger Middle School
Provide and install new boiler to supplement existing boiler
School Facility Project
Rehab of Existing Facility
Executed
$129,746.00
$129,746.00
$129,746.00
$0.00
2770-085-98-0202
Long Branch
Joseph M. Ferraina Childhood Lrn Ct
New ECC
School Facility Project
New Construction
Completed
$7,036,414.00
$5,906,400.00
$5,906,400.00
$1,130,014.00
3230-050-04-00NV
Millville
Millville Senior H.S.
Gymnasium floor and bleecher replacement.
School Facility Project
Rehab of Existing Facility
Completed
$263,700.00
$263,700.00
$263,700.00
$0.00
3230-100-00-0633
Millville
Silver Run E.S.
new vinyl flooring to replace the existing carpet
Health & Safety
Rehab of Existing Facility
Completed
$290,449.50
$290,449.50
$290,449.50
$0.00
3230-100-03-0114
Millville
Silver Run E.S.
Carpet replacement with VCT
School Facility Project
Rehab of Existing Facility
Completed
$68,415.00
$68,415.00
$68,415.00
$0.00
3510-050-00-0274
Neptune Township
Neptune Senior H.S.
New elevator and handicap accessible restroom
School Facility Project
Addition To Existing Facility
Completed
$411,607.53
$411,607.53
$411,607.53
$0.00
3510-050-01-0679
Neptune Township
Neptune Senior H.S.
Conversion of industrial arts into 3 classrooms
School Facility Project
Rehab of Existing Facility
Completed
$206,600.00
$206,600.00
$206,600.00
$0.00
3510-501-02-0139
Neptune Township
Early Childhood
early childhood space
Other
Temporary Classroom Unit
Completed
$12,000.00
$12,000.00
$12,000.00
$0.00
3530-050-02-0906
New Brunswick
New Brunswick H.S.
Removal of existing VAT in Instructional Spaces and installation of new VCT
School Facility Project
Rehab of Existing Facility
Completed
$295,884.90
$295,884.90
$295,884.90
$0.00
3530-050-02-1014
New Brunswick
New Brunswick H.S.
Removal of Existing VAT in Non-Instructional Spaces and install of new VCT
School Facility Project
Rehab of Existing Facility
Completed
$138,910.53
$138,910.53
$138,910.53
$0.00
3530-050-03-0819
New Brunswick
New Brunswick H.S.
Replacement of HVAC in Kitchen, Cafeteria and Auditorium
School Facility Project
Rehab of Existing Facility
Completed
$500,737.26
$500,737.26
$500,737.26
$0.00
3530-050-03-1442
New Brunswick
New Brunswick H.S.
Install new P/A & clock system for HS
School Facility Project
Rehab of Existing Facility
Completed
$156,842.79
$156,842.79
$156,842.79
$0.00
3530-060-03-1168
New Brunswick
A. Chester Redshaw E.S.
Relocation of 4 TCU's for Early Childhood program from Woodrow Wilson site to Comstock Ave (across from A Chester Redshaw)
Other
Temporary Classroom Unit
Completed
$293,148.46
$293,148.46
$293,148.46
$0.00
3530-110-03-1173
New Brunswick
McKinley Community E.S.
Roof replacement
School Facility Project
Rehab of Existing Facility
Completed
$96,075.00
$96,075.00
$96,075.00
$0.00
3530-123-03-1174
New Brunswick
Paul Robeson Community E.S.
Roof replacement
School Facility Project
Rehab of Existing Facility
Completed
$230,275.00
$230,275.00
$230,275.00
$0.00
3530-140-03-0824
New Brunswick
Woodrow Wilson E.S.
Relocation of 4 TCUs from Lord Stirling site to Woodrow Wilson ES
Other
Temporary Classroom Unit
Completed
$286,304.09
$286,304.09
$286,304.09
$0.00
3530-140-03-1042
New Brunswick
Woodrow Wilson E.S.
Roof Replacement
School Facility Project
Rehab of Existing Facility
Completed
$379,212.00
$379,212.00
$379,212.00
$0.00
3530-N05-03-0791
New Brunswick
New New Brunswick HS
Demonstration Project - Construction of a new high school.
School Facility Project
New Construction
Executed
$185,203,730.00
$185,203,730.00
$185,203,730.00
$0.00
3570-200-03-0393
Newark
Ann Street E.S.
Rehab of existing fire escape
School Facility Project
Rehab of Existing Facility
Completed
$238,320.50
$238,320.50
$238,320.50
$0.00
3570-520-03-0400
Newark
McKinley E.S.
Rehabilitation of fire escapes which is deteriorating to the point that it has become an emergent situation.
School Facility Project
Rehab of Existing Facility
Completed
$124,567.62
$124,567.62
$124,567.62
$0.00
3880-060-00-9659
City Of Orange Township
Central E.S.
Grant provided for Repair exterior brick wall, Repair Roof, Replace exterior exit doors and hardware. Upgrade lighting, Replace condensate pump
Health & Safety
Rehab of Existing Facility
Completed
$782,800.00
$782,800.00
$782,800.00
$0.00
3880-080-01-1055
City Of Orange Township
Forest Street E.S.
Renovations to doors, HVAC boilers, lights, fire alarm & electrical upgrade.
Health & Safety
Rehab of Existing Facility
Completed
$220,354.50
$220,354.50
$220,354.50
$0.00
3880-090-01-9056
City Of Orange Township
Heywood Avenue E.S.
Grant to replace windows in Gym
Health & Safety
Rehab of Existing Facility
Completed
$50,700.00
$50,700.00
$50,700.00
$0.00
3880-110-01-1036
City Of Orange Township
Oakwood Avenue E.S.
Renovations to existing facility
Health & Safety
Rehab of Existing Facility
Completed
$212,700.00
$212,700.00
$212,700.00
$0.00
3970-050-04-00ML
Passaic City
Passaic H.S.
Tunnel Gas Piping System Replacement of the gas distribution system and repair of the steam delivery system.
School Facility Project
Rehab of Existing Facility
Completed
$106,575.00
$106,575.00
$106,575.00
$0.00
3970-080-03-0350
Passaic City
Number 1, Thomas Jefferson E.S.
After wind damage, evaluate and repair/replace dome roof at Number 1 Thomas Jefferson ES
School Facility Project
Rehab of Existing Facility
Completed
$4,000.00
$4,000.00
$4,000.00
$0.00
4010-030-04-00MO
Paterson
John F. Kennedy H.S.
Installations of temporary classroom units for special education instruction.
School Facility Project
New Construction
Completed
$1,072,599.00
$1,072,599.00
$1,072,599.00
$0.00
4010-040-04-00MQ
Paterson
Eastside H.S.
Installation of temporary classroom units for special education instruction.
School Facility Project
New Construction
Completed
$1,299,267.00
$1,299,267.00
$1,299,267.00
$0.00
4010-060-04-000D
Paterson
Number 2 E.S.
Remediate lead paint
School Facility Project
Rehab of Existing Facility
Completed
$57,305.00
$57,305.00
$57,305.00
$0.00
4050-050-04-00LR
Pemberton Township
Helen A. Fort M.S.
Corrections of chilled water piping as it relates to the 2 temperature loops and the chiller supply and return piping to the tanks to enable the ice making function. Replacement of undersized piping insulation.
School Facility Project
Rehab of Existing Facility
Completed
$693,123.00
$693,123.00
$693,123.00
$0.00
4050-055-04-00BN
Pemberton Township
Pemberton Twp. H.S.
Section 13A grant request - This is an Emergent Project. The District is reparing the HVAC for the Curriculum Center which used to be the media center.
School Facility Project
Rehab of Existing Facility
Completed
$476,170.00
$476,170.00
$476,170.00
$0.00
4050-125-04-00LC
Pemberton Township
Aletta Crichton E.S.
Renovations which include repair of entry canopy and replacement of multipurpose lighting
School Facility Project
Rehab of Existing Facility
Completed
$153,725.00
$153,725.00
$153,725.00
$0.00
4090-050-03-0800
Perth Amboy
Perth Amboy H.S.
Installation of TCU at Existing High School to help alleviate existing and increased overcrowding at the present High School.
Other
Temporary Classroom Unit
Completed
$270,535.00
$270,535.00
$270,535.00
$0.00
4090-070-00-0449
Perth Amboy
Anthony V. Ceres E.S.
Rehab of existing facility
Health & Safety
Rehab of Existing Facility
Completed
$64,592.00
$64,592.00
$64,592.00
$0.00
4090-150-04-00LT
Perth Amboy
Samuel E. Shull M.S.
Replacement of boys and girls gym lockers. The current lockers are original to the building and are over 15 years old.
School Facility Project
Rehab of Existing Facility
Completed
$76,264.65
$76,264.65
$76,264.65
$0.00
4090-E02-02-0092
Perth Amboy
Early Childhood Center I - Ignacio Cruz
Perth Amboy to lease existing St. Mary's School from the Arch Diocese of Metuchen to house early childhood program.
Other
Temporary Classroom Unit
Completed
$1,500,000.00
$1,500,000.00
$1,500,000.00
$0.00
4090-X01-04-00CI
Perth Amboy
Temporary Swing Space
Temporary Early Childhood Education space needs for project # 4090-E01-01-1724 and ECC # II.
Other
Temporary Classroom Unit
Completed
$429,750.24
$429,750.24
$429,750.24
$0.00
4100-050-01-0541
Phillipsburg
Phillipsburg H.S.
6 TCU's for HS Swing Space
Other
Temporary Classroom Unit
Completed
$1,889,012.95
$1,889,012.95
$1,889,012.95
$0.00
4100-060-01-0544
Phillipsburg
Andover-Morris E.S.
1 TCU for Swing Space
Other
Temporary Classroom Unit
Completed
$50,636.00
$50,636.00
$50,636.00
$0.00
4100-070-01-0543
Phillipsburg
Barber E.S.
1 TCU for Swing Space
Other
Temporary Classroom Unit
Completed
$50,636.00
$50,636.00
$50,636.00
$0.00
4100-110-01-0542
Phillipsburg
Phillipsburg M.S.
3 TCU's for swing space
Other
Temporary Classroom Unit
Completed
$151,910.00
$151,910.00
$151,910.00
$0.00
4160-080-00-0468
Plainfield
DeWitt D. Barlow E.S.
Boiler Replacement
Health & Safety
Rehab of Existing Facility
Completed
$136,965.00
$136,965.00
$136,965.00
$0.00
4160-150-00-0469
Plainfield
Jefferson E.S.
Install heating and ventilation systems
Health & Safety
Rehab of Existing Facility
Completed
$358,000.00
$358,000.00
$358,000.00
$0.00
4160-190-00-0470
Plainfield
Woodland E.S.
Ceiling work, emergency lighting etc
Health & Safety
Rehab of Existing Facility
Completed
$92,500.00
$92,500.00
$92,500.00
$0.00
4630-050-02-0513
Salem City
Salem H.S.
Total replacement for wiring for fire alarm system, replacement of HVAC
School Facility Project
Rehab of Existing Facility
Completed
$581,332.26
$581,332.26
$581,332.26
$0.00
4630-050-03-0151
Salem City
Salem H.S.
Replacement of interior auditorium doors as well as exterior doors in A, B and C wings.
School Facility Project
Rehab of Existing Facility
Completed
$185,265.85
$185,265.85
$185,265.85
$0.00
5210-050-03-0658
Trenton
Trenton Central H.S.
The Trenton School District has proposed to renovate two existing vocational classrooms to create an electronic training center. The program is currently part of the high school's curriculum.
School Facility Project
Rehab of Existing Facility
Completed
$202,979.25
$202,979.25
$202,979.25
$0.00
5210-100-05-0AIA
Trenton
Grace A. Dunn M.S.
The scope of work includes services for Fire Code deficiency abatement and Fire Suppression Systems installation in basement area.
School Facility Project
Rehab of Existing Facility
Executed
$95,619.00
$95,619.00
$95,619.00
$0.00
5210-190-02-0146
Trenton
Franklin E.S.
.Fire Door and Safety work
School Facility Project
Rehab of Existing Facility
Completed
$81,430.00
$81,430.00
$81,430.00
$0.00
5210-501-02-0147
Trenton
Bellevue E.S.
Fire door and safety work
School Facility Project
Rehab of Existing Facility
Completed
$70,330.00
$70,330.00
$70,330.00
$0.00
5210-N02-01-0912
Trenton
Daylight/Twilight Alternative High School
The scope of work includes land acquisition of a site with a partial vacant lot area between two existing buildings. A proposed new high school will constructed through the use of the existing bldgs and open site area.
School Facility Project
New Construction
Executed
$39,685,147.00
$39,685,147.00
$39,685,147.00
$0.00
5210-N08-04-0EAB
Trenton
Wilson Middle/Elementary School
Emergent Roof Repair
School Facility Project
Rehab of Existing Facility
Executed
$0.00
$0.00
$0.00
$0.00
5240-060-01-1019
Union City (Hudson Co.)
Union Hill H.S.
Windows and emergency lighting repairs, electrical upgrades.
Health & Safety
Rehab of Existing Facility
Completed
$232,000.00
$232,000.00
$232,000.00
$0.00
5240-080-01-1139
Union City (Hudson Co.)
Sara M. Gilmore E.S.
Emergency lighting, exit signs, smoke and heat detectors & electrical repairs
Health & Safety
Rehab of Existing Facility
Completed
$54,000.00
$54,000.00
$54,000.00
$0.00
5240-090-01-1138
Union City (Hudson Co.)
Hudson E.S.
emergency lighting & Fire alarm renovations
Health & Safety
Rehab of Existing Facility
Completed
$151,478.00
$151,478.00
$151,478.00
$0.00
5240-100-01-1170
Union City (Hudson Co.)
Jefferson E.S.
Emergency lighting repairs and renovations and fire alarm upgrades.
Health & Safety
Rehab of Existing Facility
Completed
$168,617.00
$168,617.00
$168,617.00
$0.00
5240-110-01-0497
Union City (Hudson Co.)
Roosevelt E.S.
Conversion of 2 rooms into 2 new rooms
School Facility Project
Rehab of Existing Facility
Completed
$209,800.00
$209,800.00
$209,800.00
$0.00
5240-110-01-1018
Union City (Hudson Co.)
Roosevelt E.S.
Remove & Replace emergency Lighting, Battery Packs, Add visual Alarms & Strobes
Health & Safety
Rehab of Existing Facility
Completed
$75,888.00
$75,888.00
$75,888.00
$0.00
5240-110-02-0602
Union City (Hudson Co.)
Roosevelt E.S.
Renovation of Kindergarten classroom to create 2 rooms and toilets for each room; renovation of media center to include a 4th grade classroom
School Facility Project
Rehab of Existing Facility
Completed
$242,950.00
$242,950.00
$242,950.00
$0.00
5240-115-01-1171
Union City (Hudson Co.)
Christopher Columbus
Emergency Lighting, smoke detectors, Fire alarm upgrades
Health & Safety
Rehab of Existing Facility
Completed
$38,988.00
$38,988.00
$38,988.00
$0.00
5240-120-01-0496
Union City (Hudson Co.)
Washington E.S.
Conversion of home ec into classroom and home ec
School Facility Project
Rehab of Existing Facility
Completed
$163,750.00
$163,750.00
$163,750.00
$0.00
5240-130-02-0564
Union City (Hudson Co.)
Robert Waters E.S.
Repair to an existing fence and replacement of sidewalk around the fence. The fence and sidewalk are located around the perimeter of Robert Waters ES
School Facility Project
Rehab of Existing Facility
Completed
$94,518.00
$94,518.00
$94,518.00
$0.00
5240-x01-01-0551
Union City (Hudson Co.)
Hudson Milestone Daycare (-x01)
Renovation to existing daycare center
School Facility Project
Rehab of Existing Facility
Completed
$37,200.00
$37,200.00
$37,200.00
$0.00
5240-x02-01-0552
Union City (Hudson Co.)
47th Street Daycare (-x02)
Renovation to existing daycare center
School Facility Project
Rehab of Existing Facility
Completed
$52,465.00
$52,465.00
$52,465.00
$0.00
5240-x07-01-0571
Union City (Hudson Co.)
Union City High School and Athletic Complex
Demonstration Project - Land acquisition and construction of new HS and parking structure.
School Facility Project
New Construction
Executed
$178,808,735.00
$174,801,796.00
$174,801,796.00
$4,006,939.00
5390-050-03-0868
Vineland City
Vineland Senior H.S. South
Renovation to an existing science lab and alteration of an existing classroom into an additional science lab.
School Facility Project
Rehab of Existing Facility
Completed
$399,374.00
$399,374.00
$399,374.00
$0.00
5390-055-03-0491
Vineland City
Landis Intermediate School
Chilled water line and heated water piping insulation replacement.
School Facility Project
Rehab of Existing Facility
Completed
$282,740.00
$282,740.00
$282,740.00
$0.00
5390-055-03-0555
Vineland City
Landis Intermediate School
Renovations of an existing district owned building, adjacent to the Landis Intermediate School, for temporary classroom space. This project is to support 5390-n01-02-0176 Vineland MS#1 and then 5390-N02-02-0245 Middle School #2
School Facility Project
Rehab of Existing Facility
Completed
$460,785.00
$460,785.00
$460,785.00
$0.00
5390-090-00-0516
Vineland City
Cunningham E.S.
Upgrade stair enclosures, Replace doors and hardware, Upgrade exit and emergency lighting systems, Replace fire alarm system
Health & Safety
Rehab of Existing Facility
Completed
$364,931.72
$364,931.72
$364,931.72
$0.00
5390-095-03-0549
Vineland City
Dane Barse E.S.
Upgrades to existing electrical systems including new electrical system including new elctrical service, wiring and receptacles.
School Facility Project
Rehab of Existing Facility
Completed
$644,701.97
$644,701.97
$644,701.97
$0.00
5390-115-00-0569
Vineland City
John H. Winslow E.S.
Replace interior doors and hardware, Replace fire alarm system, Upgrade exit and emergency lighting systems
Health & Safety
Rehab of Existing Facility
Completed
$220,006.05
$220,006.05
$220,006.05
$0.00
5390-120-00-057x
Vineland City
Johnstone E.S.
Replace all exterior doors and hardware, Replace all windows, Upgrade building exterior
Health & Safety
Rehab of Existing Facility
Completed
$238,529.00
$238,529.00
$238,529.00
$0.00
5390-135-00-0567
Vineland City
Marie Durand E.S.
Replace all exterior doors and hardware, Replace all windows, Upgrade building exterio
Health & Safety
Rehab of Existing Facility
Completed
$263,572.09
$263,572.09
$263,572.09
$0.00
5390-260-00-0568
Vineland City
Dr. William Mennies E.S.
Replace interior doors and hardware, Upgrade exit and emergency lighting systems, Replace fire alarm system
Health & Safety
Rehab of Existing Facility
Completed
$282,839.44
$282,839.44
$282,839.44
$0.00
5390-N05-04-000C
Vineland City
Pre-K-5 School
Demonstration Project - New Pre-K to 5 school plus various community features.
School Facility Project
New Construction
Completed
$57,443,898.00
$54,761,210.00
$54,761,210.00
$2,682,688.00
5670-070-01-1199
West New York
Number 3 E.S.
Replace interior doors and hardware, Upgrade egress, exit and emergency lighting systems, Replacement of existing underground receptacles, Upgrade fire alarm system, Upgrading all bathrooms
Health & Safety
Rehab of Existing Facility
Completed
$582,119.34
$582,119.34
$582,119.34
$0.00
5670-080-01-1200
West New York
Number 4 E.S.
Upgrade egress, exit and emergency lighting systems, Replacement of existing underground receptacles, Upgrade fire alarm system, Upgrading all bathrooms.
Health & Safety
Rehab of Existing Facility
Completed
$577,844.34
$577,844.34
$577,844.34
$0.00
5670-080-03-0348
West New York
Number 4 E.S.
Chimney Replacement
School Facility Project
Rehab of Existing Facility
Completed
$221,179.00
$221,179.00
$221,179.00
$0.00
5670-090-01-1201
West New York
Number 5 E.S.
Upgrade egress, exit and emergency lighting systems, New Fire Sprinklers, Replacement of existing underground receptacles, Upgrade fire alarm system, Upgrading all bathrooms, Upgrade electrical distribution.
Health & Safety
Rehab of Existing Facility
Completed
$575,808.34
$575,808.34
$575,808.34
$0.00
#Rows On Page: 127
$722,051,235.41
$709,235,983.41
$709,236,083.41
$12,815,252.00
#Rows On Report: 127
$722,051,235.41
$709,235,983.41
$709,236,083.41
$12,815,252.00
Report Was Generated on 8/28/2008 4:44:27 AM Version .Net 7.1.200001